Blinds, shutters and solar shading: the execution standard

Intended for team leaders, foremen and site managers working on the building envelope (CFC 221), this section covers the rigorous integration of shutters and solar shading. From forming the lintel opening to fixing onto external insulation, it details the mechanical constraints, airtightness and coordination of interfaces before and after the structural work, in strict compliance with standards SIA 342 and SIA 180.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

OTConst art. 22

100 cm

Minimum height of the top rail of the perimeter guardrail above the walking surface

OTConst art. 23

2 m

Unprotected fall height from which the perimeter guardrail is mandatory

OTConst

3 m

Fall height from which a facade scaffolding must be installed for building work

OTConst art. 22

15 cm

Minimum height of the toe board on a perimeter working guardrail

Technical scope and trade boundaries

The installation of external shutters and solar shading is a critical phase for the thermal envelope and the management of solar gains. This section details the works attached to the trade of the facade builder and external joiner (CFC 221): add-on boxes or boxes integrated in the reveal, guide rails, adjustable brise-soleil, fabric blinds and their structural anchorages on raw masonry, reinforced concrete or secondary frames of ventilated cladding.

Every intervention on the finished envelope requires control of wind loads in accordance with standard SIA 342, while preserving the continuity of the thermal insulation and the airtightness required by standard SIA 180. A badly sized bracket creates an unacceptable linear heat loss or tears out the insulating build-up under the effect of air suction. Anticipating the interfaces avoids blind drilling and irreversible damage to the external renders.

  • Included in the trade: mechanical fixing of boxes, checking the plumb of the guide channels, thermal packing of the plates and installation of the curtains.
  • Included in the trade: dimensional coordination of the lintel openings with the civil engineer and the mason before pouring.
  • Excluded from this section: connection to circuit breakers, pulling cables upstream of junction boxes and programming of home automation cards (CFC 232).
  • Excluded from this section: structural profiles of an aluminium or steel curtain wall (CFC 215).

Organisation of the technical path and intervention logic

The path of this section follows the chronology of site operations closely, from the design of the raw recesses to maintenance operations during use. The classic mistake is to choose the closing mechanism once the masonry has been delivered, condemning the works to a loss of daylight clear opening or to structural thermal bridges on the underside of the lintel.

  1. Structural work phase and design of volumesChapters D5-01 and D5-02 set the template for the openings and guide the choice between technical fabric and profiled slats according to the wind exposure of the site.
  2. Structural work phase and fixing of the envelopeChapters D5-03 and D5-04 deal with the transfer of loads by thermally broken brackets through the insulation and the rigorous squaring of the side guides.
  3. Technical interfaces and automationChapters D5-05 and D5-06 clarify the limit of services with the electrician and the aerodynamic positioning of the safety anemometers.
  4. Specific cases, renovation and operationChapters D5-07 to D5-10 cover thermal refurbishment, fixed passive brise-soleil, contractual maintenance and the safety marking of workstations.

Compliance with the rules of the trade protects the company against water-ingress claims and deformation under cyclic loading. Art. 229 CP imposes criminal penalties for violating the recognised rules of construction where this endangers the life or physical integrity of persons. A solar shading torn off by a gust directly engages the liability of the installers and of the technical supervision.

📘 Chapters in this section 10

Blinds, shutters and solar protection

Blind box: the recess is decided before the structural work, not after

Fix the slat package during the structural work to save the lintel insulation.

Blinds, shutters and solar protection

Fabric or slatted blind: what exposure and wind demand

Select the right frame so that the fabric does not flap with every gust.

Blinds, shutters and solar protection

Fixing an awning to an insulated façade: through-bolted brackets and wind load resistance

Anchor firmly into the load-bearing concrete without degrading the thermal performance of the insulation.

Blinds, shutters and solar protection

Lateral guidance: parallelism of the guide channels, clearance and limit switch adjustment

Align the guide channels to the millimetre to eliminate any jamming of the slats on the way down.

Blinds, shutters and solar protection

Motorisation: electrical provisions, control and coordination with the electrician

Define your cable outlet precisely to lock in the interface with the electrician.

Blinds, shutters and solar protection

Wind sensor: the safeguard that avoids replacing the awning at the first storm

Position the anemometer outside turbulence zones so that the curtain is raised in time.

Blinds, shutters and solar protection

Roller shutter in renovation: surface-mounted installation, loss of daylight opening and box airtightness

Fit a compact box in renovation while preserving the clear interior glazing opening.

Blinds, shutters and solar protection

Fixed sunshade: orientation, overhang and winter solar gain

Calculate the overhang to block the summer sun without darkening the room in winter.

Blinds, shutters and solar protection

Maintenance of solar shading: planned access, service intervals and maintenance manual for the client

Organise technical access to make periodic maintenance safe without an improvised platform.

Blinds, shutters and solar protection

Installing at height above a walkway: cordoned-off zone and secured tools

Secure handling above walkways to neutralise the fatal risk of crushing.