Roofing: tiles, slates and fixing on battens: the execution reference

This section covers the sizing, laying and inspection of coverings for pitched roofs. Intended for team leaders, foremen and site managers, it brings together the rules of good practice for calculating the gauge, battening, fixing under wind loading, and the installation of slates and metal roofing. It recalls the requirements of SIA 232/1 to guarantee the watertightness and durability of the structure.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 41 OTConst

2 m

Fall height requiring perimeter protection on the roof

art. 41 OTConst

60°

Limit pitch requiring the use of scaffolding or a platform

art. 22 OTConst

100 cm

Minimum height of the top rail of the perimeter guardrail

art. 22 OTConst

15 cm

Minimum height of the toe board of the site guardrail

Scope and limits of this section

This section covers exclusively the laying of the pitched roof skin and its guiding components in accordance with SIA 232/1. It details the behaviour of clay or concrete tiles, natural slate and standing-seam metal roofing, from assessing the minimum pitch through to the final alignment check.

Under the Code of Obligations (CO), the roofer is required to check the condition of the substrate before laying the battens and to give notice of defects to the client if the roof structure shows excessive deflection or centre-to-centre spacing deviations that do not comply with the laying specifications.

Execution sequence and site methodology

Executing a roof covering requires strict adherence to the sequence of operations in order to preserve the integrity of the underlay and ensure permanent protection against the weather throughout the construction site phase.

  1. Pitch analysis and gauge calculationValidate the roof slope according to the tile model and determine the exact distribution of courses over the length of the rafter span.
  2. Battening and setting outFix battens of appropriate section, providing for under-covering ventilation, and use a gauge rod on the roof to avoid any visible adjustment later.
  3. Fixing and securing exposed areasNail or clip the tiles at verges, ridges and eaves according to wind exposure and local terrain.
  4. Finishing and acceptanceInstall the dry-fixed ventilated ridge elements, check the geometry of the abutments and inspect the overall visual alignment from the ground.

📘 Chapters in this section 10

Roof covering: tiles, slates and installation on battens

Minimum roof pitch: what the tile model and exposure require

Select the appropriate model to guarantee watertightness according to the actual pitch of the roof slope.

Roof covering: tiles, slates and installation on battens

Battening: calculating the exposed lap and spacing the courses without visible make-up

Master the batten distribution calculation for a regular gauge without unsightly cuts.

Roof covering: tiles, slates and installation on battens

Fixing tiles: which rows, which zones, and what the wind requires

Size the anchorage of your tiles according to the wind loads of the region.

Roof covering: tiles, slates and installation on battens

Ventilated ridge: ridge closer, dry fixing and abandoning mortar

Build a durable ventilated ridge without mortar, respecting the underlay.

Roof covering: tiles, slates and installation on battens

Roof verge: verge tile, metal strip and wind resistance

Protect the verges against uplift by combining tiles with turn-down edges and metal edge strips.

Roof covering: tiles, slates and installation on battens

Natural slate: hook fixing, headlap and sorting of pieces

Apply methodical sorting and hook fixing of natural slates according to exposure.

Roof covering: tiles, slates and installation on battens

Standing seam metal roofing: fixed and sliding clips, thermal expansion

Manage the thermal expansion of standing-seam metal pans through the play of the clips.

Roof covering: tiles, slates and installation on battens

Replacing a broken tile: moving about without breaking ten others

Replace a damaged element safely without damaging the adjacent tiles.

Roof covering: tiles, slates and installation on battens

Snow guards: where to place them, how many rows, and what they are anchored to

Install snow guards on the battening to prevent roof slides.

Roof covering: tiles, slates and installation on battens

Acceptance of a roof covering: alignment, laps and inspection from the ground

Validate alignments and overlaps before final handover of the roof covering.