Metalwork (sheet-metal roofing): forming, joints and expansion: the execution reference

This section is intended for site managers, foremen and team leaders dealing with made-to-measure folded-metal work on pitched roofs. It details the choice of metals, prevention of galvanic coupling, connections by seaming or tin soldering, the handling of expansion and the execution of flashings and trims. It sets out the strict boundaries with flat-roof waterproofing and facade cladding.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 41 OTConst

2 m

Fall height triggering the obligation of fall protection

art. 41 OTConst

60°

Maximum roof pitch for working without a platform or special scaffolding

art. 22 OTConst

100 cm

Minimum height of the top rail of a perimeter guardrail

art. 22 OTConst

15 cm

Minimum height of the construction site protective toe board

Scope and limits of sheet-metal work

The sheet-metal and roofing trade (CFC 224) covers measuring, setting out, workshop forming and on-site installation of the metal elements intended for collecting and draining rainwater, and for protecting the critical points of the pitched roof. The rules of the trade are governed by standard SIA 232/1 and the guidelines of Enveloppe des édifices Suisse.

  • Included in this section: eaves strips, parapet copings, valleys, gutters, masonry flashings, aprons, chimney back-gutters (saddles), seams and expansion joints.
  • Excluded (CFC 226): synthetic or bituminous waterproofing of flat roofs, terraces, roof terraces and buried structures.
  • Excluded (CFC 214): timber roof structure and load-bearing structures serving as a support for the sheet-metal elements.
  • Excluded (CFC 221): facade cladding with metal cassettes, claddings and external joinery.
  • Excluded (CFC 212): installation of roofers' bridges and safety scaffolding.

Organisation of the section and learning logic

The technical progression follows the logical path of the metal, from its physico-chemical selection to the repair of old works. Each chapter provides the calculation methods, workshop tolerances and installation actions needed to guarantee the long-term watertightness of roofs.

Summary of the main sheet-metal interventions on roofs
Work areaPriority checkpointsTechnical reference
Materials & jointsElectrochemical compatibility, seam overlap, tin solder dosageSIA 232/1
Expansion & fixingsSliding clips, thermal expansion joints, maximum length without a breakGuidelines of Enveloppe des édifices Suisse
Joints & chasesDepth of the chase in the masonry, fitting of the cover flashing, flexible apronsSIA 232/1

📘 Chapters in this section 10

Tinsmithing: shaping, junctions and thermal expansion

Zinc, copper, stainless steel or aluminium: metal compatibility and runoff water

Master galvanic coupling and run-off sequence to prevent premature destruction of the metals.

Tinsmithing: shaping, junctions and thermal expansion

Metal expansion: maximum length of an element and expansion joint

Size expansion joints and sliding clips to absorb thermal variations without tearing.

Tinsmithing: shaping, junctions and thermal expansion

Seaming and soldering: joining metal without creating a weak point

Make watertight seams and master tin soldering on zinc, copper and stainless steel.

Tinsmithing: shaping, junctions and thermal expansion

Flashing against masonry: chase, apron flashing and cover strip

Secure masonry penetrations with a clean chase and an effective cover flashing.

Tinsmithing: shaping, junctions and thermal expansion

Metal valley: effective width, slope and overlap of the adjacent roof coverings

Calculate the effective cross-section and the crimping of the edges to guarantee drainage of heavy downpours.

Tinsmithing: shaping, junctions and thermal expansion

Fabrication in the workshop: calculating the developed length, the bending sequence and the tolerances

Optimise your developed lengths, anticipate the thickness of the folds and reduce offcuts in the bending workshop.

Tinsmithing: shaping, junctions and thermal expansion

Eaves drip strip and drip edge: protecting the wall plate and throwing water clear of the façade

Throw the drip clear of the facade and durably protect the timber of the wall plate.

Tinsmithing: shaping, junctions and thermal expansion

Parapet coping: inward slope, fixing and joints

Ensure the fall towards the inside of the roof and design concealed, watertight sliding fixings.

Tinsmithing: shaping, junctions and thermal expansion

Flashing a chimney: upslope apron, back gutter, and why the high side decides everything

Design a self-cleaning upstream back-gutter and adapt the joint to the pitch of the roof slope.

Tinsmithing: shaping, junctions and thermal expansion

Old perforated metal roofing and flashing: repair or replace, and the patch trap

Distinguish lasting repairs from false solutions that aggravate corrosion beneath a perforation.