🧱 CFC 224Rainwater drainage: gutters and downpipesChapter 5 of 10 in the section

Connecting to the network: manhole, trap and separation of waters required in Switzerland

This chapter details the technical and administrative rules for connecting a pitched-roof downpipe at the foot of the façade. You will learn how to size and position trapped settling manholes, strictly comply with the separate system required in Switzerland, give priority to infiltration on the plot and prepare the compliance file to pass the municipal inspection without costly rework.

Key takeaways

  • The rainwater connection requires strict separation of the collectors to prevent any discharge to the wastewater treatment plant.
  • Direct infiltration on the plot remains the priority before any discharge into the municipal public drainage network.
  • The settling manhole with removable basket must remain accessible to allow regular cleaning out of sediment.
  • The municipal inspection of the drainage validates the installation before backfilling, failing which corrective excavation work will be required.

Separate the waters and infiltrate on the plot to comply with Swiss requirements

The fundamental principle in Switzerland, governed by federal water protection legislation and the technical guidelines of the Swiss Water Protection Association (VSA), is separate drainage. Rainwater from pitched roofs is unpolluted water. It must under no circumstances be directed to the domestic wastewater (EU) network. A connection error needlessly overloads municipal wastewater treatment plants (STEP) during violent storms and causes serious backflow for neighbours. Correcting a wrong connection after the asphalt has been laid or the landscaping completed entails considerable rework costs, requiring trenches to be opened with a breaker and the pipes to be redone by underpinning.

If the ground requires discharge to the municipal collector, the contractor must ensure that the receiving pipe actually belongs to the public rainwater or combined network according to the municipality's general drainage plan (PGEE). If there is any doubt about the nature of the pipe found at the edge of the excavation, art. 365 CO applies: if the material supplied by the client or the ground designated by them is found to be defective, or if any other circumstance jeopardises the proper or timely execution of the work, the contractor must immediately inform the client, failing which they bear the consequences (para. 3). This duty to notify avoids making wrong connections to an unsuitable network.

Methods of draining roof rainwater in Switzerland
Drainage methodRequired conditionsTechnical advantagePoint of attention
Infiltration on the plotLoose permeable soil and sufficient groundwater levelComplete relief of the networks and elimination of discharge chargesCompliance with a minimum safety distance from the foundations
Separate rainwater network (EC)Public rainwater collector accessible in front of the plotDirect and safe drainage of storm peak flowsRisk of accidental inversion with the wastewater pipe
Municipal combined collectorNo dual public network and ground unsuitable for infiltrationOnly solution permitted by derogation from the municipal departmentFrequent obligation to provide regulated temporary retention

Installing the trapped settling manhole and passing the municipal inspection

The link between the sheet-metal downpipe (copper, titanium-zinc or powder-coated sheet) and the buried pipe must be made by means of a trapped settling manhole, installed at the foot of the façade on a lean concrete base. At the bottom of a pitched roof, the speed at which the water falls requires a carefully made transition to absorb the dynamic pressure. This precast concrete or polypropylene unit performs three functions: trapping sand and heavy sediment by settling, retaining floating matter and plant debris by means of a removable filter basket, and forming a hydraulic trap against odours rising back when the line joins a combined network. The base of the downpipe is often protected from mechanical impact by a cast-iron or stainless-steel shoe two metres high.

  1. Excavation and foundationExcavate the trench below frost depth, compact the bed with a layer of blinding concrete and set the receiving chamber perfectly level.
  2. Connecting the downpipeFit the foot of the shoe into the socket of the manhole without a watertight clamp, to allow free thermal expansion of the roofing metal.
  3. Installing the filtration elementsInstall the removable stainless-steel screening basket and adjust the removable trap partition that ensures gas-tightness.
  4. Visual check and flow testPour in clear water mixed with tracer dye to confirm the exact path to the authorised outlet before any backfilling.

Permanent accessibility of the manhole determines the effectiveness and compliance of the installation over time. The cover or grating must be flush with the final surfacing of the external areas, whether paving, vehicle-bearing cobbles or a gravel bed. Burying a manhole under a layer of topsoil is a clear execution defect that prevents any periodic cleaning of the leaf basket and inevitably leads to overflow along the façade render during heavy rain.

Separation of rainwater networks and rectification of non-compliant connections

The final connection of a rainwater downpipe is not limited to a simple physical socket joint into a stub pipe. In Switzerland, municipal drainage regulations and general drainage plans impose strict separation of the networks: rainwater must follow a route independent of domestic wastewater. Connecting a roof downpipe to a foul-water pipe is a major non-conformity, often committed out of convenience during renovations to avoid trenches across the site. This error causes needless hydraulic overload of municipal wastewater treatment plants during storms and exposes the client to immediate orders for reinstatement.

During the acceptance phase, the municipal technical departments carry out strict checks by injecting smoke or eosin. As soon as an unlawful connection is revealed, the operating authorisation or occupancy permit remains blocked until the route has been completely redone. The rework costs are then exorbitant: sawing through the asphalt surfacing, excavating under paving, laying new separate collectors and rebuilding the connections. Art. 365 CO para. 3 provides that if the material supplied by the client or the ground designated by them is found to be defective, or if any other circumstance jeopardises the proper or timely execution of the work, the contractor must inform the client. The sheet-metal worker therefore notifies site management in writing as soon as a stub pipe presents any uncertainty as to the connection.

  1. Formal identification of the networkCheck the receiving collector with a biodegradable dye or an inspection camera before fixing the downpipe.
  2. Installing the protective shoeFix a cast-iron or reinforced steel element to a minimum height of 1 m above ground to withstand normal mechanical impacts.
  3. Creating a removable jointInsert an expansion sleeve or sliding ring allowing free thermal movement of the metal without loosening the lower socket.
  4. Routing to the compliant outletConnect the base exclusively to the clean-water pipe or the infiltration structure approved in the building permit file.

Accessible manhole, settling and transition to infiltration

The interface at ground level requires an accessible manhole fitted with a settling chamber. The pitched roof inevitably drains tile sand, metal wear particles, pollen and plant debris. The function of the settling manhole is to slow the flow of the water so that solids settle by gravity at the bottom of the chamber, while a removable filter basket intercepts large floating items. This arrangement durably protects the downstream pipe against blockage and provides a direct purge point during periodic maintenance.

Technical comparison of transition systems at the foot of a roof downpipe
Connection configurationSeparation of flows and inspectionMaintenance and cleaning outMunicipal approval
Direct sealed socket joint without manholeVisual inspection impossible, risk of direct discharge into the wrong networkCleaning out very difficult, requiring complete removal of the shoeRefused by the municipal technical departments
Settling manhole with filter basketVerifiable separation, immediate compliance check under the coverManual removal of the basket and cleaning out of the sump without heavy toolsRequired for any rainwater connection or infiltration pre-treatment
Trapped junction boxOdour isolation, useful only on old combined networksNeeds emptying before winter to prevent the water seal freezingTolerated as an exception on a retained combined network

Where the municipal authorisation prescribes drainage by infiltration on the plot, the settling manhole becomes decisive. Whether it is a soakaway, a drainage trench or a cellular infiltration bed, any input of fine particles irreversibly clogs the pores of the geotextile and fills the voids of the filter body. Without an accessible settling manhole to intercept this mineral sludge, the installation loses its absorption capacity within a few years. Reinstatement then involves the complete destruction of the external works to replace the saturated filter body. A cleanable settling manhole guarantees the durability of the structure and final approval at the water inspection.

Managing connection non-conformities and bringing them into compliance

The finding of a wrong connection immediately blocks the administrative closure of the construction site. Connecting the roof to the wastewater network is an offence severely punished by municipal drainage regulations, because these clean volumes needlessly saturate the wastewater treatment plants. Rectification requires heavy work at the foot of the façade: demolition of the external paving, mechanical or manual excavation, sawing through the wrongly routed pipes and fitting of branch junctions. For the sheet-metal worker, this often means reconfiguring the cast-iron shoes, resetting the outlet bends and extending the pipes to a new, entirely independent route.

Where the public rainwater collector is absent or saturated, the municipality requires infiltration on the plot. If this solution had not been prepared, the tradesperson must stop the connections and request a ground permeability analysis. The water collected by the gutters may be dispersed only after passing through an accessible manhole acting as a settling tank. The precast concrete or synthetic inspection unit must include a screening basket and a sufficient water seal to trap moss, tile debris and metal residues. This arrangement protects the drainage trenches or infiltration channels against immediate clogging.

Contractually, art. 368 CO gives the client the right to rectification free of charge if the work is defective or does not comply with administrative requirements. To defuse the financial dispute between trades, the foreman draws up a joint survey of the interfaces between the sheet-metal downpipe foot and the sleeve of the buried network. The new discharge proposal must be submitted to the municipal technical department for formal approval before backfilling. A new tracing test is then carried out in the presence of the authority to record compliance in the works acceptance report.

Frequently asked questions

What does the contractor risk if a downpipe is connected to the wastewater by mistake?

The municipality refuses the connection and suspends the building's compliance. The reinstatement costs are borne in full: demolition of external surfacing, excavation, cutting of the buried pipes and connection to the rainwater collector or to an infiltration system. Under standard SIA 118, this corrective work is at the expense of the company responsible for the routing error. The additional costs of new inspection tests are also payable.

Why must the settling manhole remain accessible at surface level after the external works?

The settling manhole retains sand, roof moss and mineral debris carried by the gutters. If the landscaper or bricklayer covers the cover with soil or asphalt, maintenance becomes impossible. The settling chamber fills with sediment within a few storm seasons, forces rainwater back against the foundations or irreparably clogs the underground infiltration system. A flush cover guarantees periodic emptying of the filter basket.

Can roof water be infiltrated on the plot without prior municipal authorisation?

No, any change to the drainage of surface water requires municipal authorisation and cantonal water management approval. The authority checks the groundwater protection zone, the geological nature of the ground and the absorption capacity of the soil. Even for a standard pitched roof, a technical file stating the catchment area, the permeability coefficient and the sizing of the infiltration structure must be approved before excavation work begins.

How do you connect a downpipe foot to an existing saturated infiltration installation?

Where the ground refuses to absorb the additional rainwater, the tradesperson must refuse the direct connection. An overload causes basement flooding during violent storms. The technical solution is to add temporary retention, such as a buffer tank or an additional cellular volume fitted with a safety overflow. The arrangement necessarily requires prior screening at the foot of the downpipe to remove heavy particles before retention.

Texts and standards cited

  • CO art. 368client's rights in case of defects in the work: refusal, price reduction, rectification, damages
  • norme SIA 118General conditions for the execution of construction work