Skip to content
Website
🧱 CFC 224Penetrations, dormers and special detailsChapter 7 of 10 in the section

Ventilation tiles: how many, where, and why they do not replace a ventilated ridge

On a pitched roof covering, ventilation beneath the roof determines the durability of the roof structure and the thermal efficiency of the insulation. This chapter details the exact method for calculating the required air section, determining the number of units per slope and organising a balanced distribution between the eaves and the ridge, while clearly defining the role of ventilation tiles in relation to the continuous ventilated ridge closer.

Key takeaways

  • The ventilation tile is a localised supplement but never replaces a continuous ventilated ridge over the whole slope.
  • The effective area of a standard ventilation tile generally ranges between twenty and fifty square centimetres of free passage.
  • A strictly alternating distribution between the eaves and the ridge ensures thermal draught without stagnant zones.
  • The integrated mesh prevents birds and rodents from entering without reducing the airflow beneath the roof covering.

Airflow sizing and effective area of ventilation tiles beneath the roof covering

On a ventilated pitched roof, the durability of the counter-battens, the battens and the underlay depends on a constant sweep of air circulating between the roof covering and the waterproofing layer beneath. Swiss professional rules require a minimum continuous ventilation area to remove water vapour originating from inside and to limit summer overheating beneath the tiles. Fitting a ventilation tile is not a decorative choice left to the discretion of the construction site: each element meets a precise free-passage sizing. Manufacturers often state a gross geometric area, but the plumber-roofer and the roofer must always calculate from the net effective area, which is the actual residual opening after deducting the protective grilles and internal baffles.

Average effective areas observed by type of ventilation tile
Ventilation tile typeMain materialIndicative net areaTypical use
Half-round flat ventilation tileClay or concrete20 to 25 cm²Standard interlocking machine-made tiles
Triangular or trapezoidal ventilation tileCopper, titanium-zinc or aluminium40 to 55 cm²Slate or fibre-cement roof coverings
Round ventilation tile with collarPre-coated galvanised steel sheet30 to 45 cm²Metal roof coverings and bitumen shingles
High-flow ventilation tile with baffleProfiled clay50 to 75 cm²Long rafter lengths and converted attics

Protection against birds and rodents is an unavoidable requirement to prevent birds from nesting and to prevent mechanical damage to the underlay sheet. This integrated mesh, made of crimped stainless steel wire or perforated copper sheet, causes an airflow pressure loss and reduces the effective free passage area by thirty to forty per cent. The foreman must ensure that the mesh size is less than or equal to five millimetres. A larger opening would let sparrows or mason wasps through, while a mesh that is too fine would quickly clog with pollen and cobwebs, rendering the ventilation tile completely ineffective within a few seasons.

Distribution on the slope and absolute complementarity with the ventilated ridge

Ventilation beneath the roof covering works by natural thermal draught through the thermosiphon effect: cool outside air enters at the lower part of the slope, warms up in contact with the roofing materials and escapes towards the ridge. Placing ventilation tiles only in the middle of the slope creates harmful stagnation in the lower part of the slope and traps condensed vapour beneath the top. Good practice requires strict symmetry: half of the opening area must be at the eaves and the other half at the top of the slope. Ventilation tiles are installed in a staggered pattern on the tile courses to avoid narrow air channels and ensure uniform airflow across all the rafters.

A common mistake is to try to replace a dry-ventilated ridge with a simple line of ventilation tiles at the top. On a traditional roof structure, the battens fixed to the counter-battens create strictly sealed longitudinal air channels between two lines of battens. A single ventilation tile only ventilates the rafter bay in which it is installed, leaving the adjacent channels without an outlet. The continuous ventilated ridge closer, by contrast, ensures the simultaneous escape of air from all bays without exception. Roof ventilation tiles therefore never replace a ventilated ridge: they act as a complementary supply for very long slopes or to restore the airflow interrupted by a penetration.

  1. Calculate the total area of the slopeMeasure the projected area of the roof in order to determine the required ventilation area for the slope.
  2. Deduct the continuous linear ventilationSubtract the area provided by the eaves grille and the ventilated ridge closer to identify any shortfall.
  3. Position the lower and upper ventilation tilesFix the inlet ventilation tiles at the second course of tiles above the eaves and the outlet ventilation tiles at the second course below the ridge.
  4. Deal with singularitiesPlace a pressure-relief ventilation tile beneath each roof window or dormer and a pick-up ventilation tile immediately above the trimmer.

Sizing of effective areas and top-bottom balancing

Ventilation of a pitched roof beneath the tiles relies on the continuity of the rising airflow between the eaves and the ridge. All too often, ventilation tiles are scattered across the roof by guesswork without any prior calculation of airflow. This kind of disorderly installation creates dead zones and activates no effective thermal draught. A ventilation tile only works if it sits in an air channel bounded by two counter-battens, connecting a lower air inlet to an upper outlet. The nominal area shown in catalogues does not correspond to actual airflow: only the net free passage area counts, after deducting ribs, retention grilles and wind-break baffles.

Effective ventilation areas by roof covering profile
Ventilation element modelGross opening areaEffective net area (with grille)Main use on the roof slope
Clay ventilation tile for plain tiles40 cm²22 to 28 cm²Localised ventilation of a narrow bay or compensation beneath a penetration
Clay ventilation tile for interlocking tiles75 cm²45 to 55 cm²High-level outlet on short slopes without a continuous ventilated ridge closer
Formed metal ventilation tile (zinc or copper)60 cm²35 to 45 cm²Historic roofs, natural slate and junctions beneath recessed gutters

To ensure the removal of water vapour migrating from the attic and to dry the underside of the tiles, the balance rule requires an equal distribution, or one slightly oversized at the upper part. Installing four ventilation tiles at the lower part along the wall plate without their counterpart near the ridge line creates a bottleneck that cancels the draught. When air enters at the bottom, it must necessarily find an equivalent outlet area in the same counter-batten bay. In the absence of a ventilated ridge, the total number of units must satisfy the minimum area prescribed by standard SIA 232, which often requires lining up entire rows of ventilation tiles, to the detriment of the appearance and regularity of the roof plane.

Complementarity with the ventilated ridge and protection against wildlife

The dry-ventilated ridge, executed with a flexible ventilated metal closer or a rigid system beneath the ridge tiles, is the only method capable of providing an uninterrupted linear airflow. On a slope of several tens of square metres, individual ventilation tiles can in no case replace this continuous escape line: a ventilation tile with a net area of 45 cm² only compensates for 0.3 linear metres of a closer delivering 150 cm² per metre. The ventilation tile must therefore be treated for what it is: a bypass element and a localised supplement, never a cheap substitute for a ventilated ridge.

  • Immediately upstream of transverse obstacles: mandatory installation of outlet ventilation tiles beneath roof windows, chimneys and dormers, whose trimmer interrupts the rising airflow.
  • Downstream of penetrations: re-injection of fresh air through inlet ventilation tiles located just above the valleys or the upper connection of dormers, to reactivate ventilation of the upper slope.
  • Beneath closed hips: compensation of skewed bays where the counter-battens end against a sealed hip that does not allow natural escape towards the ridge.
  • On slopes with very long rafter lengths: installation of intermediate ventilation tiles at mid-height when the slope length exceeds 10 to 12 metres, in order to break the hygrometric saturation of the air beneath the tiles.

Mechanical integration of the ventilation tile requires precise adjustment on the supporting batten. Any cutting of a batten to allow the spout of a metal ventilation tile to pass must be reinforced by packing to prevent any sagging of the roof covering. On clay models, the lateral and longitudinal interlocks must be checked without forcing, so that the flashing or drip edge of the ventilation tile aligns exactly with the general water line of the slope, avoiding leaks during driving rain combined with strong gusts of wind.

Diagnosis and remediation of ventilation defects

An airflow failure beneath a tile or slate roof covering rarely shows up in the first month. It is observed during the first winter cycle as runs on the underlay, or in summer as abnormal overheating of converted attics. On pitched roofs where the ventilation tiles were scattered without any draught logic or without correspondence with the air inlets at the eaves, air stagnates in the counter-batten bays. This confinement accelerates fungal rot of the battens and prematurely corrodes the fixing nails.

  1. Checking the outlet and the exhaust openingsCheck for the absence of obstruction by wasp nests, dead leaves or moss on the integrated bird grilles. A ventilation tile whose mesh is clogged loses all of its 25 to 50 cm² of effective exhaust area.
  2. Probing the counter-batten baysLift selected roof covering elements at suspect areas to check the continuity of the flow from the eaves to the ridge. Any transverse obstacle, such as a solid batten or a badly folded flashing, blocks the chimney effect.
  3. Restoring ventilation and duty to notifyIf the original ridge is sealed or has no ventilated closer, adding upper ventilation tiles is an insufficient stopgap to remedy the whole roof. In accordance with art. 365 CO, the contractor immediately informs the client if a circumstance compromises the proper or isolated execution of the work, and prescribes opening up a dry ridge with a ventilated closer to restore a continuous linear area.

In the event of a technical dispute concerning moisture defects, checking the sizing according to the rules of plumbing and roofing makes it possible to distinguish a ventilation defect from an external water leak or a failure of the vapour barrier on the inside of the building.

Frequently asked questions

How do you calculate the number of ventilation tiles to install on a slope?

Sizing is based on the total ventilation area required for the roof, calculated from the slope area according to Swiss technical requirements. The residual area required is divided by the effective area specific to the model of ventilation tile fitted, generally between 25 and 50 cm². The units obtained are then distributed strictly in a lower line near the eaves and an upper line near the ridge, never exceeding a regular spacing of one metre.

Why do ventilation tiles never replace a ventilated ridge?

A ventilation tile only provides a localised, point outlet for a few counter-batten bays. The ventilated ridge closer, by contrast, provides a continuous linear suction along the whole slope, drawing the warm, humid air from each space between rafters. Multiplying ventilation tiles at the upper part creates turbulent and uneven airflows, while leaving unswept dead zones where condensation inevitably builds up over the seasons.

What requirements apply to protection against birds?

Any ventilation opening made in the roof covering must prevent small wildlife from entering. Manufactured ventilation tiles incorporate a metal mesh or calibrated fins whose openings must not exceed 10 mm. If the grille is missing or damaged, birds and rodents get in beneath the roof covering, destroy the thermal insulation below and accumulate twigs that completely block air circulation in the ventilated cavity.

What should be done on an old roof with a sealed ridge and no closer?

The lasting solution is to convert the traditional mortar ridge into a dry-ventilated ridge during a refurbishment. If a localised intervention without complete stripping is required, a dense row of ventilation tiles is installed at the second-last course of tiles below the ridge, paired with an equivalent supply at the eaves. This configuration remains an emergency measure, and the client must be formally warned of its limits in terms of airflow.

Texts and standards cited

  • norme SIA 232Pitched roofs: requirements for design, roof layers and ventilation
  • CO art. 365liability for material and ground: the contractor immediately informs the client if a circumstance compromises the proper execution of the work (para. 3)

In the same section