Key takeaways
- The chase requires a minimum depth of fifteen millimetres in sound masonry to ensure the sealant is watertight.
- The two-piece flashing separates the structural work from the roof in order to absorb differential thermo-mechanical movements.
- The minimum height of the sheet-metal upstand is one hundred and fifty millimetres above the finished roof covering plane.
- Sealing requires a backing rod before the application of an elastomeric sealant resistant to ultraviolet radiation and weathering.
Cutting and sealing the chase: geometry and watertight barrier
The chase provides the upper anchorage and watertightness against run-off water on raw masonry, concrete or calcium-silicate brick. A straight groove is cut with a disc cutter fitted with a dust extraction guard connected to an M-class industrial vacuum cleaner. The cut has a minimum depth of 15 mm, ideally 20 mm, and is given a slight upward slope towards the inside of the wall to prevent any capillary migration. This marking-out requires rigorous flatness to avoid buckling of the sheet metal.
The upstand height against the wall is 150 mm above the tiles or the drainage plane. In mountain regions or on slopes exposed to snow gusts and driving rain, this upstand reaches 200 mm. The cutting line follows the roof profile in regular steps in clay brick masonry, or in a continuous slope if the concrete allows a straight cut without destabilising the bearing edges. Any badly fitted step creates a risk of insidious water ingress beneath the flashing.
- Cleaning and dust removal of the grooveBrush the chase vigorously with a wire brush to loosen cutting residue, then vacuum the slot thoroughly. Check that the edges of the cut are clean, dry, sound and cohesive.
- Inserting and wedging the profileEngage the bevelled upper fold of the flashing carrier strip in the bottom of the groove. Wedge the profile with lead clips or stainless steel metal wedges spaced 30 to 40 cm apart to hold it temporarily in place.
- Installing the backing rodInsert a cylindrical closed-cell polyethylene foam cord of suitable diameter. This sets the depth of the joint and prevents the sealant from bonding on three sides, thus preventing its premature tearing.
- Extruding and tooling the sealantFill the groove with a UV-resistant polyurethane or MS polymer elastomeric sealant. Tool with a bevelled spatula moistened with tooling agent to obtain a chamfer that drains water outwards.
Two-piece flashing and decoupling of differential roof-to-wall movements
The connection between a timber roof structure and a masonry wall is a living joint subject to divergent stresses. The roof structure undergoes variable deflections under snow loads, seasonal hygrothermal dimensional changes and progressive support settlement. Conversely, masonry or reinforced concrete has a much higher structural rigidity. Connecting these two building elements with a rigid one-piece apron flashing sealed into the wall inevitably results in shearing of the metal, detachment of the chase sealant or outright pulling out of the mechanical fixings.
- Two-piece flashing
- Articulated watertightness system comprising a flashing carrier strip fixed and sealed to the vertical wall, combined with an apron flashing or upturned soaker attached to the roof covering. The two components slide over one another without any mutual mechanical attachment.
| Behaviour criterion | One-piece sealed flashing | Articulated two-piece flashing |
|---|---|---|
| Differential movements | Cracking of the sealant or plastic deformation of the zinc | Free sliding of the upstand under the fixed cover strip |
| Roof maintenance | Complete destructive removal to replace one element | Easy removal of tiles without damaging the wall joint |
| Expansion travel | None: stresses transmitted directly to the sealing | Sliding vertical overlap of 60 to 80 mm |
| Reliability over time | Recurrent leaks at the torn joint | Continuous watertightness and proven mechanical decoupling |
Execution of the two-piece flashing relies on the calculated overlapping of the metal developed lengths. The upper flashing carrier strip runs down 80 mm onto the masonry wall to form the protective hood. The lower piece, consisting of a flexible apron flashing or a run of zinc-titanium or copper soakers, rises against the wall by 150 mm without being fixed to it. A free vertical overlap of at least 60 mm is mandatory to guard against wind-driven water backflow. An expansion gap of 5 mm at the top of the upstand prevents any jamming during temperature variations.
Sizing of upstand heights and water clearance
The junction between a pitched roof and a vertical masonry wall is subject to direct stresses: run-off along the façade, splashing of drops onto the roof covering and winter accumulation. The function of the vertical metal upstand is to prevent upward water ingress caused by wind or the slow melting of snow build-ups. Setting an insufficient height is one of the most recurrent defects noted during post-damage expert assessments on pitched roofs.
The upstand is always measured perpendicularly from the finished level of the roof covering (crest of the tile wave, top of the batten or surface of the slate) to the water-shedding drip of the upper profile. In a lowland climate without major wind exposure, this dimension never falls below 120 mm on a longitudinal junction and 150 mm on a transverse junction at the head of a slope. At altitude, from 800 metres or in heavy-snowfall zones of the Plateau and the Prealps, the upstand is increased to reach at least 200 mm to 250 mm in order to prevent capillary rise into compacted snow masses.
| Junction configuration | Roof pitch | Lowland zone (< 800 m) | Alpine / windy zone (> 800 m) |
|---|---|---|---|
| Side junction (along the rafters) | < 25° | 150 mm | 200 mm |
| Side junction (along the rafters) | ≥ 25° | 120 mm | 180 mm |
| Head junction (top of slope against wall) | All pitches | 150 mm | 250 mm |
| Wall exposed to prevailing driving rain | All pitches | 180 mm | 250 mm |
Apron flashing, cover strip and control of differential movements
A timber roof structure breathes, deflects under snow load and undergoes seasonal hygrometric shrinkage, whereas concrete or brick masonry remains rigid. Connecting these two trades with a one-piece folded sheet, nailed to the roof structure and plugged to the wall, inevitably results in shearing of the fixings, tearing of the metal or detachment of the sealing joint. The system of two independent pieces is the only lasting technical solution.
- Two-piece flashing
- Watertightness device separating the upstand attached to the roof (apron flashing or soakers) from the profile attached to the wall (flashing carrier, cover strip or chase). The upper cover strip covers the upstand without direct mechanical connection, allowing free vertical and longitudinal sliding.
The first piece, the lower upstand attached to the roof, follows the movements of the roof covering. On corrugated tiles, this piece incorporates a flexible apron flashing (lead at least 1.5 mm thick or stretchable pre-lacquered aluminium composite) pressed onto the relief of the tiles to follow their curvature. On flat roof coverings in slates or plain tiles, the work is carried out using metal soakers slipped under each course, fixed to the battens without rigid attachment to the wall.
- Installing the flashing carrier strip or chaseMark the line with a chalk line on the masonry. The upper water-shedding profile, fitted with a drip forming a pinch, is mechanically fixed into the masonry or inserted into the groove previously cleaned and cut with a diamond blade.
- Installing the apron flashing or soakers on the roof coveringPosition the lower watertightness elements on the slope with a vertical clearance of at least 120 to 150 mm. The metal pieces are fixed to the timber structure by sliding brackets or wide-head copper nails, without touching the wall.
- Overlapping and locking the cover stripLower the upper piece so that it covers the lower upstand by at least 60 mm (100 mm in windy zones). A vertical expansion gap of 10 to 15 mm is kept at the bottom of the fold to absorb settlement without constraining the sheets.
- Pointing the upper edgeFill the chase or the upper channel of the profile with a bead of UV-resistant polyurethane or hybrid sealant, tooled to a bevel towards the outside to shed façade run-off.
Junction defects, repair of leaks and management of faults
Loss of watertightness at the roof-to-wall junction is one of the leading causes of damage on pitched roofs. When a leak appears under the hip rafter or along the gable wall, the diagnosis must focus first on the mechanical decoupling of the junction. The most frequent error is the installation of a one-piece flashing strip nailed into the masonry and rigidly fixed to the roof structure. The structural shrinkage of the timber and the thermal expansion of the roof then shear the fixings or tear the metal at the fold. Reinstatement requires cutting any rigid connection to restore the principle of the two-piece flashing: a flashing carrier strip attached to the wall and an independent upstand fixed to the boarding or battens.
If the fault comes from the sealant detaching in the chase, a simple surface top-up with a gun is prohibited. The groove must be mechanically cleared of the old degraded polymer bead, dust-free, then deepened if its depth does not reach the required minimum seating of 15 to 20 mm. During this chasing in masonry or render, OTConst art. 33 requires attention to air quality: hazardous mineral dust is discharged to the open air, filtered or diluted, and respiratory protective equipment must be worn if source extraction measures are not sufficient. Repair then requires insertion of a compressible backing rod before injecting an elastomeric sealant of suitable class, tooled to a bevel to shed run-off water.
In the event of a proven defect compromising the work, the regime of the client's rights for defects in the work is governed by CO. The roofing sheet-metal worker carries out the remedial work by removing the deformed soakers or apron flashing. If the upstand height has become insufficient following thermal over-insulation of the roof, the repair necessarily involves raising the chase or fitting an adaptation profile fixed higher on the masonry face.
Frequently asked questions
How do you repair a continuous crack along the chase sealant?
It is pointless to apply a sealant over the torn bead. First cut and scrape out the old sealant with a knife or cutter, remove dust from the groove and check that the chase is at least 15 mm deep. Then insert a foam backing rod to prevent bonding on three sides, and inject a hybrid or polyurethane sealant tooled with a slope towards the outside to ensure lateral adhesion on the masonry.
What solution should be applied if the roof upstand is too short after insulation work?
Raising the insulation build-up reduces the water clearance under the existing flashing. If the apron flashing falls below the required 100 to 150 mm above the roof covering plane, the original flashing carrier must be removed. You must mark out and cut a new horizontal or stepped chase higher up in the masonry, fit a suitable stepping profile, then connect a new flashing carrier covering the independent underlay upstand and the metal soakers.
Why must a one-piece flashing fixed to both the wall and the rafter be prohibited?
The timber roof structure moves under the effect of humidity variations and climatic loads, while the masonry remains stable. A rigid one-piece connection is subject to permanent shearing. The screws eventually pull out, the render bursts around the wall fixings or the sheet tears along the corner fold. The system of two separate elements allows the roof to move freely under the wall cover strip without loss of watertightness.
Which apron flashing should be installed at the junction against a gable wall on corrugated tiles?
On interlocking tiles with pronounced relief or waves, the rigid metal strip cannot follow the troughs. A side upstand is installed, completed by a flexible pleated apron flashing in 1.5 mm rolled lead or stretchable composite aluminium. The apron flashing is shaped by hand with a roofer's mallet into the waves, then pressed carefully onto the curvature of the tile to prevent any water backflow in driving wind.
Texts and standards cited
- OTConst art. 33air quality: the ambient air at workplaces contains between 19 and 21 % oxygen by volume and the limit values for hazardous substances are not exceeded (para. 1); hazardous substances are discharged to the open air, filtered or diluted by artificial ventilation (para. 2); air quality is checked regularly (para. 4); if technical or organisational measures are not sufficient, respiratory protective equipment must be used (para. 5)
- COclient's rights in case of defects in the work: refusal, price reduction, remedial work, damages; any clause agreed in advance that restricts or excludes the right to have defects remedied is void if the defect concerns a building (para. 2bis, since 1 January 2026)