Solar panels on pitched roofs: hooks, watertightness and added loads

This chapter details the execution rules for installing solar collectors on a pitched roof without impairing its watertightness. You will learn how to select and adjust hooks according to the profile of the tile, how to anchor directly into the rafters without loading the battens, how to anticipate structural surcharges and how to route cables without damaging the underlay.

Key takeaways

  • The hook must match the profile of the tile exactly to avoid any rigid contact.
  • Structural anchoring is made exclusively into the rafter, with an adjusted intermediate spacer block.
  • Validation by a civil engineer is required to absorb the added climatic loads.
  • Routing solar cables requires dedicated watertight sleeves passing cleanly through the underlay.

Hook selection and direct anchoring to the rafter

Installing a solar system on a ventilated roof slope begins with a detailed geometric analysis of the roofing elements. A frequent error is to fix the support brackets or hooks directly onto the roof tile battens. The batten or fir lath is sized only to carry the self-weight of the tiles and transfer the load to the counter-battens. It is strictly forbidden to anchor metal hooks onto these secondary elements: under the combined action of wind uplift suction and snow pressure, the batten bends, pulls out or splits the adjacent tiles.

Anchoring must be made into the core of the rafter or roof purlin. To bridge the height of the counter-batten and batten without compressing the underlay build-up, the roofer-plumber fits a spacer block of dried solid timber or marine plywood, with a thickness strictly equal to the stack of counter-batten and batten. The hook base plate rests flat on this stable block. Mechanical fixing is made with stainless steel timber-construction wood screws, with suitable pre-drilling to avoid splitting the rafter, observing the minimum embedment depth in the supporting timber prescribed by the manufacturer.

Suitability of fixing interfaces according to tile type
Type of roofingRecommended hook modelWatertightness point of attention
Clay plain tileExtra-flat hook or replacement metal tileAvoid gaping of the exposed face caused by excess base plate thickness
Ribbed interlocking tileHeight-adjustable hook with offset armPrecise grinding of the lower exposed face in the wave trough
Pan tile or Roman tileHook with large curved spanMust be centred on the crest of the covering curve

Structural loads, technical opinion and underlay penetrations

Adding a photovoltaic or thermal plant changes the balance of forces in the existing roof structure. The self-weight of the panels, aluminium rails and any ballast adds between fifteen and twenty-five kilograms per square metre to the permanent load. However, it is the variable loads that call for maximum rigour: the snow overpressure accumulated in windward drifts and the turbulent suction forces at the verge or ridge exert very high pull-out forces on the end fixings.

Before starting to drill through the roofing, the contractor checks the feasibility of the work. In accordance with art. 365 CO para. 3, if the material supplied by the client or the site designated by the client is found to be defective, or if any other circumstance jeopardises the proper or timely execution of the work, the contractor must inform the client immediately, failing which the contractor bears the consequences. An old roof structure that is undersized or deflected therefore requires the expertise of a timber civil engineer. This specialist verifies the load-bearing capacity of the rafters and determines the permissible spacing of the anchor points.

  1. Locating the rafters under the roofingRemove the tiles bay by bay to locate precisely the axis of the rafters under the underlay layer without tearing the watertight membrane.
  2. Fitting the raising block and local watertight sealingFix the compensating block directly into the load-bearing structure, applying a nail sealing strip under the seating.
  3. Screwing down the hook base plateDrive two double-thread wood screws through the base plate, the block and the counter-batten into the core of the load-bearing rafter.
  4. Routing cables over the roofUse an EPDM sealing collar bonded to the underlay to guide continuous cables without rubbing on metal.

Routing the DC solar cables is the last critical point. The conductors must never rest bare on the sharp edges of the battens or on metal flashings. The UV-resistant protective sheath is housed in cable guides clipped onto the aluminium rails, with a sufficient bending radius to prevent mechanical kinks. Penetration under the roofing must be made by a cable-pass tile fitted with a flexible watertight collar, or by means of a profiled sleeve bonded directly onto the underlay, upslope of the battening, to preserve the draining function of the pitched slope.

Adjusting the hook to the tile profile and structural anchoring

Installing a photovoltaic structure on a pitched roof requires the forces to be taken up directly in the primary framework. The fixing hook must on no account be screwed into a simple batten or roofing lath: these softwood elements of small cross-section (often 24 × 48 mm or 30 × 50 mm) are sized exclusively to hold the tiles against sliding and would bend under the combined effect of self-weight, wind uplift and snow. Mechanical anchoring must be made into the load-bearing rafter, through the counter-batten and the underlay sheet. Two structural wood screws for fittings, of suitable diameter and of a length ensuring an effective anchoring depth in the rafter, ensure full transmission of the mechanical stresses to the roof structure without loading the battening.

  1. Locating the rafter and clearing the roofingAfter temporarily removing the tiles in the installation area, identify the exact axis of the rafter through the counter-battening. Check the condition of the timber and the integrity of the underlay.
  2. Fixing and shimming the basePosition the hook base on the rafter. If necessary, insert a spacer block of hardwood or rot-proof material under the base so as to align the height of the hook foot with the exposed face of the lower row of tiles, then screw the anchor fixings down firmly.
  3. Machining the tile and maintaining the working clearanceGrind the interlock or heel of the upper, overlapping tile with a diamond cutter to create a relief groove. No direct contact must remain between the metal of the hook and the clay, either above or below the arm.
Compatibility of hook types according to the tile roofing
Tile modelRecommended hook typeExecution of the penetrationWatertightness point of attention
Clay plain tileOffset extra-flat hook or integrated substitute metal tileBevelled cut with a diamond blade of the exposed face of the upper tileExcess thickness liable to gape and cancel the minimum watertight overlap
Interlocking mechanical tileThree-dimensionally adjustable bent hook in stainless steel or aluminiumPrecise grinding of the upper and lower interlocking ribsKeeping the barrier against rising water in the side grooves
Pan tile or Roman tileHigh-arch hook passing over the pan of the tileOffset fixing on the rafter with a curved arm emerging in the high waveAbsolutely avoid emerging in the trough of the pan where run-off water converges

Watertight cable routing and validation of roof structure loads

The crossing of the roofing by the DC solar cable strings is a critical singular point for the durability of the work. The conductors must never pass through the tile layer via a simple ground-out gap or be crushed under a tile that does not sit tight: the continuous friction generated by the wind would shear the insulation against the sharp edge, creating an immediate risk of short-circuit and fire. Penetration is made by means of a suitable ventilation tile or a made-to-measure sheet-metal sleeve, fitted with a flexible metal flashing shaped to the profile of the tile and an elbowed outlet pointing downwards to break the water drip. At underlay level, the passage of the cable requires an EPDM sealing collar bonded to the sheet in order to maintain watertightness against water and wind.

Adding a photovoltaic array imposes an additional permanent load on the roof, comprising the self-weight of the panels, rails and fixings (commonly 15 to 22 kg per square metre of area covered). Although this mass seems moderate, it profoundly changes the distribution of forces when combined with snow loads in mountain zones or wind at the verges and ridges. An unforeseen deflection of the rafters can press the hooks against the tiles beneath and cause cascading cracking of the clay. In accordance with the general principles of the contract for work and services recalled in art. 365 CO para. 3, the contractor reports to the client or to the site management any circumstance jeopardising proper execution, which requires the roof structure sizing to be checked by a civil or timber engineer before the system is fixed.

  • Visually check the cross-section, spacing and straightness of the rafters before fitting any hook base.
  • Observe the recommended tightening torque for the structural screws without splitting the grain of the supporting timber.
  • Keep a generous bending radius for the electrical cables to avoid any internal stress on the conductors.
  • Fit protective caps on the sharp ends of the aluminium rails so as not to damage the insulation when pulling cables.

Handling defects: leaks, failure of components and unforeseen overloads

The appearance of defects following the installation of a solar thermal or photovoltaic system almost always reveals an execution fault: a tile split under the effect of wind or snow, a perforated underlay sheet or an unacceptable deflection of the roof structure. When a hook rubs against the clay or a fixing has wrongly been screwed into the batten instead of the rafter, the roofing loses its primary watertightness and leaks degrade the thermal insulation beneath.

  1. Making safe and targeted removalAs soon as a leak or a tile broken under a load-bearing rail is found, secure access in accordance with the rules on working at height in the Ordinance on Construction Work. Remove the panels concerned to clear the area and relieve the mechanical stress on the row of tiles.
  2. Diagnosis of the substrate and notificationCheck the deflection of the rafters and the condition of the timber sections. If the roof structure shows unforeseen deformation under the added permanent load or if the timber shows biological deterioration, suspend the installation. In accordance with art. 365 CO, the contractor reports to the client without delay the defects found in the load-bearing structure that jeopardise the work.
  3. Restoring watertightness and replacing the hookReplace the damaged tile. Grind the heel of the upper tile and adjust the height of the hook to maintain a minimum unloaded clearance of 5 mm above the lower tile. If the rafter is off-axis, fix a structural spacer between two rafters rather than skewing the hook foot.
  4. Correcting the cable penetrationReplace any cable whose sheath has been pinched against an exposed face or a sheet-metal edge. Restore the wind- and watertightness of the underlay by means of an elastomer collar bonded with an approved adhesive tape, then fit a dedicated ventilated cable-pass tile.

Frequently asked questions

How should you react if the hook rests in direct contact with the curve of the lower tile?

The hook must be removed to correct its shimming. Under winter climatic loads and wind, this direct contact concentrates point forces and inevitably causes the clay to break. Insert a spacer block under the base fixed to the rafter, or adjust the leg of the hook to maintain a gap of at least 5 mm to the tile.

What should be done when the alignment of the rails does not coincide with the rafter spacing?

Never fix the hook into the battening alone or screw at an angle into thin air. The solution is to strip the roofing locally in order to fit a trimmer or a rafter doubling integral with the roof structure, sized to take the pull-out forces. The hook base is then bolted or screwed to it with lag screws that comply with the structural requirements.

How should the passage of solar cables through the underlay be handled without risk of leaks?

Free passage through a slit cut in the underlay sheet is prohibited. The conductors must pass through the membrane by a preformed EPDM sealing sleeve, bonded to the substrate by a certified adhesive collar. On the roof surface, the cables run under a cable-pass tile closed by a flexible seal preventing water from rising by capillarity and powder snow from being driven in.

Why is direct anchoring of a solar hook to a roof batten strictly forbidden?

The batten is sized only to support the self-weight of the tiles over a short span. The pull-out force due to wind uplift and the combined weight of the modules and snow would tear out the battening or break it clean. Any anchoring must penetrate structurally into the rafter beneath, to a depth ensuring the mechanical hold certified by the manufacturer.

Texts and standards cited

  • CO art. 365material and site: the contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the site designated by the client is found to be defective, or if any other circumstance jeopardises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).