Key takeaways
- The minimum thickness of the counter-battens must always be adjusted to the total length of the ventilated rafter slope.
- The sealing strip under the counter-batten neutralises the direct infiltrations created by the fixing nails.
- Air continuity requires free air passage sections from the eaves to the ridge.
- At valleys and hips, clear interruptions allow water to drain and air to circulate.
Sizing the counter-batten section and guaranteeing airflow
On a pitched roof, the counter-battening fulfils two inseparable functions: it provides the space needed for ventilation under the roof covering and guides infiltration or condensation water towards the eaves. The section of the counter-batten determines the height of the air gap. Underestimating this thickness slows the thermal draught, promotes the accumulation of moisture under the roofing battens and accelerates the premature deterioration of the roof timbers and tiles through frost in winter.
| Rafter length | Minimum counter-batten thickness | Minimum air inlet section at the eaves |
|---|---|---|
| Up to 10 m | 45 mm | 200 cm² per linear metre |
| From 10 m to 15 m | 50 mm | 250 cm² per linear metre |
| Over 15 m | 60 mm or double counter-battening | 300 cm² per linear metre |
The counter-battening is fixed directly into the rafters through the underlay or sarking membrane. The nails or screws must penetrate at least 50 mm into the load-bearing timber. To maintain the effectiveness of the continuous air gap, the battens must not show any excessive bowing that would pinch the free space. The fresh air drawn in at the eaves drip must circulate without obstruction up to the ridge or hip line, where the exhaust openings must offer a section at least equivalent to the lower air inlets.
Laying the seal under the counter-batten and managing connections at special points
Every perforation of the sarking layer by a mechanical fixing is a potential path for water. Condensation water running along the counter-batten or accidental infiltrations can penetrate to the core of the rafter if the connection is not sealed. Laying a sealing strip under the counter-batten, made of compressible cellular foam or butyl, is mandatory under each batten before final nailing.
- Cleaning the substrateDust off the surface of the sarking membrane along the axis of the rafters. The area must be dry and free of frost or oil to ensure the adhesion of the strip.
- Applying the sealing stripStick the compressible self-adhesive foam strip directly onto the sarking along the axis of the rafter, or pre-glue the underside of the counter-batten before positioning it.
- Mechanical fixing of the counter-battenImmediately nail or screw down the treated timber batten, compressing the sealing material by at least 30% to self-seal each point of penetration.
- Checking the jointsMake sure that no sealing gap remains at the joints between batten lengths and check that the seal is uniformly compressed under the timber.
At valleys, hips or roof penetrations such as dormers and chimney flues, the interruption rule applies strictly. The counter-battens must be cut and interrupted at a minimum distance of 50 to 100 mm from the edge of the metal valley or the flashing. This gap creates a clear channel allowing residual water to slide freely downwards without being trapped by the transverse roofing battens.
During installation work on the roof, the employer takes the necessary measures to prevent accidents in accordance with art. 82 LAA. To protect the installers from the risk of falling at the roof edge, appropriate protective installations are put in place from a height of two metres in accordance with art. 41 OTConst.
Sizing the thickness according to rafter length and pitch
Under the rules of the art of pitched roofing in Switzerland, the counter-batten fulfils two inseparable tasks: providing the ventilation air gap under the roof covering and draining infiltration or condensation water towards the eaves. The minimum thickness of the counter-battening cannot be improvised; it is directly determined by the rafter length, the inclination of the roof slope and the permeability of the covering (clay tiles, concrete tiles, slates or corrugated sheets).
| Rafter length | Roof pitch | Minimum counter-batten thickness | Minimum air inlet section at the eaves |
|---|---|---|---|
| Up to 6 m | Greater than 25° (approx. 47%) | 30 mm to 40 mm | 200 cm² per linear metre |
| From 6 m to 10 m | Greater than 20° (approx. 36%) | 45 mm to 50 mm | 200 cm² per linear metre |
| From 10 m to 15 m | All permitted pitches | 60 mm to 80 mm | 300 cm² per linear metre |
| Over 15 m | Low pitch (less than 20°) | 80 mm to 100 mm (or double battening) | 400 cm² per linear metre |
When the pitch falls below 20°, the rising speed of the air by thermosiphon effect decreases significantly. To compensate for these aeraulic pressure losses, increasing the thickness of the air gap becomes imperative. In addition, a thicker timber section provides greater ground clearance for the battens carrying the roofing elements, thus preventing the battens from sitting in the residual runoff water that flows over the sarking membrane.
Air continuity, laying of sealing strips and special points
Every fixing passing through the sarking is a potential path for water. To guarantee watertightness under the counter-batten, applying a specific sealing strip under the timber is mandatory. This self-adhesive, rot-proof and compressible cellular foam gasket (often PE or EPDM) must be laid continuously on the back of the counter-batten before nailing, or pressed directly onto the waterproofing membrane along the axis of the rafter.
- Applying the sealing strip under the counter-battenUnroll the adhesive strip over the entire underside of the ventilation batten. Make sure that the foam does not protrude excessively at the sides, so as not to retain dust, but fully covers the nailing axis.
- Nailing the counter-battenFix the timber starting from the bottom of the slope. Use twisted nails or galvanised screws. Driving them in must compress the strip by 30% to 50% of its initial thickness in order to block capillary infiltration around the shank.
- Providing drainage interruptionsIn areas where water collects or is held back, cut the counter-batten to leave free passages so that water running over the sarking is never blocked behind the timber.
At special points such as valleys, hips or penetrations for chimneys and roof windows, the counter-batten must under no circumstances abut tightly against the metal flashing work. Near a valley, the counter-batten must be interrupted at a minimum distance of 100 mm to 150 mm from the bottom of the metal sheet. This ensures two vital functions: leaving a clear drainage channel for the water diverted by the valley rafter and ensuring a sufficient transverse ventilation section.
The organisation of the construction site and the safety of the installers remain governed by the federal ordinances. The employer applies the measures suited to the given conditions in accordance with art. 82 LAA, ensuring in particular the compliant installation of the collective fall protection provided for by the ordinance on construction work when accessing the rafter slopes. Any defect in the installation of these structures may moreover incur criminal liability in the event of endangering life or limb under CP.
Handling ventilation and drainage non-conformities under the roof covering
On ventilated pitched roofs, an undersized counter-batten section or the interruption of air flows at special points quickly leads to serious defects: accumulation of condensation under the covering, mould on the rafter timber or direct infiltration through the fixing perforations. As soon as standing water or a crushed air gap is detected, the foreman must intervene before the roofing battens are laid.
- Finding and stopping the battening workMeasure the actual thickness of the air gap along the rafter slope with a rule and check for the continuous presence of the resilient adhesive nail-sealing strip under the battens. If the actual thickness is less than the ventilation requirements or if the strip is missing, suspend the laying of the roof covering.
- Reporting and technical notificationIn accordance with CO, the contractor immediately informs the client if a circumstance compromises the proper execution of the work. Document by photographs the areas of thermal blockage, the air constrictions under the ridge or the backing up of water near the valleys.
- Removal and compliant reworkRemove the non-compliant counter-battens. Remove bent screws or nails, apply a closed-cell polyethylene foam sealing strip along the line, then refit counter-battens of appropriate section, maintaining a clearance of at least 50 mm along the axis of the valleys for drainage.
In the event of a dispute concerning a widespread collapse of the air gap or a refusal to carry out rework on the part of the site management, the team leader records the non-conformities in the construction site diary. A joint report makes it possible to settle technically the extra thicknesses required before the final installation of the tiles or profiled sheets.
Frequently asked questions
Why must the counter-batten not run down to the axis of the valley?
The counter-batten stops at least 50 mm from the valley board or channel in order to leave a free drainage channel. If the timber abuts against the bottom of the valley, it forms a continuous dam that retains gravel, leaves and drip water from the sarking. This accumulation quickly causes the timber to rot and creates a risk of infiltration under the counter-battening.
How can an insufficient air gap be compensated for on a long rafter slope?
When the rafter length exceeds eight metres, the standard counter-batten height of 25 mm no longer allows sufficient ventilation. The air passage must be raised by fixing a counter-batten of larger section (40 to 60 mm) or by doubling the counter-battening with cross-screwing. A continuous air inlet at the foot of the slope and pressure-relief vents at the ridge complete the system.
Which sealing strip should be laid under a mechanically nailed counter-batten?
A nail sealing strip made of closed-cell polyethylene or butyl foam is used, compressed during mechanical tightening. This tape is applied directly under the underside of the counter-batten or onto the underlay before nailing. Its viscoelastic composition immediately seals the hole created by each nail or screw, guaranteeing watertightness against wind-driven rain on the sarking membrane.
What should be done if a counter-battening is interrupted by a dormer or a solar panel?
Penetrations create a transverse barrier that blocks the natural convection of air. Deflector bevels should be installed above the structure and lateral ventilation openings provided by offsetting the adjacent counter-battens. The runoff water collected by the sarking membrane must be diverted cleanly on either side towards the lower bays to avoid any standing accumulation.
Texts and standards cited
- COmaterial and ground: the contractor is liable for the good quality of the material he supplies; if the material supplied by the client or the ground designated by him is found to be defective, or if another circumstance compromises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3)