Key takeaways
- The verge concentrates aerodynamic suction stresses and always requires reinforced fixing.
- The flap tile provides a direct mineral finish, suited to standard geometries without a metal profile.
- The shaped metal verge strip protects the timber roof structure beneath and channels run-off water.
- The roof overhang keeps precipitation away from the facade while keeping the ventilation grille in place.
Treating the roof verge: flap tile, metal strip or stop profile
The gable verge forms the lateral interface of the roof covering. Directly exposed to gusts, it is subjected to considerable aerodynamic suction stresses which tend to lift the edge elements. Three main solutions make it possible to ensure the watertightness and stability of this critical component.
| Technique | Materials | Technical advantages | Point to watch |
|---|---|---|---|
| Flap verge tile | Clay / Concrete | Uniform appearance, fast installation on batten | Fixed overlap imposed by the tile exposure |
| Metal verge strip | Zinc, copper, powder-coated aluminium | Made-to-measure fit, excellent durability | Requires boarding or a verge board |
| Verge profile with wind clip | Shaped sheet metal with clamp | Maximum protection against infiltration in violent wind | Careful soldering and shaping of the joints |
The flap verge tile interlocks directly with the standard tiles and runs down along the edge of the verge. It thus protects the last rafter or the verge board without requiring heavy sheet-metal work. However, on a very exposed building or if the roof geometry is out of square, the metal strip shaped to measure by the sheet-metal worker remains the preferred solution.
Wind fixing, facade overhang and ventilation of the air gap
To guarantee pull-out resistance, verge tiles or metal strips must receive reinforced mechanical fixing. Tiles are screwed with stainless steel screws with EPDM sealing washer directly into the verge batten or tiling batten. Sheet-metal strips are either stapled onto indirect fixing brackets or nailed with twisted-shank nails onto the verge board.
- Checking the substrate and fitting the verge battenCheck the alignment of the last rafter and fit a verge batten or a doubled batten if necessary to compensate for the thickness of the tile flap.
- Fitting the felt or the waterproofing profileEnsure the continuity of the under-roof membrane up to the outer edge of the verge or onto the verge board.
- Reinforced fixing of the verge elementsScrew down each verge tile or fix the metal strip with sliding brackets to allow for expansion of the metal.
- Connecting the ventilationFit the bird guard on the underside while keeping the required air inlet area under the covering.
The roof overhang at the verge protects the facade from wind-driven rain. The underside of the overhang is frequently clad in timber or shaped sheet metal. During this work, make sure that the external thermal insulation of the facade does not block the air inlet under the under-roof. According to art. 82 LAA, the team leader ensures that all individual and collective safety measures are in place for work at an open edge.
To prevent occupational accidents and diseases, the employer takes all measures which experience has shown to be necessary, which are feasible according to the state of the art and which are appropriate to the given conditions; employees assist him.
Federal Act on Accident Insurance (art. 82 LAA)
- Weather guard (garde-grève)
- Shaped metal profile or clamp fitted at the roof verge to prevent rainwater from being driven back under the roof covering element by the prevailing winds.
Wind behaviour at the verge and treatment techniques
The roof verge is the zone most exposed to suction and aerodynamic turbulence. When wind strikes the gable of a building, it is abruptly deflected upwards and sideways, creating extremely high localised uplift forces on the edges of the roof slope. The role of the verge is to close the covering at the side while blocking the infiltration of driving rain and resisting the mechanical stresses caused by gusts.
In site practice on pitched roofs, three main solutions are used to treat the lateral edge of the slope:
- The flap verge tile (or folded-over verge tile): it interlocks with the edge of the last batten and covers the upper part of the gable. It ensures aesthetic continuity with the rest of the clay or concrete covering.
- The metal verge strip under the tile (or sheet-metal flap): the covering stops at a flat tile or a cut tile, and lateral watertightness is provided by a sheet-metal piece shaped in zinc, copper or powder-coated aluminium, slid under the verge tiles.
- The stop profile with raised verge rafter: the roof edge is delimited by a rising metal border against which the covering elements abut, guaranteeing perfect guidance of run-off water.
| System | Main advantages | Limits & points to watch | Installation on site |
|---|---|---|---|
| Flap verge tile | Uniform appearance, fast installation without soldering. | Sensitive to variations in tile exposure, fixed bulk. | Screwed directly onto the verge batten or the verge rafter. |
| Metal verge strip | Made-to-measure adaptability, excellent durability. | Requires the know-how of the sheet-metal worker, material cost. | Fixed onto boarding with concealed stapling brackets. |
| Raised stop profile | Channels water at the edge, tolerates steep pitches. | Risk of leaf accumulation, more rigid appearance. | Laid on the verge rafter with underlying waterproofing membrane. |
Facade overhang, wind resistance and ventilation
The gable roof overhang plays a strategic role in the overall protection of the building. By moving the drip point away from the vertical surface, it protects the render, masonry or cladding against direct wetting during wind-driven rain. A sufficient overhang limits soiling of the facades and protects the substructure joints.
To prevent tiles from being blown off by local suction, fixing in the corner and verge zones must be reinforced compared with the main field. According to standard SIA 232/1, each verge tile must be mechanically anchored. Stainless steel wood screws with EPDM sealing washer are preferred to nails to avoid splitting of the battens and to guarantee durable resistance to uplift.
On the regulatory side and for staff safety when shaping verges at height, the employer applies art. 82 LAA to take all necessary preventive measures. In addition, in accordance with art. 3 OTConst, roofing and sheet-metal work is planned so as to minimise the risk of occupational accidents.
Damage management and repair of wind-induced verge uplift
In the event of an extreme storm or upward gusts exceeding the design values used for dimensioning, the roof verges are the critical zone where damage appears first. Uplift of the first verge tile or tearing off of a metal strip creates a point of air infiltration under the tile exposure which can lead to a chain-reaction stripping of the adjacent bay. The site manager or team leader intervening after damage must immediately apply a methodology of assessment and safe restoration.
- Securing the perimeter and inspecting the substrateCordon off the area on the ground directly below the affected verge to avoid any risk of falling materials. Erect facade scaffolding or an aerial work platform complying with the requirements of the Ordinance on Construction Work. Remove the remaining unstable elements and inspect the verge batten, the edge rafter and the ventilation air gap.
- Checking the fixings and the verge boardingCheck the mechanical strength of the structural timbers. If the verge screws have been pulled out with tearing of timber, the sub-batten or verge batten must be replaced. A fixing re-driven into the same hole has almost no pull-out resistance under wind action.
- Fitting reinforced components and restorationRefix the stop strips or verge tiles by doubling the stainless steel screwing (minimum 4.5 mm diameter with EPDM sealing washer). Make sure to keep a minimum air inlet area at the facade overhang to avoid any internal condensation under the battens.
When dealing with disputes relating to verge uplift, the intervention report must record the batten spacing, the screw penetration length and the condition of the under-roof membrane. Particular attention is paid to the height of the overhang over the facade: if the overhang is insufficient, wind-driven water splashes infiltrate behind the cladding or damage the external insulation render.
Frequently asked questions
How should the fixing of a verge tile be sized in a highly exposed zone?
In an exposed zone or at altitude, each verge tile must be screwed individually into the verge batten or the edge rafter using stainless steel screws with sealing head of at least 4.5 mm diameter. Refer to the recommendations of the SIA standards and to the manufacturers' technical data sheets to adapt the screw density to the pitch and the wind exposure level of the building.
Why must verge ventilation be maintained even with a metal strip?
The metal verge strip ensures watertightness and wind resistance, but it must not block the air inlet to the void under the roof. Without this continuous circulation between the battens, moisture accumulated under the covering causes premature rotting of the battening and rafters. A perforated bird guard ensures ventilation while closing off access to pests.
What should be done if the verge batten is soaked or rotten when replacing the tile?
Refixing a verge tile onto degraded timber is prohibited. The team leader must stop work in the zone concerned, inform the site management and apply his duty of advice in accordance with the Code of Obligations (CO). The verge batten or verge board must be removed and replaced with treated timber of equivalent cross-section before any re-anchoring of the tiles.
What verge overhang should be provided to protect the facade against driving rain?
The roof overhang at the verge must shift the drip point to a sufficient distance from the facade to avoid direct run-off onto the render or cladding. A projection of 80 mm to 150 mm beyond the finished face of the facade, combined with an effective metal drip edge, prevents early deterioration of the renders under the combined action of water and gusts of wind.
Texts and standards cited
- COmaterial and ground: the contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the ground designated by him is found to be defective, or if any other circumstance jeopardises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).