🧱 CFC 224Tinsmithing: shaping, junctions and thermal expansionChapter 9 of 10 in the section

Flashing a chimney: upslope apron, back gutter, and why the high side decides everything

After this chapter, you will be able to design and assemble the complete metal flashing of a chimney stack on all four sides. You will master the layout of the upslope back gutter to divert the water load of the roof slope, the fitting of the step flashings and side channels, the installation of the downslope apron, and compliance with the regulatory fire clearances.

Key takeaways

  • The upslope back gutter diverts runoff towards the side edges before any water can penetrate under the roof covering.
  • The side back gutters and channels guide the collected water without creating zones where it can be retained.
  • The downslope apron simply discharges the runoff onto the tiles and provides the visual closure.
  • The clearance to combustible elements around the flue must strictly comply with the fire protection requirements.

The upslope back gutter and the side channels break the impact of the slope

On a pitched roof, the chimney stack forms a frontal obstacle perpendicular to the line of steepest slope. The entire volume of water collected on the slope above converges directly against the upper wall of the flue. If the upslope work is not designed to split this flow and discharge it sideways, the slightest accumulation overloads the jointing and causes the underlay to become waterlogged. It is in the upper part that the overall watertightness of the penetration is decided: the upslope apron and the back gutter are the real hydraulic shield of the work, while the rest of the flashing serves only for guidance and finishing.

Upslope back gutter
Metal work folded into a ridge or diamond-point shape, fitted behind the upslope face of a penetration to split the runoff water and direct it towards the side channels.

The sizing of the back gutter depends directly on the width of the flue and the roof pitch. The wider the stack, the sharper the central ridge must be, with clear fall slopes towards the upper corners. The unrolled metal (titanium-zinc, copper or pre-lacquered aluminium sheet) rises against the masonry to a minimum height of 150 mm. Under the upslope roof covering, the piece extends well under the battens and counter-battens, with a turned-up water return in a clip or a suitable drip edge to prevent backflow caused by wind or residual snow accumulation.

  1. Marking out and cutting the ridgeTransfer the axes of the stack onto the metal sheet. Mark out the double drainage slope with a minimum of 8 to 10% towards each corner, allowing for the soldering or seaming tabs for the corner returns.
  2. Forming the upstands against the stackFold the vertical upstand against the masonry using the workshop folding machine or the edging pliers. Form a stiffening fold or a hem at the head of the upstand to receive the chase flashing strip.
  3. Connection to the side channelsMake the watertight joint at the two upslope corners by braze-welding on copper or tin soldering on zinc, ensuring an overlap with no counter-slope for the water directed towards the sides.
  4. Interlocking under the roof coveringSlide the apron under the upslope tiles for a developed length of at least 200 mm, with a turned-up edge or safety bead to cut off any capillary rise.

The side back gutters or step-flashing channels take over immediately at the upper corners of the chimney. Depending on the roofing material (plain tiles, interlocking clay tiles or natural slates), the tinsmith installs either a continuous side channel with a water upstand under the tile, or a series of metal step flashings interleaved course by course. Each side piece must overlap the previous one in the direction of flow of the slope, with a longitudinal overlap defined according to the roof pitch, ensuring smooth drainage towards the base of the stack.

The downslope flashing, cheek cladding and control of the fire clearance

Once the water has been diverted around the sides, the downslope face of the chimney receives only the direct rainfall hitting its vertical surface. The downslope apron therefore acts as the final outlet: it collects the water from the two side channels and discharges it directly onto the flat surface of the lower tiles. Formed from malleable sheet metal, rolled lead or a watertight pleated flashing strip, it closely follows the profile of the roof covering to avoid wind uplift without ever restricting the thermal expansion of the metal.

Components of the four-sided flashing according to their hydraulic function
ElementLocationLoadInstallation principle
Upslope back gutterRear of the flueMaximum (slope flow)Double drainage slope, soldered upstand, discharge under the roof covering
Step flashings or channelsSide flanksMedium (side guidance)Stepped interlocking or continuous profile with edge clip
Downslope apronFront of the flueLow (own runoff)Flexible overlap on the roof covering, seaming or formed apron
Cover flashing stripMasonry perimeterProtection of the upper edgesMortar chase or mechanical fixing with flexible joint

Beyond hydraulic performance, the passage of the flue through the roof build-up involves strict constraints dictated by the fire protection requirements of the Association of Cantonal Fire Insurance Institutions. The timber structure (rafters, boarding, counter-battening) must under no circumstances touch the flue liner or the outer wall of the flue. A non-combustible clear space, generally 50 to 100 mm depending on the thermal classification of the installation, must separate the structural timbers from the hot walls.

The air and water tightness of the underlay around the chimney trimmer opening must also respect this fire clearance. The sealing collars applied against the masonry must have an approval suited to the potential contact temperatures. A chase flashing fixed on the upper perimeter of the cladding crowns the metal upstands, permanently protecting the vertical folds against infiltration from water running down the wall.

Assembly sequence and gravity continuity of the four faces

The metal flashing of a chimney stack follows a strict physical logic: water first hits the upslope face. If the upslope apron and its water deflector do not divert the flow towards the side edges flawlessly, the lower elements are immediately overloaded. To guarantee watertightness according to the recognised rules of the trade, installation is carried out in the opposite direction to the gravity flow: first the downslope flashing, then the side back gutters, and finally the upslope apron. Each piece overlaps the one below it, without creating a counter-slope or an area where melted snow could stagnate.

Functions and technical requirements of the four flashing pieces
ComponentHydraulic roleFolding and overlap requirementMethod of fixing to the substrate
Downslope flashingDischarge onto the roof coveringFlexible apron with discharge drip edge, minimum overhang of 150 mm over the tileSliding clips screwed to the battens, without direct nailing of the sheet
Side back guttersSide guidance of the divided flowFolded channels with 120 mm upstand and step flashings interlocked according to the tileFlat clips folded into the edge folds, free expansion
Upslope apronInterception and division of waterUpstand against the flue, diamond-shaped transverse slope, watertight side returnsClamping strip at the masonry joint, 5 mm expansion gap
Upslope cornersCritical flow junctionCorner pieces soldered with 50/50 tin solder with reinforcing gusset, no sharp cutsMechanical seaming under the side upstand, no rigid connection
  1. Marking out and installing the downslope flashingFix the downslope apron using copper or titanium-zinc clips. Form the lower drip edge to follow the profile of the tiles without restraining the metal sheet.
  2. Interlocking the side back guttersSlide the side channels under the folds of the upslope apron and over the wing of the downslope flashing. This overlap guarantees free flow without resorting to sealant.
  3. Forming the upslope water deflectorForm the rear back gutter with two slopes diverging towards the sides. The central ridge directs the roof water towards the two side channels without stagnation.
  4. Head protection with a flashing stripFit a metal cover flashing chased into the masonry to cover the upstands, while allowing for differential thermal expansion movements.

Fire safety, expansion management and acceptance checks

The stack flashing must under no circumstances compromise the thermal insulation or fire safety. The chimney undergoes large temperature variations and structural movements independent of the roof structure. Connecting the sheets rigidly against the flue causes expansion deformations and tears the corner soldered joints. The tinsmith maintains complete separation between the formed metal, the timber substrate and the masonry flue, while respecting the safety distances required against the risk of fire.

  • Check of a minimum slope of 2% on the upslope deflector to prevent standing water from forming.
  • Visual check of the continuity of the soldered joints on the corner pieces at the corners of the upslope apron.
  • Verification that the side back gutters slide freely under the fixing clips to absorb thermal variations.
  • Measurement of the fire clearance between the flue masonry and the roof battens.
  • Inspection of the downslope drip edge to rule out any abrasive rubbing or sharp cutting into the roof covering.

On the construction site, the vigilance of the foreman ensures that the finished work is compliant. Under art. 364 CO, the contractor is liable for the proper execution of the work entrusted to them. An upslope apron laid flat or side channels fixed by direct nailing are major defects that quickly lead to leaks. Before the tinsmith's scaffold is dismantled, a targeted water test on the upslope back gutter confirms the rapid drainage of water towards the bottom of the slope.

Diagnosing leaks and repairing a defective flashing

On a penetration in a pitched roof, any trace of moisture found on the underside of the rafters almost always comes from the upper third of the chimney stack. An undersized upslope back gutter, an internal corner tin-soldered without prior safety folding, or a counter-slope created by settlement of the roof structure turns the upper face into a veritable water-retention basin. As soon as snow accumulates in winter or conifer needles clog the drainage corners, the runoff water rises by capillary action beyond the metal upstands and seeps under the exposed part of the upslope tiles. The downslope flashing and the side aprons merely suffer this overflow: trying to plug the leaks from below with beads of silicone sealant is a professional heresy that traps moisture in the roof structure without ever diverting the main flow.

  1. Removing and checking the upslope underlayRemove the roof covering two courses above the stack to expose the underlay. If it has not been diverted sideways with a diagonal counter-batten forming a drainage channel, the secondary infiltration water enters the thermal insulation directly.
  2. Checking the masonry and duty to notifyCheck the soundness of the flue and the distances to timber according to the AEAI fire protection requirements. Under art. 365 CO, if another circumstance compromises the proper or timely execution of the work, the contractor notifies the client.
  3. Reforming the back gutter with a central ridgeForm a single-piece back gutter with a minimum transverse slope of ten per cent towards each channel. The internal corners receive an added gusset, seamed and brazed, capable of absorbing expansion without breaking.

The downslope junction serves only to discharge onto the slope the water previously guided by the side channels. The lower apron in lead or pleated zinc must simply cover the downslope tiles by at least one hundred and fifty millimetres, with no through-fixing into the masonry. If the upslope side and the sides have diverted the water properly, this apron works as a simple free-flow discharge.

Frequently asked questions

Why must the upslope back gutter necessarily have a central diamond-point ridge?

On a pitched roof, a flat sheet laid behind a chimney creates a dead zone where water, leaves and melted snow accumulate. Forming a back gutter with two slopes inclined towards the cheeks instantly divides the flow towards the side channels. Without this transverse slope, the standing water eventually corrodes the metal by pitting or overflows by capillary action under the overlap of the upslope tiles during violent storms.

What minimum distance must be kept between the metal lining and the flue for fire safety?

The AEAI fire protection requirements impose a minimum safety distance between the outer wall of the smoke flue and the combustible elements of the roof, generally 50 to 100 millimetres depending on the type of flue. The sheet-metal lining must never thermally bridge the flue with the timber battens: non-combustible class A1 thermal insulation is interposed, and metal mechanical fixings must not pass through this fire clearance.

How should the underlay be connected upslope of the chimney stack?

The underlay sheet must never simply be cut off flush with the chimney. Upslope of the trimmer opening, the installer forms an inclined diversion apron using a batten laid diagonally on the rafters. This flexible channel discharges accidental infiltration water or condensation into the neighbouring tile course, beyond the metal back gutter. The membrane is turned up at least 150 millimetres against the masonry of the flue and carefully bonded.

Why is rigid brazing between the downslope flashing and the side channels prohibited?

Zinc and copper have a high coefficient of thermal expansion. Locking the lower corners by rigidly soldering the downslope apron to the step flashings or side channels causes severe mechanical stresses under the effect of summer-winter temperature swings. The metal eventually tears at the root of the fold. The connection must be made with a sliding seam, a free drip edge or a gravity overlap without continuous soldering along the lines where the plane changes.

Texts and standards cited

  • CO art. 365subject matter and site conditions: notification if a circumstance compromises the proper or timely execution of the work (para. 3)