Skip to content
Website
🧱 CFC 224Roofer safety, snow and roof maintenanceChapter 4 of 10 in the section

Safety hooks: positioning, anchoring and periodic inspection

This chapter details the rules for installing pitched-roof safety hooks on the load-bearing roof structure. You will learn how to position the anchor devices while respecting working paths, how to make a compliant fixing to rafters without damaging the underlay, and how to formalise the periodic inspection register for the final handover of the project file.

Key takeaways

  • The positioning of the hooks must ensure continuous, safe access from the eaves to the ridge.
  • The fixing passes through the counter-battens to anchor directly into the solid timber load-bearing member.
  • Watertightness where the underlay is penetrated requires flexible collars suited to the hook model.
  • The inspection register records the initial compliance and determines future use by other trades.

Geometric positioning and mechanical anchoring on the roof slope

The safety hook for pitched roofs fulfils a dual function: it holds the roofer's ladder in place while the slope is being worked and serves as an individual fall-arrest anchor point for later maintenance work. According to art. 82 LAA, the employer must take, to prevent occupational accidents and diseases, all measures that experience has shown to be necessary, that are feasible according to the state of the art and that are appropriate to the given conditions. Installing permanent hooks directly meets this requirement for the solar installers, chimney sweeps and plumbers who will work on the roof after its acceptance.

The layout on the slope follows a logic of access routes. The first hook is positioned immediately next to the secure access point at the bottom of the slope or near an exit dormer. In the main field of the roof, the lateral and longitudinal spacing is determined by the roof geometry and the working radius of lanyards with energy absorbers. A grid that is too wide creates dangerous pendulum angles in the event of a slip on a roof covering of tiles or slates.

Positioning criteria for safety hooks according to the slope configuration
Roof zoneRecommended positionWorking constraint
Access at bottom of slopeImmediately next to where the scaffolding arrives or at the eavesAllows clipping on before leaving the secure means of access.
Main fieldRegular spacing aligned vertically with the raftersGuides the straight placement of roofer's ladders.
Ridge lineAt a maximum distance of 1 m from the ridge edgeSecures ridge, ventilation and plumbing work.
Protruding elementsClose to chimney stacks and roof windowsProvides a direct anchor point for the maintenance of flashings.

The anchoring must never be taken by the battens or boarding alone. The hook's fixing plate must be mechanically connected to a load-bearing element of the roof structure, typically a solid timber rafter with a sound and sufficient cross-section. The special double-thread screws or lag screws recommended by the manufacturer pass through the ventilated counter-battens to bite into the load-bearing timber. At the underlay, piercing the waterproof membrane requires the use of bonded EPDM sealing collars or self-adhesive nail-sealing strips under the metal base plate, in order to prevent any ingress of meltwater or condensation towards the thermal insulation below.

Periodic inspection, traceability and project file

The ordinance on construction work requires rigorous planning and execution of all fall-prevention measures. Art. 29 OTConst provides that where it is technically impossible or too dangerous to install a perimeter guardrail, a facade scaffolding or a safety net or catch scaffolding, equivalent protective measures must be taken and set down in writing with the help of an occupational safety specialist. The use of individual anchor points on the slope falls within this framework of technical exception or short-term maintenance work.

As soon as it is installed by the roofing team, each safety hook undergoes a visual examination and a check of the tightening torque of the anchor screws. The inspection looks for the absence of plastic deformation of the metal, the integrity of the galvanising or stainless steel against atmospheric corrosion, and the perfect stability of the load-bearing element on the underside. If a hook has already suffered the dynamic impact of a person falling or of a heavy load, it must be recorded immediately, removed and replaced, because its elastic properties are irreversibly altered.

  1. Survey and markingIdentify each anchor point installed on a dimensioned roof plan, assigning it a unique identification number engraved on its nameplate.
  2. Visual integrity checkCheck for the absence of weld cracks, surface corrosion, abnormal bending of the shank or play at the anchor head.
  3. Checking the fixingsCheck that the lag screws or through-bolts hold properly in the roof structure and that the supporting timber is free of splitting.
  4. Drawing up the recordRecord the date of the inspection, the name of the competent person, the condition of each device and the deadline for the next periodic inspection.

The durability of the system depends on the transmission of information. The roofer draws up the safety register, which brings together the manufacturers' technical data sheets, the approval certificates of the parts, the as-built drawings showing the exact location of the hooks and the records of the initial inspection. This complete file is formally handed over to the client to be included in the documents relating to the later maintenance of the building. Without this up-to-date project file, any outside contractor is required to refuse to attach protective equipment to anchors whose strength and inspection history are not certified.

Technical inspection procedures and checking of anchors on the slope

Safety hooks installed on a pitched roof are permanent restraint devices. Originally designed to secure the plumber and the roofer during battening and the laying of the roof covering, they remain the exclusive attachment points for later maintenance, chimney sweeping, gutter inspection or the maintenance of solar modules. The reliability of the system depends on the strength of its mechanical connection to the roof structure and on regular verification of its integrity. In accordance with art. 82 LAA, the employer must take, to prevent occupational accidents and diseases, all measures that experience has shown to be necessary, that are feasible according to the state of the art and that are appropriate to the given conditions. This requirement demands absolute rigour when inspecting these vital components.

The positioning and spacing of the hooks must ensure a continuous route along the slopes without any break in attachment. During the periodic inspection, the technician checks that the horizontal and vertical spacing between each hook allows the operator to move while remaining constantly held under tension, without risking a pendulum fall against an eaves edge or a dormer. The anchoring to the load-bearing element must be examined carefully: the hook must in no case be fixed into a simple batten or counter-batten, but firmly lag-screwed or screwed into a rafter or purlin of the roof structure. The craftsman checks for any incipient splits in the roof timber at the fixings, the absence of play in the bolting and the pull-out resistance.

Systematic inspection checklist for a safety hook on a pitched roof
Item inspectedCritical inspection pointsCriteria for rejection or repair
Hook bodyGeometric deformation, twisting, crushing under the roof covering, presence of cracks or corrosion.Immediate replacement if plastic deformation is visible or deep rust pitting on the steel.
Fixing to roof structureTightness of screws or lag screws in the rafter, corrosion of the fasteners, splitting of the load-bearing timber.Retightening to the specified torque or strengthening of the rafters if the timber shows signs of splitting.
Underlying watertightnessWater penetration at the point of passage, condition of the sealing collar and of the underlay sheet.Remaking of the watertight connection with a suitable collar and special adhesive tape for underlays.
Relative positionSufficient clearance of the ring under the tile or slate, no stress on the roof covering material.Regrinding or notching of the tile to avoid any sharp contact with the anchor ring.

Documentary traceability, project file and handover to operators

The responsibility of the plumbing and roofing company does not end with the physical installation of the fittings. Each individual anchor must be listed in a rigorous installation record, handed over to the client at the acceptance of the works in accordance with the SIA 118 standard. This document formalises the compliance of the system and is the key item of the project file. Without this evidence, tradespeople who later work on the roof have no guarantee as to the load-bearing capacity of the attachment points and find themselves obliged to demand heavy perimeter protection installations.

  • Scaled roof plan identifying the precise position, numbering and type of each hook present on the slopes.
  • Record of the structural fixing characteristics: timber species, minimum cross-section of the load-bearing rafter, diameter and length of the lag screws or double-thread screws.
  • Manufacturers' data sheets certifying the conformity of the hooks to the required multidirectional loads.
  • Initial acceptance record signed by the qualified installer, certifying compliance with the tightening torques and the integrity of the underlay.
  • Blank register intended for recording the dates, signatures and observations of later periodic inspections.

The full inclusion of these documents in the project file guarantees an unbroken safety chain throughout the life cycle of the building. The inspection logbook becomes the roof's logbook: each person working on it records their findings, and the owner assumes the obligation to have annual reviews carried out by a qualified building envelope professional. In financial terms, preventive maintenance and periodic review of a network of hooks for a single-family house represent a modest budget, in the order of CHF 150 to 350 per visit, guaranteeing flawless protection for decades of service.

Handling non-conformities, taking out of service and repair of defective anchors

When a roof safety hook shows plastic deformation, mechanical play at the base or cracking of the load-bearing rafter, the ban on attaching to it must be immediate. Any device that has already arrested a dynamic fall must be condemned, because its mechanical absorption capacity is permanently altered. On the plumbing or roof-slope refurbishment construction site, the operator informs the foreman without delay, who marks the removal of the hook with an indelible tag or a physical seal, before recording the non-conformity in the site diary.

According to art. 82 LAA, the employer must take, to prevent occupational accidents and diseases, all measures that experience has shown to be necessary, that are feasible according to the state of the art and that are appropriate to the given conditions. Rehabilitating the anchor point requires methodically uncovering the area to inspect the roof structure beneath. If the rafter shows a split caused by drilling or superficial rot, the metal fitting must be moved to sound timber or reinforced by a structural sistering member of calculated dimensions.

  • Immediately prohibit the use of the defective device by all trades working on site.
  • Remove the damaged hook and its original fixing without reusing the damaged drill holes.
  • Rigorously restore the water- and wind-tightness of the underlay at the penetration.
  • Carry out a static axial pull test where the residual load-bearing capacity of the substrate raises uncertainty.
  • Record the repair, the inspection records and the data sheets in the project file.

Art. 229 CP provides that anyone who, in directing or carrying out a construction or demolition, intentionally breaches the recognised rules of the trade and knowingly endangers the life or physical integrity of persons is liable to a custodial sentence of up to five years or a monetary penalty. Where plumbers or chimney sweeps discover on an old roof hooks that are uncertified, corroded or without technical documentation, the client must be notified in writing so that the system can be fully requalified.

Frequently asked questions

What is the minimum frequency at which a roof hook must be inspected?

The visual and mechanical inspection is carried out at least once every twelve months, as well as before each use on the roof slope. This annual inspection checks for the absence of corrosion, the straightness of the shank, the tightness of the bolting and the integrity of the surrounding roof covering. Every examination results in a dated inspection report, signed by a competent technician and filed in the project file handed over to the building owner.

What should be done when a safety hook has arrested a worker's fall?

A hook that has been loaded in a dynamic fall must be taken out of service immediately. Even without visible deformation, the internal structure of the metal and the fixings in the rafter have undergone extreme stresses. The roofer removes the device, reports the incident to the safety officer and replaces the hook and the anchor lag screws. The load-bearing roof structure undergoes a thorough assessment before any new installation in this bay.

Which documents must the installer record in the project file?

The project file handed over at acceptance contains the dimensioned hook layout plan, the manufacturer's installation instructions and the approval sheets according to the applicable standards. It also includes the fixing record specifying the type of screws, the tightening torque and the minimum cross-section of the load-bearing rafters. These documents make up the mandatory maintenance register for authorising later access by roofers, chimney sweeps or solar installers.

Can a safety hook be fixed directly through the counter-battens without pre-drilling?

Pre-drilling the counter-batten and the rafter is essential to prevent the timber from splitting when the structural fixings are screwed in. Screwing without a pilot hole risks splitting the rafter's grain along the line of the pull-out force, drastically reducing the mechanical load-bearing capacity of the device. The diameter of the pre-drilled hole must correspond precisely to the core diameter of the screw according to the technical requirements of the anchor manufacturer.

Texts and standards cited

  • LAA art. 82general prevention rules: the employer must take, to prevent occupational accidents and diseases, all measures that experience has shown to be necessary, that are feasible according to the state of the art and that are appropriate to the given conditions; workers assist the employer (in particular by using personal protective equipment).
  • CP art. 229breach of the recognised rules of construction: anyone who, in directing or carrying out a construction or demolition, intentionally breaches the recognised rules of the trade and knowingly endangers the life or physical integrity of persons is liable to a custodial sentence of up to five years or a monetary penalty; through negligence, up to three years or a monetary penalty.

In the same section