Skip to content
Website
🧱 CFC 224Tinsmithing: shaping, junctions and thermal expansionChapter 7 of 10 in the section

Eaves drip strip and drip edge: protecting the wall plate and throwing water clear of the façade

This chapter details the design and installation of metal eaves drip strips suited to pitched roofs. You will learn how to size the drip edge overhang precisely to prevent water returning onto the wall plate purlin, how to connect the work to the hanging or recessed gutter, and how to preserve the low ventilation inlet while blocking rodents in accordance with good practice.

Key takeaways

  • A drip edge that is too short lets water rise by capillary action directly onto the wall plate timber.
  • The drip fold must clearly overhang the gutter to throw rainwater clear of the fascia.
  • The geometry of the eaves drip strip must include a continuous ventilation opening with no pinching whatsoever.
  • The watertight connection of the sarking to the flashing ensures that any infiltration under the roof covering is drained away.

Forming the drip edge and protecting the wall plate purlin against water return

On a pitched roof, the wall plate purlin and the rafter ends are the roof-frame members most exposed to insidious biological degradation. The main defect observed on construction sites comes from a poorly sized or too short drip edge. Under the combined effect of the surface tension of the water and upward wind pressure, raindrops do not fall vertically at the end of the sheet: they follow the contour of the metal by capillary action and travel along the underside of the eaves drip strip. Without a clean, projecting drip fold, this permanent moisture penetrates the eaves fascia and seeps into the wall plate joints, causing cubical rot in the timber with no visible sign from the roof covering.

Drip edge with drip fold
Lower end fold of a metal strip formed at an acute angle, intended to break the capillary adhesion of the water drop and force it to fall directly by gravity into the gutter or away from the façade.
Geometric sizing of the drip edge according to the drainage element
Type of eavesDrip edge overhangFold openingRisk of defect
Hanging half-round gutter30 to 40 mm into the profile45° downwardsDrops blown out of the bead by strong wind
Recessed gutter on cornice50 mm beyond the verge35° to 40° closedWater stagnating under the strip by capillary action
Open eaves with timber fascia25 mm in front of the timberFlattened edge at 30°Rot of the wall plate purlin through infiltration

The connection with the gutter requires careful geometry to absorb the heavy sheets of water from violent storms. The lower end of the flashing must extend at least 30 millimetres below the level of the rear lip of the gutter, without obstructing the useful hydraulic section. The minimum air gap of 15 to 20 millimetres between the drip edge fold and the gutter bottom prevents any suction effect when the water level rises suddenly. The wall plate purlin must be isolated from the metal by a breathable separation strip to prevent underside condensation forming directly in contact with the timber fibres.

Maintaining eaves ventilation and connecting the sarking

The installation of the eaves drip strip must in no case compromise the air inlet essential to the ventilation of the pitched roof. The space left between the continuous substrate and the roof covering serves to remove moisture transmitted through the thermal insulation and to limit summer overheating of the roof space. The metal flashing must therefore not block the foot of the counter-batten. Outside air must enter freely under the roof covering while preventing the intrusion of wasps, birds or dormice that could damage the flexible membranes and the roof timbers.

  1. Fixing the eaves batten and the metal flashingNail a bevelled eaves batten wedged to the height of the counter-battening. Fix the eaves drip strip with wide-head copper or stainless steel nails, using sliding nailing to allow free expansion.
  2. Watertight connection of the sarking sheetUnroll the sarking membrane so that it overlaps the metal flashing by at least 100 millimetres. Bond it continuously with a contact adhesive or an approved acrylic adhesive tape.
  3. Fitting the screened ventilation profileFix an eaves comb or a perforated lacquered aluminium sheet onto the drip edge to preserve the free ventilation opening while forming an impassable mechanical barrier against pests.
  4. Laying the roof covering and checking the overhangLay the first course of tiles or slates, checking that the nose of the covering elements projects 40 to 60 millimetres over the flashing so that water is thrown into the centre of the drip edge.

Work at the roof edge demands total rigour regarding the risk of falling. According to art. 41 OTConst, appropriate measures to prevent falls must be taken from a fall height of more than 2 m. Installing a façade scaffolding fitted with its guardrail or setting up a compliant roofer's catch platform makes it possible to form the folds and welds at the eaves with the required precision, without compromising workers' safety.

Capillary return under the eaves: diagnosing a deteriorated wall plate purlin

At the foot of the slope, the wall plate purlin and the eaves board form the structural seating receiving the rafter ends. This solid timber assembly is directly exposed to moisture-related defects when the eaves metalwork fails. The most insidious cause of damage does not come from a massive overflow, but from a surface tension phenomenon: when the hanging drop of the drip edge lacks projection or the flashing is too short, the run-off water does not detach from the sheet by gravity. It follows the lower edge of the metal fold, rises by capillary action on the inner face and continuously wets the timber eaves board and then the upper face of the wall plate purlin, which is protected from the sun but deprived of drying.

This wetting, hidden under the eaves drip strip, keeps the timbers at a permanent moisture level above the critical threshold for the development of wood-destroying fungi. The wall plate purlin thus rots from the outside towards the core without any defect being immediately visible from the ground outside. To prevent this upward return of water under the effect of wind or molecular adhesion, the roofing plumber must form a clean stop profile, either in the workshop or on the site folding machine. The tilt of the flashing must form a clear angle of between 40 and 45 degrees towards the void, completed at its end by a flattened fold or a closed hem turned outwards acting as a rigid mechanical drip.

Influence of the drip edge geometry on the preservation of the wall plate purlin
Fold configurationObserved hydraulic behaviourConsequence for the roof frameCompliant execution
Straight drip edge flush with the fascia faceWater clings to the metal and rises by capillary action against the bearing faceRot of the eaves board and deterioration of the wall plateProvide a minimum forward inclination of 40° with 20 mm clearance
Raw lower edge without closed hemMeniscus of stagnant water held along the sheared edge of the sheetUnderlying corrosion of the metal and slow wetting of the timberForm a bead or a flattened 10 mm fold creating a clean water shed
Sheet drop too short above the gutterSplashes thrown backwards by gusts of west windDiffuse infiltration behind the flashing towards the rafter headsExtend the drop by at least 30 mm inside the receiving profile
Stepped drip edge with angle break and hemClean detachment of the water drop thrown into direct free fallWall plate timber ventilated and kept permanently dryStrict compliance with the development in accordance with good practice for CFC 224

Gutter–eaves interface: maintaining the ventilation flow without a water bridge

The design of the connection between the eaves drip strip and the hanging or recessed gutter must meet two conflicting requirements: guiding all surface water towards the drainage while preserving the air passage section essential for the ventilation of the cold roof. A common error on pitched roofs is to extend the eaves drip strip until it is in direct contact with the bottom or bead of the gutter in order to hide the air gap. This tight fit blocks the intake of fresh air under the roof covering, which causes massive condensation under the tiles and traps snowmelt water, which then backs up directly against the wall plate.

To ensure the durability of the eaves overhang, the upper eaves drip strip, fixed on the tilting batten, must dip freely into the gutter to a depth of 25 to 30 mm without tight contact with the rear lip of the gutter. The free volume between the lower edge of the strip and the gutter bed keeps a continuous ventilation opening, closed off only by a perforated bird-proof grille or a metal eaves comb. The sheet is fixed to the boarding by copper or stainless steel nailing in the upper part, under the overlap of the roof covering elements, allowing sufficient longitudinal expansion clearance between the strips to avoid thermal buckling.

According to art. 365 CO, if the material supplied by the client or the ground designated by the client is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, the contractor must immediately inform the client. When the roofing plumber works on a roof frame whose wall plate purlin or eaves fascia is misaligned, set back insufficiently in relation to the gutter, or lacks an eaves board preventing the correct profiling of the drip edge, this finding requires an immediate written duty to notify so that the substrate is corrected before the sheets are finally installed.

Handling wall plate damage and reworking the eaves

The discovery of a wall plate purlin damaged by cubical rot under an eaves drip strip requires an immediate stop to roofing operations in order to assess the extent of the structural damage. When the drip edge has an insufficient eaves fold or is folded back against the timber, run-off water rises by capillary action and wets the top face permanently. According to CO, the client checks the condition of the work as soon as is practicable and notifies the contractor of any defects. The roofing plumber foreman draws up a joint inspection record with the carpenter to delimit responsibilities between the design of the substrate and the execution of the profile.

  • Checking the residual mechanical strength of the wall plate purlin by probing with an awl or a drill bit.
  • Checking the drip edge overhang in relation to the verge board or the timber fascia (minimum projection required to break the water drop).
  • Examining the connection with the gutter to confirm that there is no backflow or pinching of the sheet against the hem.
  • Confirming that the air inlet under the tiles is maintained to avoid any internal condensation under the sarking.

If the timber is spongy over more than a third of its cross-section, roof frame repair is required before any metal is refitted. The roofing plumber removes the first courses of tiles, cuts off the defective eaves drip strip and cleans the area. Art. 368 CO sets out the client's rights in the event of defects in the work, opening the way in particular to the remedying of elements that do not comply with good practice.

The new eaves flashing is formed in the workshop with a hem of at least 15 mm forming a clean drip edge, throwing the water more than 20 mm from the face of the wall plate. A perforated ventilation grille or a ventilated profile in copper or zinc guarantees upward air passage without letting pests in.

Frequently asked questions

What minimum projection should be provided for the drip edge overhang above the timber fascia?

The drip edge overhang must project at least 20 mm beyond the vertical plane of the timber fascia or the wall plate purlin. The drip fold, inclined at 45 degrees outwards, prevents surface tension from guiding the drops backwards. A smaller overhang inevitably brings rainwater back by capillary action against the edge of the top timber.

How can eaves ventilation be ensured without creating a path for backed-up water?

The metal eaves drip strip must sit above a comb or a perforated ventilated eaves profile, placed in line with the counter-battening. The air inlet of at least 200 cm² per linear metre is located above the water discharge line. The sarking flashing drains any condensation directly into the gutter, passing under this air flow channel, preventing any backflow towards the roof frame.

What shape should the connection between the eaves drip strip and the hanging gutter take?

The eaves drip strip dips into the gutter without being welded or mechanically fixed to it, in order to absorb thermal expansion movements. Its lower fold must extend at least 30 mm below the level of the rear hem of the trough, without touching the gutter bottom. This guarantees perfect guidance of rainwater without restricting the eaves air flow needed by the roof covering.

Why does the wall plate purlin rot even if the gutter never overflows?

This defect comes from a straight drip edge without a drip fold, or one that is too short. By capillary adhesion, snowmelt water or light rain goes around the metal edge and slides under the sheet. This repeated micro-run-off continuously wets the wall plate timber, which no longer has enough ventilation to dry, leading to fatal attack by wood-destroying fungi.

Texts and standards cited

  • COafter delivery, the client checks the condition of the work as soon as is practicable and notifies the contractor of any defects; for a building work, the client has 60 days to notify them and a shorter contractual period is void (para. 1bis, in force since 1 January 2026); each party may request an examination by experts (para. 2).
  • COclient's rights in the event of defects in the work: refusal, price reduction, rectification, damages; any clause agreed in advance that restricts or excludes the right to have defects remedied is void if the defect concerns a construction (para. 2bis, since 1 January 2026).

In the same section