Key takeaways
- SIA 232/1 sets the counter-batten heights and the minimum ventilation openings.
- The continuous air inlet at the eaves requires a perforated grille protecting the opening against rodents.
- The outlet at the ridge is made with a ventilated ridge closer or calibrated ventilation tiles, depending on the roof pitch.
- The expansion of fibrous insulation requires deeper counter-battens to maintain the required air gap.
Size the inlet areas at the eaves and the outlet areas at the ridge according to the technical rules
Ventilation beneath the tiles fulfils an essential thermal and mechanical function: removing residual water vapour from the living space, drying accidental infiltrations beneath the roof covering and dissipating the heat stored by summer solar radiation. If the air gap is undersized or interrupted, condensation water accumulates in contact with the counter-battens. Nail tips corrode, battens deteriorate through fungal attack and the underlay ends up rotting the roof structure with no visible sign from the outside.
The ventilation space beneath the roof covering must be sized continuously from the eaves to the ridge, taking into account the length of the roof slope and the roof pitch.
norme SIA 232/1
To ensure this continuous airflow, SIA 232/1 requires a minimum air inlet area at the eaves generally equal to two thousandths of the area of the roof slope served, with a minimum floor value of two hundred square centimetres per linear metre of lower edge. This air inlet is achieved by a continuous slot with a free thickness of at least twenty millimetres. This opening must be protected by a perforated ventilation grille or a bird comb made of sheet metal or plastic, calibrated to block insects and rodents without reducing the actual useful opening area.
| Position on the roof slope | Minimum air area required | Minimum air gap thickness | Installation detail |
|---|---|---|---|
| Eaves (low air inlet) | 200 cm² per linear metre | 20 mm clear beneath the first batten | Perforated strip or ventilation comb |
| Standard air gap (slope length < 10 m) | Continuous area over counter-battens | 45 to 50 mm (45x50 mm battens) | Counter-battens aligned on each rafter |
| Standard air gap (slope length ≥ 10 m) | Increased area according to SIA 232/1 | 60 mm minimum | Double battening or 60x60 mm battens |
| Ridge and hip (air outlet) | 100 cm² per linear metre of slope | 20 mm of two-sided outlet | Dry-fixed ventilated ridge closer or ventilation tiles |
At the ridge and on the hips, the hot, saturated air must be able to escape freely to the outside. The outlet area must represent at least half of the eaves inlet area, i.e. a minimum of one hundred square centimetres per linear metre for each connected slope. Ridges bedded in cement-lime mortar, which block the air completely, are prohibited in favour of dry-fixed ventilated ridges. A raised ridge batten fixed on metal brackets is used, on which rests a flexible ventilated ridge closer with pleated aluminium or zinc flashing, nailed beneath the ridge tiles.
Preventing insulation from rising and preserving the air gap dimensions
The most vulnerable point of the ventilation lies at the interface between the thermal insulation placed between the rafters and the underlay. When refurbishing attics or installing glass wool or wood wool insulation, the pressure exerted by the insulation batt often pushes the underlay sheet upwards. This localised compression closes the air gap against the battening and chokes the rising airflow. The roof structure and counter-battens then find themselves in a pocket of stagnant moisture favourable to the rapid development of dry rot and other wood-destroying fungi.
- Checking the available height on the raftersCheck that the nominal thickness of the insulation is at least forty millimetres less than the height of the rafter, or that the underlay rests on a continuous rigid support that prevents any upward deformation.
- Fitting counter-battens of suitable sectionNail or screw counter-battens at least forty-five millimetres thick along each rafter, over the underlay and the nail-sealing tapes.
- Stopping the insulation before the wall plateFix a bevelled stop board above the wall plate to guide the insulation downwards without allowing it to slip against the eaves grille.
- Checking the clearance at the ridgeStop the underlay sheets five centimetres below the ridge axis to allow the air gap to be connected, except in the case of a highly permeable underlay covered by a ventilated ridge cap.
On low-pitched roofs or where the slopes exceed ten metres of continuous length, the natural thermal draught by stack effect weakens noticeably. To compensate for these pressure losses, it becomes essential to increase the counter-batten thickness to sixty millimetres and to insert additional ventilation tiles in a staggered pattern on the upper third of the roof. These additional openings relieve the airflow before the ridge and prevent hot air overpressure beneath the ridge.
Continuity of airflow at penetrations, hips and valleys
The theoretical calculation of the inlet area at the eaves and the outlet area at the ridge loses its meaning as soon as a transverse obstacle interrupts the ventilation channel. On a continuous slope, the counter-battening provides a direct thermal column. As soon as a dormer, a chimney flue or a roof window intervenes, the rising airflow meets a sealed barrier. If no lateral diversion or air intake is provided, the space beneath the structure becomes a pocket of still air where moisture accumulates.
To get around isolated obstacles, the tradesperson must interrupt the counter-battens with sufficient spacing or provide crossed counter-battening that allows multidirectional circulation. Wide penetrations require autonomous ventilation of the box: the air trapped beneath the obstacle must be able to escape through a relief ventilation tile, while a new air inlet must feed the slope immediately upstream of the trimming. Without this precaution, the tiles laid above the trimming receive no airflow at all.
| Roof feature | Airflow obstacle created | Corrective measure required | SIA 232/1 requirement |
|---|---|---|---|
| Roof window or dormer | Complete interruption of the air gap over one or more rafter spacings. | Fitting a ventilation tile beneath the lower flashing and an air intake upstream of the trimming. | Maintaining a free area equivalent to all the interrupted rafters. |
| Flue or service duct | Local blockage creating a dead zone beneath the upstream drip. | Skew the adjacent counter-battens to create a diversion channel towards the neighbouring bays. | Minimum clear passage of 20 mm preserved around the metal trimming. |
| Ventilated hip line | Convergence of lateral airflows with no direct natural outlet at the ridge. | Installing a specific ventilated under-ridge with a perforated metal ridge closer. | Continuous air discharge along the hip line to the outside. |
| Recessed valley line | Narrowing of the air inlet at the bottom of the junction of the converging slopes. | Doubling of the valley boards and offsetting of the underlay to open a suction channel. | Free passage area not compressed by the fixings of the valley channel. |
On complex roofs with multiple hips and valleys, the basic rule is that each bay between counter-battens must have a direct outlet. If the hip is closed with mortar or a non-ventilated closer, the hot air remains trapped beneath the tops of the jack rafters, which accelerates premature ageing of the timber support.
Pathologies of air confinement and checks before roofing
When the thermal insulation is pushed too high or swells after installation, the ventilation gap is pinched against the battens. The consequences of this confinement are insidious because they are invisible from inside or outside the building. Air laden with water vapour that has passed through the walls migrates towards the cold. Without sufficient thermal draught between the eaves and the ridge, this moisture condenses beneath the tiles and on the upper face of the underlay. The spruce counter-battens are then constantly dampened, which triggers the proliferation of wood-destroying fungi.
The visual check of the ventilation area must be carried out before the tiles are nailed. The tradesperson uses a gauge rod corresponding to the required thickness of the counter-batten, generally 45 or 50 mm on long or low-pitched slopes, in order to verify that no high point of insulation reduces the minimum clearance of 20 mm prescribed by the rules of the trade. At the eaves, the protective grille against birds and rodents must have an effective perforated area compatible with the calculated inlet area: a badly folded flashing or a comb that is too tight often halves the actual opening area.
At the ridge, the outlet area must be clear of any residue of sawdust, offcuts of underlay or poorly positioned adhesive sealing tapes. Connecting the under-ridge pieces requires leaving a clear gap of at least 50 mm between the two underlay slopes, capped by an added ventilation flashing. If the roofer finds on the construction site that the roof structure or the insulation installed by another trade prevents the statutory airflow areas from being achieved, the Code of Obligations (CO) requires the client to be notified in order to clear the company of liability before the roof covering is laid.
Stop and resume procedure when ventilation is compromised
When the roofer finds on the roof that the thermal insulation bulges the underlay and closes the air gap, the battening must on no account continue. A choked air gap leads to rapid fungal degradation of the counter-battens and rafters under the effect of trapped moisture. Under art. 365 para. 3 CO, if a circumstance compromises the proper execution of the work, the contractor informs the client. The roofer-plumber records the anomaly in the site diary with supporting photographs and sends a written notice to the site management before any tiles are laid.
- Survey of residual air areasMeasure the actual gap between the upper face of the underlay and the underside of the batten. According to SIA 232/1, the inlet area at the eaves and the outlet area at the ridge must meet the minimum areas prescribed to ensure the thermal draught.
- Clearing the air gapRemove the disputed rows of battens. If the mineral wool has been forced in from the inside, require the installers to redo it or fix longitudinal wedging battens to push the insulation downwards without perforating the waterproofing sheet.
- Checking the ends and grillesCheck that the ventilated eaves battens or ventilation combs do not reduce the air passage beneath the tile. At the ridge, make sure that the ventilated under-ridge pieces or perforated metal ridge closers provide a free and continuous outlet area.
- Joint acceptance of the dimensionsArrange a joint inspection over the full length of the slopes before the roofing elements are pegged or screwed down. Record the restoration of the free area in a rectification report validated by the site management.
The durability of the roof structure depends directly on this uninterrupted rising airflow. A deformed underlay in direct contact with the underside of the tiles eliminates the removal of condensation beneath the roof covering. This confinement accelerates the development of destructive mould and the rotting of the structural timber.
Frequently asked questions
What air inlet area must be provided at the eaves beneath a tile roof covering?
According to SIA 232/1, the air inlet area at the eaves must correspond to at least two per thousand of the area of the corresponding roof slope, with a geometric threshold of two hundred square centimetres per linear metre. The tradesperson fits a perforated eaves batten or a bird-proof grille. This element protects the gap against rodents and insects while preserving the airflow required for ventilation beneath the roof covering.
How can insulation between rafters be prevented from bulging the underlay and blocking the air?
To prevent mineral wool or wood fibre from swelling upwards, require a batt with controlled oversize thickness or the fitting of transverse wedging battens beneath the rafter framing. If the insulation is blown-in or flexible, a rigid board or a semi-rigid support beneath the underlay guarantees the air space. The roofer checks the dimensions before battening; any direct contact between insulation and underlay chokes the thermal circulation.
What solution should be adopted at the ridge to ensure an effective air outlet?
The outlet at the ridge requires a minimum area equivalent to half that of the eaves, i.e. at least one hundred square centimetres per linear metre of ridge according to SIA 232/1. Ventilated metal ridge closers beneath the ridge tiles or clay under-ridge pieces designed for ventilation are installed. These pieces prevent the build-up of hot, humid air at the top of the roof space while preventing the ingress of powder snow during winter storms.
How should one react on the construction site if the ventilation area is blocked by defective battening?
If the counter-battens are thinner than required or if transverse battens interrupt the rising airflow, the roofer must stop laying the roof covering. They report the defect in writing to the site management and request replacement of the counter-battens to restore a gap of at least forty millimetres. Continuing work without correction makes the company liable for defective workmanship in the event of later moisture damage.
Texts and standards cited
- SIA 232/1Pitched roofs: rules for design, sizing of air gaps and execution of the roof covering
- CO art. 365Duty of the contractor to notify the client if a circumstance compromises the proper execution of the work (para. 3)