Key takeaways
- The mechanical anchorage is secured exclusively to the load-bearing rafters using suitable metal brackets.
- Uplift forces in high winds strictly prohibit any direct fixing to the battens alone.
- The roofing collar and the lead or zinc apron ensure that water is shed.
- The cable enters through a watertight mast head with a mandatory drip loop.
Transferring wind loads and anchoring directly to the load-bearing roof structure
Installing an aerial mast or a satellite dish on a pitched roof generates considerable mechanical stresses. The wind creates dynamic pressure on the receiving surface, which is converted into a high bending moment at the penetration point. All too often, masts are hastily fixed to two roof battens with ordinary wood screws. Under gusts, the battens split, the screws are pulled out by the leverage effect and the whole roof covering suffers major damage, causing immediate leaks and a direct danger of falling materials onto access routes.
The anchorage must be made exclusively on solid timber roof structure elements. The roofer-plumber uses an articulated through-mast support or a fixing bracket sandwiched on a rafter, or between two adjacent rafters by means of firmly bolted spacers. Galvanised steel threaded brackets or reinforced clamping straps are essential to lock the rotational and tilting degrees of freedom.
- Upper metal clamp screwed into the rafter with coach screws of at least 8 mm diameter with wide washers.
- Mast foot anchored to a metal base plate fixed to a load-bearing rafter or to a main purlin.
- Rafter support adjustable in width to suit the actual rafter spacing without notching the timber.
- Checking plumb with a spirit level before final tightening of the locking nuts.
To work on the roof slope in compliance with the rules, art. 41 OTConst requires appropriate measures to prevent falls from a fall height of more than 2 m. Installing the anchorage requires careful removal of the local tiles or slates in order to reach the decking or the structure directly without damaging neighbouring fixings.
Multi-layer watertightness of the penetration and safe cable routing
A mast penetration passes successively through the roof covering, the ventilation space, the sub-roof and the insulation build-up. Watertightness cannot depend on a simple bead of sealant applied around the tube. The first level of watertightness is on the sub-roof layer: a flexible EPDM sealing sleeve must be slipped over the mast and bonded to the sub-roof sheet using a system adhesive tape certified for outdoor use, observing the overlap in the direction of water flow.
- Fitting the sub-roof sleeveCut the sub-roof with a clean star-shaped incision, insert the preformed elastomer sleeve around the mast and roll down the adhesive flange onto the sheet, ensuring that any water ingress drains towards the eaves.
- Fitting the roof flashing collarFit a tile flashing in malleable lead, zinc or copper with a welded cone. Form the metal apron so that it follows perfectly the profile of the downslope and side tiles.
- Fitting the mast seal and compression ringCover the top of the cone with a UV-resistant rubber cap, tightened by a stainless steel screw clamp to prevent the entry of running water.
The aerial cable penetration is the most vulnerable point if it is not dealt with specifically. The cables must never run freely between two tiles, otherwise the roof covering will gape and the sheath will be sheared by the wind. Two professional methods are accepted: routing the cables directly inside the metal tube through a mast head fitted with a watertight cap with downward-facing cable glands, or passing through a dedicated pipe-penetration tile fitted with a pressure-relief vent.
Strict compliance with the rules of the trade by the roofer guarantees the durability of the work against the weather. In the event of deliberate failure to comply with these elementary technical principles causing serious bodily injury or material damage through falling elements, art. 229 CP penalises the breach of the recognised rules of construction. The finished work must preserve the integrity of the ventilation air gap beneath the roof covering while maintaining perfect thermal continuity where it passes through the insulated envelope.
Structural anchorage to load-bearing timber and resistance to overturning moments
Installing an aerial mast or a dish support on a pitched roof subjects the structure to considerable dynamic stresses. Under wind gusts, the catchment surface presented by the dish reflector or the aerial array acts like a sail. The horizontal load applied at the top of the mast generates, through the lever arm, a destructive bending moment at the base of the penetration. Screwing a plate directly to two roof battens or to the counter-battening is a gross error: the small cross-section of the battens and their nailed fixing to the rafter cannot resist pull-out. The battens split or lift under suction, dislodging the neighbouring rows of tiles and causing an immediate leak.
The forces must necessarily be transferred into the load-bearing structure of the roof space. Two anchorage methods in accordance with the rules of the trade apply depending on the configuration of the roof structure:
- The telescopic metal bracket under the ridge or between rafters: mechanically fixed between two adjacent rafters using coach screws or fully threaded wood screws of at least 8 mm diameter. This bracket takes up tilting forces without transmitting direct torsional stress to a single rafter.
- Direct clamping to a reinforced rafter or roof-space post: recommended when the mast passes through the cold roof space to be anchored to a purlin or a strut by means of at least two galvanised steel clamps spaced vertically at least 60 cm apart.
- The trimmer or solid timber reinforcement: insertion of nailed or screwed spacers between the rafters, cut from sections equivalent to the existing roof structure, in order to prevent rotation of the mast foot.
Making the flashing collar and the watertight cable penetration
Watertightness around the mast requires treatment at two levels: the sub-roof plane and the roof covering plane. At sub-roof level, the perforation of the breathable membrane must be compensated by a flexible EPDM or butyl sealing collar, bonded on top of the existing membrane and turned up by at least 100 mm along the metal tube. A sub-roof deflector placed upslope diverts any infiltration or condensation water running on the membrane towards the neighbouring bays.
At roof covering level, the flashing work consists of a metal apron (copper, zinc-titanium or pre-lacquered galvanised sheet) following the plane of the roofing material, to which a conical or cylindrical sleeve is welded. This metal sleeve rises at least 150 mm above the water-shedding plane of the tile. A deflector collar (or rain cap) is fixed to the mast by a mechanical clamp with a UV-resistant elastomer seal, covering the top of the sleeve without rigid contact with the roof covering in order to absorb micro-vibrations.
| Component | Material / Type | Connection technique | Critical check point |
|---|---|---|---|
| Roof apron | Pleated lead or zinc with lead strip | Chased in upslope under the tiles, side-clipped | Minimum overlap of 120 mm on the downslope tile roll |
| Mast sleeve | Welded zinc-titanium tube or EPDM cone | Tin-soldered to apron or vulcanised collar | Minimum upstand height of 150 mm above frost level |
| Cable routing | Copper gooseneck or routing inside the mast | Outlet facing downwards with drip loop | Routing under tiles without mechanical protection is prohibited |
| Sub-roof connection | Self-adhesive preformed sleeve | Rolled down onto sub-roof sheet with primer | Upslope deflector sloped towards the counter-battening |
The routing of coaxial cables is the second critical point of the work. Sliding a black cable directly between the interlocks of two tiles invariably leads to wear of the sheath through friction, blockage of the water run-off and ingress by wicking. Two routes are technically recognised: direct passage inside the mast shaft when it is fitted with a watertight plastic cap with downward-facing cable glands, or the installation of a modified ventilation tile or a dedicated plumber's gooseneck. Outside, each cable must absolutely form a drip loop located below the level of its entry point to prevent run-off from entering the sleeve.
Wind damage and water ingress: remedial procedure and bringing into compliance
An aerial mast hastily fixed to two roof battens is a serious defect at the first foehn or thunderstorm. Under the action of the lever arm, the overturning moment pulls out the batten nails, splits the counter-battens and dislodges the adjacent tiles or slates. Water ingress is immediate and runs directly into the thermal insulation beneath the perforated sub-roof sheet. If pull-out or loosening is found on a construction site, the roofer-plumber must intervene without delay to make the roof safe, record the condition of the supports and restore the watertightness system.
- Emergency removal and making the roof covering safeDismantle the aerial and its unstable mast to remove the wind load. Remove the broken or displaced tiles over a safety zone of at least one square metre around the point of impact. Lay a heavy tarpaulin secured by temporary counter-battening.
- Cutting out and rebuilding the sub-roof planeOpen up the roof covering locally to examine the load-bearing rafters. Replace damaged or split timbers. Cut out the torn sub-roof area and insert a new bonded patch with an upslope overlap of at least 150 mm towards the ridge.
- Through-fixed structural anchorageInstall a metal bracket or a solid timber trimmer fixed directly to the rafters or the purlin. Fix the mast base using through threaded rods or structural wood screws suited to dynamic loads.
- Refitting the flashing assembly and the watertight cable routingFit a sleeve with a lead or zinc collar adjusted to the roof slope, with the apron chased in under the ridge tile and dressed over the downslope course. Fit the mast cap, curved downwards, for the entry of the coaxial cables.
Contractually, if the aerial was installed by a third-party installer without coordination with the plumber, the duty to notify under CO applies in order to inform the client of the non-conformity of the work and the risk to the roof structure. Complete remediation requires removal of the damaged battens, installation of structural reinforcing pieces and full recourse to the client's rights provided for in CO in the event of earlier defective performance.
Frequently asked questions
How do you restore sub-roof watertightness around a penetrating mast?
A flexible elastomer sealing sleeve with an acrylic adhesive flange that is wind- and driving-rain-tight must be used. The sleeve is slipped over the mast before fixing, carefully rolled down onto the sub-roof sheet after prior degreasing, and then receives a deflector strip upslope to divert any infiltration water to the gutter without it pooling against the shaft.
Why is it prohibited to anchor a mast foot directly to the battens?
Battens of standard cross-section are sized only to carry the self-weight of the roof covering and the distributed snow load. The wind pressure on the aerial and its dish creates a very high tilting moment at the mast foot. This concentrated pull-out force instantly tears out the fixing nails and dislodges the rows of tiles.
Which flashing solution should be chosen to connect a mast on a clay tile roof?
The standard solution is to fit a specific clay pipe-penetration tile with an aerial sleeve, or a made-to-measure metal flashing. This comprises a pleated lead or zinc-titanium apron of at least 0.7 mm, formed to the profile of the downslope tile, extended by a watertight sleeve and capped with a neoprene clamping ring.
How do you bring coaxial cables in without creating a leak?
The cables must absolutely run inside the tubular shaft of the mast and exit beneath the roof covering, or enter through a gooseneck-curved bush facing downwards. Letting cables run down the outside of the mast without a drip loop leads run-off water directly into the penetration opening and saturates the mineral wool beneath.
Texts and standards cited
- COmaterials and ground: the contractor is responsible for the good quality of the materials he supplies; if the materials supplied by the client or the ground designated by him are found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).
- COclient's rights in the event of defects in the work: rejection, price reduction, rectification, damages; any clause agreed in advance that restricts or excludes the right to have defects remedied is void if the defect concerns a building (para. 2bis, since 1 January 2026).