Roofer safety, snow and roof maintenance: the execution reference

Safety on pitched roofs imposes strict requirements for fall protection and for preventing risks linked to weather or fragile materials. This section is aimed at team leaders, foremen and site managers, to organise the safety of personnel on pitched roof slopes and to deliver work that meets the requirements for subsequent maintenance. It details anchoring rules, personal protective equipment and the preparation of maintenance instructions.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 41 OTConst

2 m

Minimum fall height requiring protective measures at the roof edge

art. 41 OTConst

60°

Maximum roof pitch for working without an elevating work platform or scaffolding on the slope

art. 22 OTConst

100 cm

Minimum height of the top rail of a perimeter guardrail

art. 22 OTConst

15 cm

Minimum height of the toe board at the bottom of the guardrail

Scope and limits of this section

This section covers all the safety, handling and prevention rules that apply when working on pitched roofs. It deals with slope-specific restraint systems, protection of third parties at the foot of the building and anticipation of the future maintenance of the roof covering. The specific issues linked to pitch, fragile sheets, adverse weather conditions and the risk of asbestos are addressed directly to construction site supervisory teams.

To respect the boundaries of the trade (CFC 224), perimeter collective protection equipment fixed to the roof structure or to the ground remains assigned to the respective trades concerned. Thus, the erection of façade scaffolding and sheet-metal worker's catch scaffolds falls under CFC 212. Likewise, waterproofing work on flat roofs or terraces remains exclusively assigned to CFC 226, and load-bearing timber structural elements to CFC 214.

Organisation of the chapters and reading method

The progression through the ten chapters follows the chronological and operational course of a pitched roof construction site, from the assessment of access to the handover of the work to the client.

  • Assessment of the slope and anchorages: Determination of restraint systems suited to the pitch, sizing of lifelines, calculation of the clearance distance and checking of safety hooks.
  • Management of fragile and hazardous materials: Safe movement near fibre-cement or synthetic sheets and detection of the presence of asbestos on older structures.
  • Handling and protection of the public highway: Distribution of loads on the battens, use of material hoists and marking out of the ground-level zone to protect third parties.
  • Bad weather and stopping work: Operational criteria for withdrawal in the face of wind, rain and frost, and emergency procedures for sheeting over after a storm.
  • Maintenance instructions and handover of the work: Drafting of safety instructions and inspection frequencies for the owner, for subsequent interventions.
Summary of safety rules according to roof slope pitch
Slope pitchProtective equipment requiredOperational constraints
Up to 60°Sheet-metal worker's catch scaffold, perimeter guardrail or PPE against fallsInstallation of certified anchorages and checking of the clearance distance
Above 60°Scaffolding or mobile elevating work platformRope work on the slope prohibited without a dedicated platform

📘 Chapters in this section 10

Roofer safety, snow and roof maintenance

Working on the roof slope: how pitch changes the protection required

Select the fall arrest system suited to the exact pitch of the roof structure.

Roofer safety, snow and roof maintenance

Roof lifeline: sized anchorages, fall clearance and pendulum effect

Calculate the clearance distance and avoid the pendulum effect for safe roof anchoring.

Roofer safety, snow and roof maintenance

Fragile materials on roofs: translucent sheets, fibre-cement and falls through the roof

Prevent the risk of falling through translucent sheets and weakened fibre-cement.

Roofer safety, snow and roof maintenance

Safety hooks: positioning, anchoring and periodic inspection

Install and periodically check safety hooks to ensure the restraint of workers.

Roofer safety, snow and roof maintenance

Wind, frost and wet roofs: the conditions in which we come down

Set weather thresholds for deciding to interrupt work and clear the roof.

Roofer safety, snow and roof maintenance

Hoisting materials onto the roof: tile hoists, pallets and load distribution

Distribute bundles of tiles on the battening and secure the material hoist on the slope.

Roofer safety, snow and roof maintenance

Protecting the street below the construction site: canopy, cordoning and working hours

Set up ground-level marking and canopies to protect pedestrians.

Roofer safety, snow and roof maintenance

Old fibre-cement sheets: suspected asbestos and immediate stop of work

Identify suspect old fibre-cement sheets and apply the immediate stop procedure.

Roofer safety, snow and roof maintenance

Roof maintenance manual: what is inspected, how often, and who may go up

Draft clear maintenance instructions setting the frequency of inspections and authorised access.

Roofer safety, snow and roof maintenance

After the storm: emergency tarping, securing the site and recording the damage for the insurer

Organise emergency securing and sheeting over after a storm safely.