Skip to content
Website
🧱 CFC 224Rainwater drainage: gutters and downpipesChapter 1 of 10 in the section

Sizing a gutter: collected area, rainfall intensity and effective cross-section

This chapter gives you the practical method for sizing gutters fitted to pitched roofs. You will be able to calculate the collected roof area in horizontal projection, choose the design rainfall intensity according to the SN EN 12056 standard, determine the effective cross-section of the gutter taking its slope into account, and apply the increases that are essential for structures built at altitude.

Key takeaways

  • The collected roof area is always measured in horizontal projection, without any increase for the roof pitch.
  • The design rainfall intensity derives from the SN EN 12056 standard and from local peak rainfall.
  • A minimum slope of five millimetres per metre ensures proper flow without sediment build-up.
  • In the mountains, ice accumulation and summer thunderstorms require a safety margin of twenty per cent.

Calculating the storm flow: plan area and rainfall intensity

The hydraulic sizing of a box gutter or a half-round gutter starts with a rigorous assessment of the critical storm flow Q, expressed in litres per second. The calculation method applied by Swiss roofing plumbers is based on the SN EN 12056 standard. The most common mistake on construction sites is to select a standard sheet-metal girth out of visual habit, without checking that it is hydraulically adequate for the roof slope. An undersized gutter inevitably ends up overflowing several times a year during heavy summer storms, damaging cornice fascias, façades and roof overhangs.

Collected roof area
Ground footprint of the roof slope measured horizontally overall, disregarding the pitch, increased by a fraction of the adjacent vertical walls exposed to wind-driven rain.

To carry out the calculation using the basic formula, the collected roof area is measured strictly in horizontal projection, in square metres. The inclination of the rafters does not change the volume of water captured: a steep roof space at 50 degrees receives exactly the same mass of vertical rain as a low-pitch roof at 20 degrees occupying the same ground footprint. The runoff coefficient is 1.0 for watertight coverings of tiles, slates or metal sheets. If a vertical masonry façade or a gable wall overlooks the gutter, 50 % of its projected area is added.

On the Swiss Plateau, this design intensity corresponds to an input of 300 litres per second per hectare for a ten-year design storm. For a roof of 160 square metres projected on the ground, the instantaneous runoff flow to be discharged towards the gutter outlet therefore reaches 4.8 litres per second.

When the plans require a box gutter that is too narrow to ensure this drainage, the contractor must be vigilant. Art. 365 CO para. 3 provides that if another circumstance jeopardises the proper or timely execution of the work, the contractor must immediately inform the client. Installing an undersized gutter without warning engages the company's contractual liability in the event of roof flooding.

Determining the effective cross-section of the gutter according to slope and water freeboard

Effective cross-section of a gutter
Cross-section available for the passage of water, between the low point of the gutter and the maximum permissible level of the design water line, measured below the safety freeboard.

Once the storm flow is known, the metal profile must be sized according to its actual effective cross-section. This effective cross-section is not the same as the total geometric cross-section of the formed sheet-metal piece. The design water level must stop below the edge of the outer hem, leaving a minimum water freeboard of 20 to 30 millimetres. This air margin absorbs the turbulence, backflow waves and bubbling generated by the rapid inflow of water running down the eaves tiles.

The shape of the profile profoundly affects the flow velocity. The half-round gutter offers the best hydraulic efficiency: the absence of straight edges prevents silt deposits and limits parasitic friction. For an equivalent cross-section, a rectangular box gutter drains water more slowly, as the corners of the bottom create vortices that slow the liquid. For a box gutter, the bottom must be at least 120 millimetres wide to properly accommodate the expansion slide fixings and to connect conical outlets without constriction.

Indicative sizing chart for a half-round gutter with a slope of 5 mm/m
Maximum collected area (m²)Sheet-metal girth (mm)Internal diameter (mm)Permissible flow (l/s)
Up to 652501051,9
65 to 1302801273,8
130 to 2203331536,6
220 to 38040019211,8

The longitudinal slope, set by the precise alignment of the brackets, directly determines the permissible flow. The SN EN 12056 standard and the trade's professional rules recommend a minimum slope of 5 millimetres per metre (0.5 %), the optimum slope being 10 millimetres per metre (1.0 %). A gutter installed strictly level suffers a loss of drainage capacity of about 40 % compared with a sloping profile, which causes permanent standing water and accelerates the corrosion of the soldered joints.

Determining the rainwater flow and sizing the cross-section according to SN EN 12056

The hydraulic sizing of a roof-plumbing gutter tolerates no empirical approximation. An under-sized gutter becomes saturated at the first summer storm and inevitably overflows under the double-layer flashing or against the cornice fascia. The SN EN 12056 standard governs the gravity drainage calculation for roofs by setting a rigorous relationship between the collected roof area, the design rainfall intensity and the effective cross-section of the metal profile.

To determine the design flow Q in litres per second (l/s), the roofing plumber first calculates the receiving area projected on the ground. On a pitched roof, the geometric area of the slope is not the design value: what counts is the horizontal projection of the slope, to which is added the influence of adjoining vertical walls or gable walls that drive water towards the gutter under the effect of wind. The standard flow formula is: Q = A × r × C, where A is the plan area in square metres, r the design rainfall intensity (generally 300 l/(s·ha), i.e. 0.03 l/(s·m²) in lowland areas) and C the runoff coefficient, conventionally taken as 1.0 for watertight metal, tile or fibre-cement coverings.

Indicative correspondence between the collected plan area and the minimum effective cross-section for a half-round gutter installed with a slope of 5 mm/m.
Collected plan area (m²)Design flow Q (l/s)Minimum effective cross-section (cm²)Usual profile girth (mm)Associated downpipe diameter (mm)
Up to 401.204520060
41 to 802.408025075
81 to 1504.50140330100
151 to 2507.50230400120
251 to 40012.00370500150

The effective cross-section is the transverse flow area measured below the overflow level of the front edge (the outer drip edge or bead). In the case of square or rectangular profiles, often formed on a workshop folding machine in copper, titanium-zinc or powder-coated aluminium sheet, the width of the gutter bottom must remain greater than or equal to the maximum permissible water depth to avoid the formation of eddies that slow the flow towards the outlets.

Increase at altitude, effect of the slope and safety overflows

Siting a building at altitude drastically changes the rainfall regime. Above 800 metres in French-speaking Switzerland — whether in the Fribourg or Vaud pre-Alps or the Jura massif —, summer storms are more violent, with concentrations of hail capable of instantly blocking the downpipe outlets. Moreover, in spring, the rapid melting of the snow cover under foehn conditions generates a continuous runoff that the roofing plumber must absorb without risk of internal overflow.

The longitudinal slope of the gutter determines the velocity of the water stream and therefore the drainage capacity of the effective cross-section. A profile laid flat or with an accidental counter-slope has its drainage capacity reduced by nearly half compared with a run having a minimum gradient of 5 mm/m (0.5 %). When the slope reaches 10 mm/m (1 %), the increased velocity allows a greater volume of water to be discharged for the same cross-section, while ensuring effective self-cleaning of roof dust and plant debris.

  1. Checking the hydraulic freeboard levelMaintain a minimum free freeboard of 20 mm between the maximum calculated water depth and the outer edge of the gutter. The rear edge located under the eaves must exceed the outer bead by at least 20 mm to 30 mm to force any accidental overflow towards the open air outside.
  2. Positioning of outlets and flared connectionsProvide conical outlets or tapered stubs rather than straight cylindrical stubs. The gradual funnelling reduces the contraction of the liquid stream and increases the intake flow of the downpipe by 25 % without changing the pipe diameter.
  3. Forming the overflow weirsOn box gutters or gutters located between two roof slopes, incorporate a warning overflow at the end of the run or in the end cheek. This emergency drip, sized to discharge at least 50 % of the peak flow, must discharge the water visibly onto the façade without touching the thermal envelope.

The contractor ensures that the materials used meet the requirements for mechanical strength and corrosion resistance. If the architectural layout requires a narrow cross-section or a restricted depth that contradicts the requirements of SN EN 12056, the contractor informs the client, in accordance with the duty to notify provided for in art. 365 CO if a circumstance jeopardises the proper execution of the work, so that the installation of additional overflows or the multiplication of drop points can be validated.

Overflow incidents: remediation protocol and duty to notify

A gutter that overflows during heavy summer storms or rapid snowmelt almost always reveals a shortfall in effective cross-section or a bottleneck at the outlet. When the problem occurs twice a year, the roofing plumber's liability is immediately called into question by the site management. The first reflex is to redo the joint measurement of the collected roof area. It frequently happens that dormers, upper slopes or sheet-metal upstands have been added during the works without recalculating the actual input to the metal profile.

  1. On-site hydraulic checkMeasure the remaining effective cross-section under the double-layer drip edge and check the diameter of each outlet. Record the actual slope with a spirit level: a flat-bottomed profile without a minimum slope retains silt and reduces the effective capacity.
  2. Recalculation according to SN EN 12056Apply the revised local design rainfall intensity, with the safety margin required above 800 metres altitude to absorb hailstones and masses of melting snow.
  3. Immediate remedial measuresIf the box gutter cannot be widened without altering the roof structure, cut notches to insert safety overflows in the façade or double the number of downpipes.

Contractually, if the architect's plans impose a recess that is too narrow and rules out the cross-section required by SN EN 12056, the roofing plumber must react formally. According to art. 365 CO, if a circumstance jeopardises the proper or timely execution of the work, the contractor must immediately inform the client. This written notification relieves the tradesperson of liability before rainwater damages the eaves or the thermal insulation.

Frequently asked questions

How should the effective cross-section of a gutter be adapted at altitude?

From 800 metres altitude, apply a systematic increase of 20 to 30 % to the minimum effective cross-section obtained according to SN EN 12056. This buffer volume compensates for the presence of residual snow, sleet and ice in the bottom of the profile, which greatly reduce the flow velocity of liquid water during a sudden thaw accompanied by sustained showers.

What minimum slope should be given to the gutter to prevent overflow?

The rule of good practice in roof plumbing requires a continuous minimum slope of 5 millimetres per metre, ideally 10 millimetres per metre. A perfectly horizontal profile works hydraulically by surcharge, but promotes standing water, the accumulation of abrasive dust and overflow through backflow as soon as the design rainfall intensity exceeds the usual ten-year averages.

Should the actual area of the slope or its horizontal projection be measured?

The sizing of rainwater drainage is based on the collected roof area projected onto the horizontal plane, expressed in square metres, in accordance with the SN EN 12056 methods. However, on a steep slope of more than 45 degrees exposed to prevailing winds, include a share of the exposed façade likely to drive rainwater towards the gutter.

Can a gutter that is too narrow be compensated for by larger downpipes?

No. If the profile has an insufficient effective cross-section, rainwater overflows over the front bead before even reaching the outlets, whatever the capacity of the vertical downpipes. To correct an undersized gutter without changing its width, the technical solution is to add extra outlets along its length in order to divide the flow lengths.

Texts and standards cited

  • SN EN 12056Gravity drainage systems inside buildings - General requirements, calculations and rainwater drainage
  • CO art. 365Materials and ground: the contractor is responsible for the good quality of the materials he supplies; if the materials supplied by the client or the ground designated by him are found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must immediately inform the client, failing which he bears the consequences (para. 3).

In the same section