Key takeaways
- The loss of residual thickness definitively rules out any attempt at soft soldering with tin.
- Underside corrosion destroys the sheet without leaving any visible sign from the outside.
- A patch applied to deadened metal is only a temporary rescue that guarantees nothing.
- The written warning protects the company against claims following a foreseeable water re-infiltration.
Diagnosing thickness loss and underside corrosion
On an old pitched roof, the roof plumbing works are subject to continuous mechanical and chemical attack. Recessed gutters, valley channels and chimney flashings in rolled zinc or copper eventually show isolated perforations. The reflex of applying a self-adhesive bituminous strip or a polyurethane sealant masks a far more serious phenomenon. The metal never perforates by accident in the middle of a sound surface: this is the visible manifestation of a generalised loss of thickness caused by the slow washing away of the protective patina by rainwater.
- Underside corrosion
- Severe chemical degradation of the metal sheet caused by the lack of ventilation under the roof boarding. Recurrent interstitial condensation turns zinc into friable white hydroxide, eating away the material from the inside outwards.
The technical examination requires checking the remaining thickness with a thickness micrometer or by targeted pressure with the peen of the plumber's hammer. A zinc sheet originally calibrated at 0.70 mm or 0.80 mm that falls below the critical threshold of 0.40 mm loses all structural rigidity. Moreover, underside corrosion attacks the areas in direct contact with unventilated raw timber. The trapped moisture forms a powdery white paste that delaminates the alloy without the exposed face showing any prior alteration, apart from tiny dark craters.
| Visual and mechanical findings | Actual condition of the metal | Required workshop decision |
|---|---|---|
| Clean crack on expansion fold, constant thickness | Sound metal, localised fatigue | Solder a piece with a clip |
| Multiple perforations, white deposit on underside | Underlying through-corrosion | Complete replacement of the section |
| Sheet buckles under finger pressure, strong roughness | Thickness loss above 50% | Work condemned, renewal required |
Contractually framing the temporary repair and formalising the duty to notify
When a leak occurs in mid-winter or before a scheduled complete renewal of the roof slope, immediately replacing a recessed gutter often proves impracticable without stripping a large area of roof covering. In this emergency situation, fitting a reinforced elastomer patch or an aluminium-butyl adhesive flashing is an acceptable stopgap measure, provided that the client understands that this is in no way a durable piece of roof plumbing work. This patch suffers freeze cycles, thermal shrinkage and ultraviolet rays that detach it within a few months.
- Cleaning and degreasing the substrateBrush off the friable patina without piercing the gutter bottom, remove vegetal sludge and dry with a heat gun on a gentle flame.
- Fitting the stopgap waterproofing membraneApply a self-adhesive strip with firm rolling to expel the air, overlapping ten centimetres beyond the porous area.
- Drawing up the joint inspection recordTake a clear photograph of the treated area and have a work order signed stating that the process is strictly temporary.
The building professional must secure their contractual position. Under art. 365 CO, if another circumstance jeopardises the proper or timely execution of the work, the contractor must immediately inform the client, failing which they bear the consequences (para. 3). In this context, invoicing a superficial emergency fix without notifying the overall failure of the substrate engages the company's liability from the first spring leak. The written information on the expected lifespan of the patch — set at one winter at most — must appear on the daily time-and-materials report as well as on the overall renewal offer submitted in parallel.
Mechanical behaviour and rapid failure of makeshift bridging repairs
Applying a polymer sealant, a butyl adhesive strip or bituminous felt to a perforated roof plumbing sheet is a common response to a sudden leak. However, this sealing does nothing to change the metallurgical condition of the substrate. When zinc-titanium or copper shows a clear perforation resulting from generalised corrosion, the immediately surrounding zone systematically suffers from a critical loss of thickness. The residual sheet, often reduced to a thickness of a few tenths of a millimetre, no longer has the mechanical rigidity required to withstand the shrinkage and thermal expansion movements of the gutter or valley connection.
Roof metals undergo large daily and seasonal temperature swings in the Swiss climate. The coefficient of linear expansion of zinc produces continuous dimensional variations that sealants cannot absorb durably when bonded to an oxidised, chalky or friable surface. In winter, frost stiffens the sealing pastes while the contraction of the metal pulls the joint lips apart. Mechanical shear causes the patch to detach at the first thaw, letting meltwater seep under the makeshift bridging.
Beyond the mechanical stresses, applying a sealing product to an attacked surface traps residual moisture. This confinement dramatically accentuates the underside corrosion phenomenon. The absence of air circulation under the sealant prevents the zinc from forming its protective patina of basic zinc carbonate. The powdery zinc hydroxide continues to eat away at the metal from underneath, turning a simple micro-hole into a completely disintegrated zone within a single cold season.
| Makeshift technique | Average observed durability | Predominant failure mechanism | Consequence for the substrate |
|---|---|---|---|
| Polyurethane or MS polymer sealant | 3 to 6 months | Detachment through winter thermal shear | Accelerated oxidation under the bead |
| Cold self-adhesive bituminous strip | 6 to 12 months | Loss of adhesion in frost, creep under summer UV | Trapped standing water and rotting of the roof boarding |
| Patch soldered onto stripped metal | Immediate failure or 1 to 2 months | Thermal burn-through by the soldering iron during fitting | Definitive destruction of the residual section by overheating |
Discharge protocol and wording of the formal notice to the client
When a roof plumber works on a recessed gutter, a valley or a dormer apron flashing that has reached its terminal phase, invoicing a repair without spelling out its technical limits directly engages their liability as a tradesman. The operator must not let the customer imagine that a one-off intervention guarantees the durable renewal of the work. In accordance with the duty of care arising from the contract for work and services, the tradesman must report by clear written notice any defect in the substrate that jeopardises the work.
Art. 365 CO requires the contractor, if a circumstance jeopardises the proper execution of the work, to inform the client immediately, failing which they bear the consequences. In addition, art. 369 CO excludes the client's rights in respect of defects where the defective execution is personally attributable to them because of instructions given contrary to the contractor's formal warnings. The intervention report or the emergency repair quote must therefore stipulate that fitting a patch is an emergency safeguarding measure, with no guarantee of watertightness beyond a set period.
The correct commercial and technical approach is to split the intervention into two clearly traced stages. The first covers the temporary repair undertaken to get through the winter or to stop immediate interior damage, invoiced on a time-and-materials basis with an express no-guarantee statement. The second stage immediately provides a complete estimate for the like-for-like replacement of the metal work in accordance with the rules of the trade, including the removal of the necessary courses of tiles or slates, replacement of the rotten timber substrate and supply of new roof plumbing sized with its regulation expansion joints.
- Macro photograph of the perforation and measurement of the residual thickness of the adjacent metal.
- Written notification stating that the metal has reached its structural wear limit through generalised corrosion.
- Formal indication that the proposed sealing is a stopgap dressing limited to a few months.
- Joint submission of the full replacement offer so that the permanent works can be planned as soon as favourable conditions return.
Handling disputes and re-infiltrations after emergency sealing
When a makeshift repair on fatigued rolled zinc fails at the first thaw, water infiltration into the roof space abruptly revives the tension between the owner and the roof plumber. Without anticipatory documentation, the client treats the emergency invoice as an implicit guarantee of lasting results and blames the company for the failure of the patch. This recurring conflict situation requires rigorous team conduct from the moment the damage is reported, in order to defuse the technical and legal dispute.
- Joint inspection record and thickness measurementInspect the damaged area in the presence of the client. Photograph the tear in the sealant bridging, record the metal's thickness loss with a micrometer and document the craters from underside corrosion that pierce the gutter bottom.
- Notification of the initial intervention reportProduce the signed time-and-materials order or emergency repair protocol. This document attests that it was a temporary repair accepted as such, with no ten-year or two-year guarantee, carried out to deal with the most urgent matter on the client's formal instructions.
- Issuing the quote for complete replacementDraw up a quote for the full replacement of the part in accordance with the rules of the profession (SIA 118 standard). Offer to credit part of the initial emergency repair costs against the permanent work if the order is confirmed without delay.
Legally, art. 369 CO provides for the exclusion of the client's rights in respect of defects in the work where the defective execution is personally attributable to them, in particular because of instructions given contrary to the contractor's formal warnings. As soon as the roof plumber has delivered written information on the expected lifespan and had the obsolescence waiver signed, the customer bears the risk of the later perforation. If the client persists in refusing to pay for the emergency repair or demands compensation for wet ceilings, involve the company's civil liability insurance with the complete file, while remaining firm in refusing any further palliative patch.
Frequently asked questions
Why is tin soldering impossible on an old perforated gutter?
To solder with tin, the zinc must be stripped back to bright metal to regain its metallic shine. On end-of-life metal, the loss of thickness reduces the sheet to a few tenths of a millimetre. Under the action of a soldering iron heated to over two hundred degrees, the oxidised, crystallised zinc melts instantly, creating a larger perforation instead of taking the solder. The repair is technically impossible.
How do you diagnose underside corrosion with certainty on a ventilated roof?
Underside corrosion is not always visible from the roof surface. It shows up as a fine white dust of zinc carbonate under the roof boarding, visible when accessing the roof space. By gently tapping the metal with a mallet or feeling the sheet, the roof plumber detects a crumbly, soft texture. The presence of rough through-asperities indicates that the metal is being attacked from the reverse side.
What is the real life expectancy of a self-adhesive bituminous strip on a gutter?
In the Swiss climate, a bituminous or polymer strip fitted as an emergency measure generally lasts only a single freeze-thaw cycle, i.e. three to six months. The high expansion coefficient of zinc generates permanent thermal movements that the adhesive system cannot absorb. In winter, the bitumen hardens, loses its elasticity and detaches under the pressure of ice, turning the work into an insidious infiltration trap.
What exact wording should be entered on the time-and-materials order to release the company from liability?
Enter precisely: "Temporary emergency sealing with sealant on end-of-life roof plumbing with critical thickness loss. Work beyond service life, not guaranteed against later infiltration. Complete replacement mandatory in the short term." This statement, signed by the customer before the intervention, constitutes the irrefutable proof required by Swiss law to establish that the temporary repair order was given with full knowledge of the facts.
Texts and standards cited
- CO art. 369exclusion of the client's rights in respect of defects in the work where the defective execution is personally attributable to them (instructions given contrary to the contractor's formal warnings or any other cause)
- SIA 118General conditions for the execution of construction works
