🧱 CFC 224Rainwater drainage: gutters and downpipesChapter 9 of 10 in the section

Rainwater harvesting: filter, overflow and separation from the drinking-water network

Connecting the downpipes of a pitched roof to a rainwater storage tank demands absolute rigour. You will learn how to position an accessible, self-cleaning upstream filter, size an overflow free of any risk of blockage and guarantee the total absence of any physical link with the building's drinking-water network.

Key takeaways

  • The upstream mechanical filter prevents organic fouling of the tank and remains easily accessible for regular maintenance.
  • The overflow must have a diameter at least equal to that of the rainwater inlet to prevent any dangerous backflow.
  • Physical separation by total overflow (air gap) prevents any accidental return of rainwater into the drinking-water network.
  • Installing a tank requires a declaration to the municipal services and is subject to a compliance inspection.

Upstream filtration and overflow: protecting the storage tank against sludge and backflow

The roofer makes the direct connection between the downpipes of the pitched roof and the storage structure. Water coming from a roof covering of tiles, slates or profiled sheet metal systematically carries floating matter: plant debris, moss, conifer needles or mineral dust. The installation of a mechanical filtration device immediately upstream of the tank is therefore the first technical safeguard against rapid sedimentation and anaerobic conditions in the reserve.

Upstream basket or vortex filter
Mechanical device fitted between the rainwater downpipe and the tank inlet, designed to retain solid particles larger than 0.35 or 0.55 mm and to be inspected and cleaned regularly from the surface.

The accessibility of this filter basket or cartridge determines the overall effectiveness of the system. Any settling chamber or filter pot buried too deep, without a telescopic extension or a manoeuvrable watertight cover, ends up being neglected. Once the basket is clogged, the nominal roof flow no longer enters the tank or overflows around the foundations. The roofer installs the unit at a height and on an axis that allow direct visual inspection without heavy dismantling.

  • Overflow design with a rodent-proof trap and a fine stainless-steel grille.
  • Fitting a submerged elbow inside the tank to draw off the surface film of hydrocarbons and dust.
  • Connecting the overflow to a compliant outlet: infiltration on the plot depending on the capacity of the ground, or the municipal separate sewer system.
  • Mechanical non-return valve if the overflow level is below the hydraulic grade line of the public drainage network.

As regards the craftsman's duties, under art. 365 CO the contractor is responsible for the good quality of the material he supplies and promptly informs the client if a circumstance jeopardises the proper or timely execution of the work. Reporting an inconsistency between the area collected from the roof slopes and the discharge capacity of the overflow is an integral part of this professional obligation.

Strict separation from the drinking-water network, administrative procedures and acceptance inspections

The major health hazard of rainwater harvesting lies in the unlawful interconnection between the raw-water storage and the drinking-water distribution. A pressure drop in the public distribution network combined with the thrust of a submersible pump can siphon roof water contaminated by bird droppings into the building's sanitary water circuit. Such an incident directly engages the civil and criminal liability of those involved.

  1. Installing the top-up filling pipeThe end of the drinking-water pipe must be positioned above the maximum flood level of the tank or buffer tank by a distance of at least twice the nominal diameter, with no possible mechanical contact.
  2. Permanent marking of the rainwater pipeworkRaw-water pipes are identified by a green warning band and the text Non-drinking water, preventing any later tapping attempt by the finishing-work trades.
  3. Securing the service fittingsExternal draw-off points connected to rainwater must have a removable operating handle or a locked shut-off key to prevent human consumption.

Connecting a rainwater tank cannot be improvised from a legal standpoint. Under art. 22 LAT, no building or installation may be erected or altered without authorisation from the competent authority. Depending on the French-speaking cantons, installing a buried or external tank is subject to a building permit or a prior notification procedure with the municipal technical department or the building control authority.

Critical points checked during the acceptance inspection of a rainwater installation
Component inspectedTechnical requirementConsequence of non-compliance
Downpipe filterMesh between 0.35 and 0.55 mm, removable by handClogged pipes and rotting of the stored water
Safety overflowMinimum gradient 1.5%, cross-section equal to the inletDownpipe under pressure and backflow at the foundations
Drinking-water disconnectionFree air gap with no physical contactBacteriological contamination of the public drinking-water network
Network signagePermanent marking and blanked-off tapsAccidental poisoning through ingestion of roof water

Before commissioning, the project manager or the local water supplier appoints a sworn sanitary inspector. The report certifies the presence of the physical disconnection, the correct setting of the non-return valve on the overflow and the watertightness of the penetrations through slabs or external walls. This procedure formally releases the roofing company from liability for the upstream part of the network.

Installing the accessible upstream filter and connecting the downpipe

Connecting a pitched roof slope to a storage tank requires rigorous mechanical filtration before the water enters the tank. Without this upstream device, plant debris, quartz sand loosened from the tiles and bird droppings accumulate at the bottom of the tank, causing rapid anaerobic fermentation and premature clogging of the pump units. The roofer installs the filtration unit at the foot of the downpipe or on the buried pipe that is immediately accessible, at a height that allows visual inspection and regular cleaning without lifting equipment.

The filtering downpipe collector is fitted directly onto the downpipe in copper, titanium-zinc or powder-coated steel sheet by means of watertight sliding sleeves. Vortex-type models divert the purified water to the tank supply pipe by capillarity and centrifugal force, while driving coarse particles directly into the drainage network through the centre of the downpipe. The diameter of the branch pipe must be proportioned to the roof plan area collected, avoiding abrupt reductions that cause turbulence.

Selection criteria for upstream filtration systems on pitched roofs
Filter technologyRecommended locationHydraulic efficiencyMaintenance required
Surface-mounted grille collectorOn the external downpipe (1 m to 1.5 m above ground)85 to 90% of the rainfall volumeManual cleaning of the screen with a hose twice a year
Vortex downpipe centrifugal filterSurface-mounted outdoors or in a technical room90 to 95% of the water volumeRinsing of the filter cartridge in spring and autumn
Buried filter chamber with basketIn an inspection chamber before the tank95 to 98% of the collected volumeRemoval of the basket with a telescopic handle every quarter
Cascade self-cleaning filterDirectly upstream of the tank overflow80 to 85% in heavy rainAnnual visual check, automatic ejection of residues

The pipe connecting the upstream filter to the inside of the tank must dip down to the tank floor by means of a dip pipe ending in a calming inlet. This part, made of cast iron or polyethylene, directs the flow upwards, avoiding resuspension of the bed of very fine sediments deposited at the bottom. The supply line maintains a continuous gradient of 1 to 1.5% towards the tank to prevent stagnation of residual water that is sensitive to winter frost.

Hydraulic overflow, safety disconnection and inspections

A harvesting tank is useless and dangerous without a carefully sized overflow. When the reserve reaches its maximum level during thirty-year-intensity storms, the excess flow must be discharged by gravity without any pressurisation of the structure. If the overflow diameter is smaller than the sum of the rainwater inlet pipes, the tank goes under pressure, causing water to rise by backflow in the roofing downpipes or flooding through the inspection chamber.

  1. Sizing the overflow trapFit a submerged overflow elbow with a skimming bevel at the surface to draw off floating dust and pollen. Install a mechanical non-return valve at the trap outlet to prevent rodent intrusion and sewer gas backflow.
  2. Compliant gravity dischargeConnect the overflow outlet to the municipal rainwater sewer or to an open-air infiltration basin, in accordance with the municipal water drainage regulations (PGEP). No backflow must be able to reach the building envelope.
  3. Implementing the air gapTop up the tank with drinking water exclusively through a total atmospheric break (type AA or AB air gap in accordance with the sanitary technical standards). The clean-water outlet must be above the maximum water level of the tank by at least 20 mm or twice the diameter of the supply pipe.
  4. Marking the pipes and notificationTape each rainwater pipe with a permanent “Non-drinking water” marking and a pictogram prohibiting consumption at the draw-off points. File the installation notification with the local water supplier before commissioning.

Authorisation to operate a roof-water harvesting installation is subject to the guidelines of the cantonal environment department and to inspection by the municipal water supplier. The latter carries out an adversarial inspection of the disconnection before the trenches are fully backfilled. The acceptance report validates the watertightness of wall penetrations, the absence of any sanitary interconnection and the unobstructed discharge of the sized overflow.

Handling incidents, non-conformities and contractual remedies

On a roofing construction site, backflow from the tank into the downpipe collector or a fault in the hydraulic disconnector directly engages the liability of the contractor. When the water level rises abnormally in the rainwater downpipe or sediment clogs the filter basket, the cause is almost always an error in the levelling of the overflow or an insufficient size compared with peak rainfall. As soon as a blockage or poor discharge to the municipal outlet is found, the roofer must check the line of gradient and the mechanical condition of the non-return valve.

If a drinking-water network is found to be physically connected by a conventional valve without a break by total overflow, the situation requires immediate interruption of the connection. Under art. 365 CO, the contractor immediately informs the client when a circumstance jeopardises the proper or timely execution of the work. The presence of a non-compliant interconnection exposes the public network to contamination by backflow of rainwater.

  • Draw up a technical stop report with a level survey of the inverts and photographs of the inlet collector.
  • Notify in writing the refusal to connect a drinking-water top-up that lacks disconnection by overflow in accordance with SSIGE guideline W3.
  • Require the earthworker or drainlayer to bring the overflow connection into compliance before the final installation of the filter basket.
  • Record the formal notice in the site minutes to guard against the application of the rules on defects under CO.

The local water supplier or the cantonal water department regularly carries out a compliance inspection before commissioning installations receiving mixed water. If technical acceptance is refused, the corrective work remains at the expense of the party who omitted the atmospheric break. For pricing the replacement of a component or a modification to a downpipe, see /soumissions/.

Frequently asked questions

What should be done if the overflow pipe is narrower than the downpipe?

It is essential to stop the connection work and notify the defect to the site management. Under roofing and drainage rules, the overflow diameter must be at least equal to that of the rainwater inlet. A narrowing puts the tank under hydraulic pressure, then causes backflow towards the upstream filter, damaging the foot of the downpipe and the adjacent masonry.

How should the strict separation from the drinking-water network be implemented on the construction site?

The regulations prohibit any direct connection, even one fitted with an ordinary non-return valve. Separation is achieved exclusively by a break tank with total overflow of class AA or AB, guaranteeing a physical air break between the mains water supply and the rainwater circuit. This device prevents any suction or back-pressure of contaminated water towards the public distribution network.

Where should the upstream filter be positioned to avoid maintenance disputes with the client?

The basket or vortex filter is installed at the foot of the roof downpipe, at head height, or in an inspection chamber accessible from ground level. The roofer must avoid filters built into downpipes more than two metres above natural ground. Access without complex dismantling of metal components ensures regular cleaning of the stainless-steel mesh without specific tools.

Which official inspections validate the filling of a rainwater harvesting tank?

The municipal drinking-water supply and the water department require a prior installation notification. The inspector checks the actual presence of the standardised air break, the clear identification of the secondary non-drinking pipes by specific banding, and the compliance of the overflow discharge to the clean-water drainage network or the infiltration basin in accordance with the building permit issued.

Texts and standards cited

  • CO art. 365material and ground: the contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must immediately inform the client, failing which he bears the consequences (para. 3).
  • COclient's rights in case of defects in the work: refusal, price reduction, rectification, damages; any clause agreed in advance that restricts or excludes the right to have defects remedied is void if the defect concerns a building (para. 2bis, since 1 January 2026).