Penetrations, dormers and special details: the execution reference
This section covers the waterproofing, connection and execution of special details on pitched roofs. It is intended for team leaders, foremen and site managers who must execute or check watertight and airtight connections around every element passing through the roof covering: roof windows, dormers, chimneys, vents and solar installations, in strict compliance with SIA 232/1.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
150 mm
Minimum height of the waterproofing upstand above the roof covering plane
100 mm
Minimum turn-up of the underlay sheet against penetrations
2 m
Fall height from which a guardrail or roof plumber's platform is required
50 cm
Minimum height of the chimney outlet above the ridge in the case of a flue
Technical scope and limits of services
The success of a pitched roof depends on the flawless treatment of its penetrations. Every gap between a penetrating element and the roof covering is a critical zone for watertightness, airtightness and thermal insulation. The work of the roof plumber and roofer consists in ensuring the continuity of the water-shedding plane, the vapour barrier and the underlay at these geometric interruptions.
In the event of a defect in the substrate supplied by the carpenter (trimmer frame out of square, insufficient opening), the roof plumber-roofer is bound by the duty to notify and must report the non-conformity in writing before the connections are installed on the construction site.
Order of execution and method for installing special details
Penetrations are executed in an ascending sequence with a rigorous layering of the courses to ensure gravity drainage without infiltration:
- Preparing the underlayConnect the underlay sheet to the upstand of the penetrating element with a minimum turn-up of 100 mm. Form the deflector flashing upslope of the penetration to divert infiltrating water.
- Head and base flashingsInstall the front apron flashing or the lower gutter in formed sheet metal (zinc, copper or powder-coated aluminium), observing the overlap onto the downslope covering.
- Treating the cheeks and rear sectionsFix the side flashings, the rear chimney gutters or the valley channels. Carry out the soldering or seaming required to ensure the mechanical joint.
- Fitting the covering and ventilationCut the tiles or slates around the connection, leaving the required ventilation gap, and install the eaves/ridge fillers or vent tiles needed for air flow under the roof.
📘 Chapters in this section 10
Roof window: installation height, weatherproofing connection and underlay connection
Master the openings, the integration of the frame and the watertight connection to the underlay sheet.
Penetrations, dormers and special detailsVentilation outlets: position on the roof slope, height and flashing
Determine the appropriate outlet heights and install watertight sleeves without risk of condensation.
Penetrations, dormers and special detailsHip: cuts, ventilated closure strip and connection to the ridge
Carry out the tile cuts and the installation of ventilated fillers along the hip lines.
Penetrations, dormers and special detailsDormer window: cheek flashings, front apron flashing and side valleys
Form the cheek channels, the pleated flashings and the rear water-collecting tray.
Penetrations, dormers and special detailsSolar panels on pitched roofs: hooks, watertightness and added loads
Ensure the rigid fixing of the surface-mounted brackets without compromising the waterproofing beneath.
Penetrations, dormers and special detailsChimney outlet: height above the ridge and distance to combustible materials
Observe the fire safeguards and apply the regulatory chimney stack heights at the ridge.
Penetrations, dormers and special detailsVentilation tiles: how many, where, and why they do not replace a ventilated ridge
Calculate the effective ventilation cross-sections to remove moisture below the air gap of the battening.
Penetrations, dormers and special detailsRoof against a party wall: upstand, wall coping and access for maintenance
Manage the expansion of the edge strip and install the wall coping to protect the masonry.
Penetrations, dormers and special detailsAerials and miscellaneous supports: watertight fixing and resistance to wind loads
Anchor the masts to the roof structure and seal the penetration against overturning forces.
Penetrations, dormers and special detailsDrilling through a finished roof: the procedure that preserves the warranty
Apply the protocol for interventions from below without voiding the waterproofing warranty of the structure.