Anchors and plugs in concrete: the execution reference
This section is intended for team leaders, foremen and fitters of the CFC 274 trade who have to fix light metalwork elements to mineral substrates. It details the selection and installation of mechanical or chemical anchors whose mechanical performance can be demonstrated, particularly in cracked-concrete zones, in order to ensure that a guardrail or metalwork structure complies with the recognised rules of technology.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
100 cm
Minimum height of the top rail of an unprotected construction site guardrail
Option 1
Minimum European technical approval for an anchor in cracked concrete
2 m
Fall height requiring perimeter protection to be installed
4 x
Minimum cleaning cycle for a chemical anchor hole (blowing, brushing, blowing)
Scope and limits of the metalworker's responsibility
The installation of anchors by the building metalworker (CFC 274) is subject to strict physical and legal constraints. On the Swiss construction site, the craftsman fixes light, non-load-bearing building elements: guardrails, handrails, secondary metal staircases, ventilation grilles or gates. The design of the anchors for the main load-bearing structure, heavy steel frameworks or glazed facades falls exclusively to the steel construction specialist (CFC 215) and the civil engineer (CFC 211.1). The metalworker never intervenes to modify the reinforced concrete structure without formal approval.
The fitter's criminal liability is directly engaged at every anchor point. In the event of a serious breach of the manufacturer's instructions or of the recognised rules of technology, CP punishes the violation of the rules of construction practice. Fixing an unsuitable anchor, omitting to clean the drilled hole of dust or exceeding the tightening torque constitutes clear negligence in the event of an accident on a balustrade.
| Element to be fixed | Responsible trade | Regulations and design |
|---|---|---|
| Balcony guardrail, staircase railing | Building metalworker (CFC 274) | SIA 358 standard, ETA approval for cracked concrete |
| Load-bearing steel beams, main columns | Steel construction specialist (CFC 215) | Civil engineer (CFC 211.1), structural verification documents |
| Mixed glass-metal curtain-wall facades | Facade builder (CFC 215) | Facade structural calculation notes |
| External windows, facade doors | External joiner (CFC 221) | Waterproofing and frame fixing requirements |
Where the designated substrate shows visible defects, crumbly concrete, gravel pockets or unforeseen exposed reinforcing bars, the craftsman must act immediately. The law governing contracts for work requires the client or the site management to be notified without delay if the material supplied or the ground jeopardises the proper execution of the work. The metalworker then suspends installation in the disputed area and records his reservations in writing.
Installation method and execution sequence
To guarantee the durability and demonstrable strength of an anchor in the structural work, the metalworker follows a methodical working order. Each chapter of this section addresses a critical point of the installation chain, from the diagnosis of the concrete to the archiving of the as-built file.
- Selecting the anchoring principle (Q3-01 and Q3-06)Choose the anchoring system according to the mineral substrate: cracked concrete under mechanical tensile load, solid slab, or hollow masonry requiring chemical bonding with an injection sleeve.
- Preparation and geometry of the drilled hole (Q3-02, Q3-03 and Q3-04)Locate the reinforcement to avoid cutting through the load-bearing steel. Check the minimum edge distances and spacings prescribed. Drill the hole, then clean the cavity according to the official procedure.
- Mechanical installation and tightening check (Q3-05 and Q3-07)Ensure galvanic compatibility between the steel base plate and the fixing. Always use a torque wrench to apply the exact torque prescribed by the technical approval.
- Special cases and acceptance (Q3-08, Q3-09 and Q3-10)Handle penetrations through external thermal insulation without creating a thermal bridge. Where necessary, carry out pull-out tests on site and compile the self-inspection file for acceptance of the work.
The cost of a verification or core-drilling campaign after a failure far exceeds the initial equipment outlay. Proper tooling comprises a hammer drill with integrated dust extraction or a manual blow-out pump combined with a wire brush, a magnetic or radar rebar detector, and a set of calibrated torque wrenches. Rigorous traceability is the only evidence that can be relied on in a dispute.
📘 Chapters in this section 10
Cracked concrete: the approved anchor for this case, and why concrete is always cracked
Justify the strength of a guardrail in a tension zone without risking rejection during the technical inspection.
Anchors and fixings in concreteThe hole: drilling, blowing out, brushing, and holding capacity cut to a third without cleaning
Guarantee the nominal bond strength of the resin by removing drilling dust in accordance with the rules of the trade.
Anchors and fixings in concreteDistances: at the edge, between anchors, and the reduced load when too close
Prevent concrete spalling at the slab edge by strictly observing the prescribed spacings and edge distances.
Anchors and fixings in concreteDrilling without cutting the reinforcement: detection, repositioning and reporting
Protect the load-bearing reinforcing bars during drilling while repositioning the base plate properly in accordance with the rules.
Anchors and fixings in concreteTightening to torque: prescribed value, torque wrench and over-tightened anchor
Lock the fixing with a torque wrench without risking pull-out through over-tightening or damaging play.
Anchors and fixings in concreteHollow substrates: brick, block, chemical sleeve and very low load
Achieve a solid anchor in hollow masonry using the appropriate sleeve without bursting the cells.
Anchors and fixings in concreteOutdoors: stainless steel grade, galvanic couple with the part and indoor swimming pools
Prevent bimetallic corrosion and choose the right alloy for weathering or aggressive chlorinated vapours.
Anchors and fixings in concreteChecking anchors: pull-out test, sample and proof load
Validate the load-bearing capacity of doubtful fixings through a documented and incontestable pull-out test protocol.
Anchors and fixings in concretePassing through the insulation: thermal-break bracket, thermal bridge and sealing of the penetration
Fix through the external insulation without creating a thermal bridge or perforating the water-tightness.
Anchors and fixings in concreteProving anchorages: anchor reference, batch, photos and record sheet per structure
Gather the data sheets, applied torques and test reports in order to formally discharge one's responsibility.
