Key takeaways
- Pure rotary drilling avoids the systematic bursting of the internal webs of hollow brick.
- The European Technical Assessment (ETA) guarantees the actual resistances of chemical anchoring with a suitable injection sleeve.
- The permissible tensile load rarely exceeds a minimal fraction of that obtained in concrete.
- The metalworker must formally refuse the direct anchoring of a guardrail on unreinforced cellular masonry.
Cellular brick and the chemical sleeve: controlled injection and actual permissible load
The hollow substrates common in French-speaking Switzerland, whether modular clay bricks, aerated concrete blocks or perforated calcium silicate bricks, have outer walls and internal webs of great fragility. The use of a mechanical expansion metal anchor is strictly prohibited: the radial thrust would shatter the cells as soon as the tightening torque is applied. The only recognised method of point anchoring for light metalwork is chemical anchoring by injection combined with a perforated sleeve or bush, which creates a keyed (form-fit) hold inside the cavities.
- Pure rotary drillingThe hammer or percussion mechanism of the drill must be switched off. The carbide bit must machine the clay by simple abrasion so as not to destroy the dividing webs between the cells.
- Controlled dust removalBlow out the hole with a hand pump fitted with a long nozzle, then pass a suitable brush without rubbing roughly, to remove drilling dust without fracturing the brick.
- Sizing the sleeveInsert a plastic or metal sleeve whose diameter and length correspond strictly to the European Technical Assessment (ETA) of the anchoring mortar manufacturer.
- Gradual injectionInject the two-component resin from the bottom of the sleeve. The resin must flow back through the mesh to form solid bulges that grip behind the clay walls.
- Setting the rodPush in the threaded rod with a slight rotating movement before gelling begins, then strictly observe the curing time before any mechanical load is applied.
| Fixing substrate | Anchoring method | Indicative permissible tension | Indicative permissible shear |
|---|---|---|---|
| Uncracked reinforced concrete C25/30 | Chemical without sleeve | 12.0 to 18.0 kN | 10.0 to 15.0 kN |
| Perforated modular clay brick | Chemical with 16x85 mm sleeve | 0.8 to 1.5 kN | 1.2 to 2.0 kN |
| Hollow aggregate concrete block | Chemical with 16x130 mm sleeve | 1.0 to 2.2 kN | 1.5 to 2.5 kN |
| Hollow calcium silicate brick | Chemical with suitable sleeve | 1.2 to 2.5 kN | 1.8 to 3.0 kN |
Technical data sheets based on an ETA approval for masonry state characteristic loads combined with very high overall safety factors, often greater than 4 or 5. This margin results from the scatter in the strength of the brick itself, the condition of the bedding mortar joints and the risk of the anchor being positioned directly over a complete void. In pure axial tension, a fixing in cellular brick offers a derisory residual capacity compared with concrete. Multiplying closely spaced fixing points on a plate solves nothing: if the pull-out cone encompasses the whole brick, the entire block comes away from the masonry.
Overturning moment of the guardrail: setting the limit and formalising the reasoned refusal
A floor or flat-roof guardrail does not work in shear alone. In accordance with the requirements of standard SIA 261 and the guidelines of the Swiss Council for Accident Prevention (BPA), a handrail must resist a horizontal linear service load. Applied at a minimum height prescribed by standard SIA 358, this force creates a considerable lever arm. At the level of the wall fixing plate or at the foot of the post, the overturning moment generates an axial tension of several kilonewtons on the upper anchors, which immediately exceeds the pull-out capacity of a sleeve fixing in a hollow wall.
As soon as the basic structural calculation shows a tension greater than the resistance approved in the technical assessment of the sleeve, the metalworker has a formal duty to interrupt the installation process. Under the usual rules of the contract for work defined by the Code of Obligations (CO) and confirmed by standard SIA 118, the tradesperson must warn the site management by a written notice of defect reporting the physical incompatibility of the substrate with the planned guardrails or metal structures. Installing a guardrail on an unreinforced hollow substrate would engage the civil and criminal liability of the company in the event of mechanical failure.
- Complete passage through the wall with through-going threaded rods, with steel distribution back plates at least 8 mm thick on the opposite inner face.
- Transfer of the mechanical fixings down to the underlying reinforced concrete slab or perimeter tie beam, outside the zone of hollow bricks.
- Creation of point bearing beams cast in solid concrete at the posts by the masonry company.
- Installation of a rail or an intermediate free-standing post fixed only to the floor on a load-bearing reinforced concrete slab.
The reasoned refusal must be drafted unambiguously, annexing the ETA sheet of the anchor manufacturer which attests to the pull-out limits of the system on hollow substrates. The metalwork remains suspended until the project management or the civil engineer has approved one of the structural reinforcement options. This approach protects the user against the risk of falls and shields the metalworker against disputes over defective workmanship.
ETA requirements and mastery of sleeve anchoring
In finishing work for metalwork, the installation of metal items such as wall handrails, ventilation grilles, light brackets or guide rails regularly confronts the fitter with hollow masonry. Cellular clay bricks and hollow concrete blocks have no solid mass capable of absorbing the mechanical expansion of a stud or a traditional metal anchor. For any safety anchoring, the metalworker must refer to the European Technical Assessment (ETA) of the chosen chemical system. This official document is the only technical basis certifying the compatibility between the reactive resin, the geometry of the sleeve and the nature of the brick. The European Technical Assessment specifies the use category of the masonry, the minimum anchorage depth passing through several webs, the critical spacings and the distances to free edges necessary to prevent failure of the outer walls.
The physical principle of the sleeve rests on creating a keyed (form-fit) lock at the heart of the cells. Whereas in reinforced concrete bond develops along a continuous cylinder, the hollow substrate requires a perforated plastic bush or a metal mesh sleeve. Drilling must be carried out in simple rotation only, using a perfectly sharp carbide bit, never engaging the hammer or percussion that would destroy the internal webs of six to twelve millimetres. After moderate blowing with a hand pump, the sleeve is inserted flush with the face. The resin mortar is injected from the bottom of the bush using an extension nozzle, until the resin flows slightly back through the mesh. Inserting the threaded rod with a steady rotating movement forces the paste through the sleeve, forming rigid collars that wedge behind the ceramic webs after full curing.
| Type of hollow substrate | Required drilling method | Retention system | Load transfer mechanism |
|---|---|---|---|
| Cellular clay brick | Simple rotation without percussion | Fine-mesh plastic sleeve | Form-fit lock by hardened bulges |
| Hollow aggregate concrete block | Simple rotation or light core drilling | Perforated plastic sleeve | Mechanical grip in the cell walls |
| Hollow calcium silicate brick | Simple rotation with carbide bit | Plastic or metal sleeve | Form-fit lock combined with local bond |
Reduced permissible loads and reasoned refusal protocol
The service limit values published in the European Technical Assessments call for great caution on the construction site. Where an anchor stud in a concrete slab easily takes more than ten kilonewtons of tension, a chemical anchor with sleeve in cellular brick offers a permissible resistance of only between zero point five and zero point eight kilonewtons. This extremely low load-bearing capacity results from the thinness of the internal walls of the ceramic block. As soon as the axial load increases or an oblique shear acts on the rod, failure occurs suddenly by localised conical pull-out of the clay shard, without any prior plastic deformation. Trying to compensate for this weakness by increasing the rod diameter is pointless if the mechanical strength of the substrate remains poor.
From the preparatory phase or when taking measurements on the construction site, if the metalworker finds that the intended substrate consists of hollow bricks with no reinforced concrete load-bearing element, they must immediately record a reasoned refusal in writing addressed to the site management and the civil engineer. This technical duty to notify requires stating the impossibility of ensuring the safety of the fixings in accordance with the rules of the art and requesting a structural reinforcement solution. The recognised options include the prior casting of a tie beam or bearing beam in reinforced concrete by the masonry company, the offset fixing on the edge or soffit of the reinforced concrete slab, or the installation of through-going threaded rods over the full thickness of the wall fitted with steel distribution back plates on the rear face.
Handling the unexpected on hollow substrates: anchor failure and request for reinforcement
On the construction site, the discovery of unforeseen hollow brick masonry beneath a render or the bursting of a cell during drilling stops the metalwork installation. A hole made with percussion instead of pure rotation destroys the internal walls of the clay brick, preventing the mechanical anchoring of the injection sleeve and ruining the hold of the chemical anchoring. When the resin escapes into the voids without forming a bonding bulb or the rod moves after polymerisation, the fixing of a guardrail or handrail is technically compromised. The values of a European Technical Assessment (ETA) for perforated substrate apply only to an intact substrate and a hole cleaned with a hand blower and brush.
- Finding and stopping the installationStop the installation as soon as a pull-out, a collapsed cell or a lack of setting is observed. No forced re-tightening or fast-setting mortar wedging is permitted on a fixing subject to an overturning moment.
- Written notification to the site managementDraft, on the same day, a formal notice of non-conforming substrate in accordance with standard SIA 118. Describe the nature of the masonry, the mismatch with the permissible load assumptions and the risk of failure under horizontal service load.
- Prescribing a reinforcement solutionPropose to the civil engineer a suitable technical option: complete passage through the wall with a threaded rod and a steel back plate on the rear of the wall, or creation of a metal shoe connected to an adjacent concrete slab.
Work resumes after written approval by the site management of the chosen reinforcement solution. The metalworker records the change in the site diary, specifying the size of back plate installed, the steel grade and the tightening torques applied. In the absence of technical agreement or if the client refuses to reinforce a clay wall that is too thin, the reasoned refusal releases the tradesperson from any responsibility for the safety of users.
Frequently asked questions
Why is it forbidden to use percussion mode to drill hollow brick?
The hammering of a rotary hammer breaks the thin clay webs of the cells outright instead of cleanly cutting the material. The hole becomes oblong, flared and oversized, which prevents the injection sleeve from sitting on axis. Without intact internal walls, the chemical anchoring cannot form the bonding bulbs needed to take any permissible tensile load.
Can a guardrail post be fixed directly into a clay brick wall?
No, a hollow brick does not have the mechanical strength required to absorb the overturning moment of a guardrail post. The values certified by a European Technical Assessment (ETA) for hollow masonry indicate minimal permissible capacities, totally insufficient for this safety use. Under the horizontal service thrust at the top of the barrier, the clay walls burst. A fixing to a concrete slab or a through-going back plate is always required.
What should be done if the threaded rod of a chemical anchor spins freely after curing?
When the rod turns in the hole, the anchor has failed completely. The entire assembly must be extracted and the cavity probed. This defect comes from poor resin mixing, an expired cartridge, missing dust removal or a burst cell. Re-injecting product at the same spot without remediation is out of the question: move the position of the plate or make a through fixing with a metal back plate.
How should the refusal to install a guardrail on masonry that is too fragile be formalised?
The metalworker sends a written notice of defective substrate to the site management, relying on standard SIA 118. The document details the incompatibility between the strength of the hollow brick and the required pull-out loads, supported by the ETA sheets of the chemical anchoring. The company suspends installation on this substrate until an approved technical modification, such as a through-going back plate, is ordered by the engineer.
Texts and standards cited
- SIA 118General conditions for the execution of construction work, duties to notify and handling of defective substrates.