Gates, grilles and motorised closures: the execution reference
This section is intended for team leaders and installer metalworkers dealing with the installation of external closures and motorised grilles. It details mechanical guidance, the kinematic safety of leaves, compliance with protective clearances and the qualification of stopping on obstacle contact. You will find the method for adjusting a reliable motorised assembly, securing pedestrian or vehicle access and recording the test evidence required at acceptance.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 5
400 N
Maximum permissible peak dynamic force at the point of impact according to SN EN standards
150 N
Maximum tolerated residual static force after damping of the obstacle
110 mm
Maximum clear gap between vertical elements up to 75 cm in height
100 cm
Minimum height of guardrail or bars where there is a risk of falling
0.75 s
Maximum time allowed for the force to fall below the residual limit during an impact
Scope of the metalworker for motorised closures and grilles
The building metalworker works on plot and garage accesses strictly within the framework of finishing work. Our scope covers the fabrication and on-site assembly of swing or sliding gates, integrated wicket gates, burglar-resistant protective grilles, dividing fences and single or collective garage doors. As soon as a leaf is fitted with an automatic opening system, the whole becomes a moving mechanical assembly governed by the Machinery Safety Ordinance and the SN EN standards applicable to industrial, commercial and garage closures.
Our technical responsibility covers the fixing of posts, the guidance geometry, the low-voltage connection of protective devices and the calibration of kinematic forces. By contrast, the metalworker stops at structural work items: the sizing of concrete ground beams is the bricklayer's responsibility, while the electrical power supply from the main distribution board belongs to the electrician-installer. Likewise, fire-compartmented emergency exit doors fall within the scope of interior joinery or heavy timber construction, as do industrial fire-resistant closures.
| Work item concerned | Metalwork package CFC 274 | Excluded package or interface |
|---|---|---|
| Motorised sliding gate | Frame, rollers, track, guide posts, motor, sensing edges | Concrete ground beam (CFC 211), 230 V line in conduit (CFC 232) |
| Swing gate on pillars | Leaves, hinges, floor stops, drive arms | Reinforced masonry pillars (CFC 211), upstream intercom (CFC 232) |
| Collective sectional door | Door panel, guide rails, springs, safety brakes, photocells | Dedicated three-phase supply, fire-resistant partitions (CFC 273) |
| Security grille | Steel or aluminium frame, bars, mechanical anchors | Window frame (CFC 221), facade insulation reinstatement |
Deployment method and logic for consulting the sheets
To install a durable closure without risking sagging of the door panel or rejection at commissioning, the installation team must approach the work through a rigorous sequence. The reading of the ten chapters follows the physical cycle of the construction site, from setting out the track or hinges to the final handover record to the operator. A closure is not just its leaf: it lives under the effect of wind, thermal expansion and repeated pedestrian passage.
- Phase 1: Mechanical setting-out and static stabilityFirst deal with the ground geometry and the anchoring of the posts. Chapters Q5-01, Q5-03 and Q5-05 set the levelling tolerances of the track, the sizing of the hinges against the overturning moment caused by wind and the regulatory clearances at the property boundary.
- Phase 2: Intrinsic safety and passageNext examine the interaction of the closure with people. Chapters Q5-02, Q5-04 and Q5-09 detail the limitation of contact forces, the spacing of bars according to standard SIA 358 to prevent children from passing through, and the non-obstruction of escape routes by fixed grilles.
- Phase 3: Control equipment and balancingConnect the automatic systems and secure wear parts under heavy load. Chapters Q5-06 and Q5-07 cover low-voltage control wiring, the handling of dry contacts and the strict rules for tensioning garage door springs.
- Phase 4: Validation, maintenance and handoverClose the construction site with documentary proof. Chapters Q5-08 and Q5-10 structure the periodic maintenance logbook, the instrumented measurement of impact curves and the demonstration of manual release to users.
📘 Chapters in this section 10
Sliding gate: track, wheels, ground slope and gravel in the track
Control the levelling of the track and the removal of gravel to prevent any derailment of the sliding gate.
Gates, grilles and motorised closuresThe gate must stop: obstacle detection, crushing zones and force test
Adjust reversal on obstacle and prove compliance of the crushing forces with the calibrated dynamometer.
Gates, grilles and motorised closuresSwing gate: cantilever weight, hinges, wind load and sagging
Calculate the load on the hinges and lock off wind exposure to eliminate sagging of the leaves.
Gates, grilles and motorised closuresSecurity grille: burglary protection and blocked emergency exit
Secure openings against burglary while preserving the emergency opening required for the evacuation of persons.
Gates, grilles and motorised closuresFences: permitted height, property boundary, and the agreement you request beforehand
Check the legal heights and position your fences on the boundary without causing neighbour disputes.
Gates, grilles and motorised closuresControlling access: electric strike, intercom, pre-installed cabling and the limits of our package
Connect strikes and photocells without wiring confusion at the exact boundary of the electrical package.
Gates, grilles and motorised closuresGarage door: springs under tension, breakage and safe intervention
Tension garage springs safely with suitable equipment that prevents sudden breakage.
Gates, grilles and motorised closuresMaintaining a machine: service intervals, safety test and installation log
Structure the maintenance booklet and schedule the mandatory tests to maintain the machine approval of the access.
Gates, grilles and motorised closuresGate in a guardrail: opening direction, automatic closing and ground clearance
Integrate a swing wicket gate compliant with standard SIA 358 without breaking the fall protection.
Gates, grilles and motorised closuresHanding over the installation: manual release demonstrated, keys, instructions and contacts
Hand over the installation by training the client in emergency release, with a signed handover record.