🧱 CFC 274On-site welding, corrosion protection and safetyChapter 3 of 10 in the section

The arc burns: arc eye, protecting the eyes, the skin and the people nearby

On a metalwork construction site, the electric arc emits ultraviolet and infrared radiation that is destructive to the cornea and the epidermis. Unprotected exposure triggers a painful keratitis several hours after the work. This guide sets out the careful selection of welding filters, the body protection against skin burns and the installation of screens to protect the other trades.

Key takeaways

  • Actinic keratitis sets in during the night and keeps the metalworker off work for forty-eight hours.
  • The shade number of the optical filter depends directly on the intensity and the process used.
  • Any area of bare skin suffers severe erythema equivalent to a thermal burn.
  • Standardised welding curtains protect the people moving about in the immediate vicinity of the area.

Understanding the delayed effect of the arc and choosing the right eye-protection filter

When tack welding or assembling a handrail or a light stair stringer on site, the electric arc produces an extreme light flux including short ultraviolet rays and infrared. The main danger is the absence of any immediate burning sensation. UV radiation passes through the air without perceptible heating on the unprotected eye. Actinic keratitis, commonly called arc eye, generally appears between six and twelve hours after exposure, waking the fitter in the middle of the night with complete intolerance to light, heavy watering of the eyes and the unbearable sensation of grains of sand under the eyelids. The epithelial lesions require at least two days off work, the time needed for the superficial corneal layer to regenerate under an eye dressing and healing ointment.

To eliminate this risk, wearing a welding helmet with a certified optical filter is essential. Two technologies coexist on metalwork construction sites: passive mineral lenses tinted throughout and auto-darkening optoelectronic cells. Modern auto-darkening helmets offer greater safety for metalwork in awkward positions, because they allow the torch or electrode to be positioned with a clear view before the arc is struck, the filter switching to its dark state within a fraction of a millisecond as soon as the spark is detected. The operator never lifts the screen to check the fit-up of a flat bar or an anchor plate.

Recommended shade numbers by process and welding current
Light metalwork processWelding current rangeMinimum shade numberRecommended shade number
TIG on stainless steel or thin steel (handrail)Less than 40 A910
TIG on tube or thin sheet40 A to 100 A1011
Coated electrode (MMA on fittings)60 A to 150 A1011
MIG / MAG (solid wire on plates)100 A to 175 A1112
MIG / MAG (assembly of metalwork sections)175 A to 250 A1213

The choice of filter class tolerates no approximation. A cell that is too light causes retinal fatigue and lasting glare, while an excessively dark shade forces the metalworker to bring his face dangerously close to the weld pool, exposing him to slag spatter and fumes. For fitting external handrails, often carried out in clear weather, the sensitivity of the helmet's optical sensors should be adjusted to avoid spurious triggering caused by sunlight reflecting off bare concrete or neighbouring glazing.

Covering exposed skin and isolating the perimeter for third parties

The energy radiated by a welding arc does not only destroy the eyes: it directly attacks exposed skin. The combined action of actinic radiation causes severe erythema comparable to second-degree sunburn, with bright redness, a stinging burning sensation and blisters in cases of prolonged exposure. In finishing-work metalwork, working in uncomfortable positions — welding a stair landing overhead or connecting surface-mounted balusters — frequently exposes parts of the body that standard clothing does not cover.

  • Protecting the neck and throat with a leather-split bib fixed directly under the welding helmet.
  • Wearing a flame-retardant long-sleeved jacket or overall, fastened up to the collar, strictly excluding synthetic textiles.
  • Soft leather metalworker's gloves for the TIG process or leather-split gauntlets for the coated electrode.
  • A close seal between the sleeve ends and the glove gauntlets to leave no gap of bare skin.
  • Welder's cap or textile balaclava under the helmet to neutralise radiation reflected by light-coloured surfaces behind the head.

The third requirement concerns the protection of the other trades. On a building construction site, painters, electricians and plasterboard fitters move constantly near the area where the metalwork is being installed. A single accidental, repeated glance at an arc several metres away is enough to trigger keratitis in an unprotected worker. According to the recognised rules of occupational safety, the welding station must be enclosed by means of mobile screens or suspended welding curtains. These tinted transparent or opaque protections absorb all of the dangerous ultraviolet radiation while letting through harmless visible light so that the area can still be monitored.

  1. Marking out the work areaSet up stable welding screens with certified curtains around the metalwork element to be welded, providing a protection radius of at least two metres.
  2. Neutralising reflectionsPosition the screens to avoid arc reflection off glazed surfaces, bare aluminium or white-painted walls nearby.
  3. Warning those presentPut up a standardised sign prohibiting looking at the arc through the outer face of the protective partitions before the weld beads are started.

Selecting the right filter shade and shielding the metalworker's skin

On a building construction site, arc eye gives no warning at the moment of tack welding. The massive emission of short ultraviolet and infrared radiation destroys the corneal epithelium without triggering any immediate sensation of heat in the eye. Only in the middle of the following night does the metalworker wake up with the intolerable sensation of grains of sand under the eyelids, continuous watering of the eyes and total photophobia that keep the worker off work for a full forty-eight hours. The thermal and photochemical attack acts with the same intensity on the skin: an exposure of a few seconds to the arc from a coated electrode or a flux-cored wire is enough to cause first- or second-degree erythema equivalent to severe sunburn.

Recommended shade numbers for light metalwork and on-site fitting work
Welding process on siteUsual current range (A)Minimum shade required (number)Typical metalwork application
Coated electrode (MMA / SMAW)40 to 80 A9 to 10Tack welding of anchor lugs and repairs to steel handrails
Coated electrode (MMA / SMAW)80 to 150 A10 to 11Butt welding of flat bars, stiffeners and light stair stringers
Semi-automatic solid / flux-cored wire (MIG-MAG)80 to 125 A10Assembly of infill sheets, handrails and grille frames
Semi-automatic solid / flux-cored wire (MIG-MAG)125 to 175 A11Welding of tubular posts to floor base plates to be anchored
TIG (GTAW) direct current30 to 100 A9 to 10Fine finishing on brushed stainless steel or repairs to visible handrails

To block this radiation, the liquid-crystal optoelectronic helmet must switch to the chosen shade in less than a tenth of a millisecond. The classic mistake is to set a shade that is too light on the pretext of insufficient ambient light in stairwells or underground car parks. If the metalworker cannot see the weld pool, the technical answer is to bring in a stand-alone site floodlight aimed at the joint, not to degrade the protective filter. Likewise, the arc-detection sensors must be free of metal spatter: dirty sensors delay the automatic darkening during repeated arc strikes in the fitting phase.

Skin protection requires the systematic elimination of any area of bare skin. The sleeves of an ordinary cotton work jacket let UV rays through during prolonged passes and catch fire on contact with slag beads. The fitter must wear a welding jacket with a fastened stand-up collar closed by a hook-and-loop strip, fitted with sleeves of split leather or heavy non-flammable textile. The critical gap between the base of the helmet and the chest requires the addition of a radiation-proof bib clipped directly under the hood. Finally, the cuffs of the full-grain leather gloves must cover the sleeves with no open fold where incandescent steel beads and reflected beams could get in.

Containing the beam with non-actinic screens and prevention obligations under the OPA

The Accident Prevention Ordinance and the Accident Insurance Act require the employer to adapt safety devices to the state of the art in order to protect all personnel from occupational injury. On floor landings or terraces under fit-out, the risk is not confined to the metalworker: electricians, waterproofers or painters working in the same space suffer indirect arc eye through peripheral vision without even looking at the beam. The general obligation of coordination and collective protection in the ordinance on construction work forbids striking any arc without having contained the direct radiation and attenuated diffuse reflection on neighbouring surfaces.

  • Deploying certified non-actinic mobile screens or welding curtains that filter UV and blue light while remaining translucent so that outbreaks of fire outside can be watched.
  • Placing the curtain panels as close as possible to the work area, with no gap at floor level greater than 20 centimetres, to stop spark rebound and grazing rays.
  • Matting or temporarily covering light-coloured or reflective surfaces: white concrete walls, glazing already installed and metallised vapour barriers send the light back towards workstations behind.
  • Marking out a visual exclusion perimeter with a pictogram warning of the arc hazard and forbidding passage by trades that are not equipped.
  • Coordinating schedules with site management to move welding work outside the hours of heavy co-activity on escape routes.

When a worker or a third party reports suspicious eye tingling at the end of the day, the person must immediately be kept away from any light source and a doctor consulted. Using anaesthetic eye drops on one's own initiative without a formal medical diagnosis is prohibited because it suppresses the corneal reflex and aggravates eye damage. The incident must be recorded by the competent person responsible for occupational safety on the construction site so that the screens can be repositioned and the compliance of the personal protective equipment issued to the metalwork team checked.

Emergency protocol and first aid: responding to keratitis and actinic erythema

Arc eye gives no warning. When tack welding a handrail or fitting a flat bar on a construction site, exposure to ultraviolet rays seems painless. The burn to the cornea shows itself six to twelve hours later, often in the middle of the night, as an intolerable sensation of sand under the eyelids, continuous watering of the eyes and acute photophobia. This eye injury keeps the metalworker in bed for forty-eight hours. At the same time, uncovered skin on the neck or wrists develops actinic erythema identical to second-degree sunburn, weakening the skin barrier against grinding dust.

On return to the construction site, the event must be analysed so that the workstation can be corrected. The foreman checks the condition of the equipment: a scratched non-actinic lens, an optical sensor on the auto-darkening cell fouled by fumes or a darkening shade too low for the amperage used cause delayed triggering. If the accident affects a finishing trade working nearby, the responsibility of the metalwork company is immediately engaged under the Accident Prevention Ordinance, which requires risks to be neutralised at source. The absence of a mobile non-actinic containment screen is a serious organisational failing. The welding area must be completely reconfigured before any new arc strike: enclosure with standardised curtains that block ultraviolet, wearing a well-fitted leather jacket leaving no bare skin, and checking the blind spots for reflection on surrounding concrete walls or glazing.

Frequently asked questions

How do I choose the helmet filter shade when TIG welding a stainless steel handrail?

The TIG process produces very concentrated ultraviolet radiation with little masking fume. For usual on-site welding currents between 60 and 150 amperes, set an auto-darkening cell or fit a non-actinic lens between shade number ten and shade number eleven. Shade nine is reserved for very low tack-welding currents below forty amperes. An unsuitable shade tires the eye or triggers keratitis.

Why are standard cotton jacket sleeves insufficient for welding on a construction site?

Ordinary cotton fabric lets a significant part of the short ultraviolet radiation through and catches fire easily under slag spatter. Ultraviolet rays pass through the light weave and cause deep erythema on the forearms. The metalworker must wear flame-retardant professional clothing fastened up to the neck, completed by leather-split gauntlets covering the critical junction between the welder's glove and the jacket sleeve.

How far away should the welding curtain be placed to protect neighbouring painters or plasterers?

Install the containment screen as close as possible to the fusion zone, ideally between one and two metres from the workpiece, in order to capture direct radiation and reflection. The curtain must reach down to the floor to block sparks and rise above the line of sight of third parties. Make sure the screen carries a non-actinic conformity certification so that it effectively stops ultraviolet radiation.

What does the OPA provide for protecting personnel against radiation during installation work?

The Accident Prevention Ordinance requires the employer to take all recognised technical measures to protect the health of workers. This means providing the metalworker with appropriate eye and skin personal protective equipment, but also isolating the workstation with protective partitions or curtains to prevent third parties present on the construction site from being directly or indirectly exposed to the radiation.

Texts and standards cited

  • OPAGeneral obligation of the employer to take the protective measures required by the rules of technology and occupational medicine in order to protect the health of personnel