Key takeaways
- The leaf must open exclusively towards the stable walking surface of the arrival landing.
- Opening towards the descending flight creates an immediate loss of balance and constitutes a major non-conformity.
- A mechanical automatic return device with damping prevents any accidental holding in the open position.
- The clearance under the bottom rail must never compromise the statutory safety gauge.
Opening direction and kinematics: preventing the pull of the void
Inserting an opening leaf into a protective barrier changes the very function of the structure: from a fixed, impassable obstacle, it becomes a movable, localised break. On the upper landing of an external staircase or a raised terrace, the basic metalwork rule requires the leaf to swing exclusively towards the inside of the secured zone. In plain terms, the user passing through the gate to go down the stairs must pull the leaf towards themselves, step back on the flat landing, then move forward once the way is clear. A gate pushed directly towards the descending flight is a very serious trap: under an unintentional push, a gust of wind or a loss of grip in frosty weather, the user is thrown into the void with nothing to grab onto.
The positioning of the hinges and the stop post requires a rigorous analysis of the space available on the landing. As it swings, the leaf must neither sweep over a stair step nor force the user to place a foot on the stair nosing in order to close the panel. The free clearance on the horizontal floor must be at least equal to the nominal width of the leaf plus a comfortable step-back zone. If the staircase landing is shallow, the metalworker must adapt the clear passage width or offset the hinges to preserve this stable footing before any descent.
| Access configuration | Permissible direction of rotation | Required stop | Critical risk to be controlled |
|---|---|---|---|
| Upper landing to staircase descent | Opening towards the landing (pulling to go down) | Fixed stop welded on the void side | Direct fall down the slope |
| Access terrace to emergency staircase | Pulling from the terrace towards the safe zone | Reinforced strike plate with mechanical stop | Panic push opening onto the void |
| Intermediate landing between two flights | Pulling towards the horizontal resting surface | Double stop on post | Stepping on the stair nosing |
Automatic closing, locking and continuity of gauges
Leaving a staircase gate open amounts to removing the guardrail altogether. To guarantee continuous protection against falls without relying on the discipline of the occupants, an automatic return mechanism is required. On external structures exposed to Swiss temperature variations, frost and dust, simple coil springs built into the hinges are prohibited: their torque weakens quickly and they slam violently, with the risk of trapping fingers. The metalworker installs a hydraulic gate closer for external use or adjustable hydraulic-return hinges, capable of overcoming wind load while braking the final travel for a gentle engagement in the strike plate.
- Ground clearance under the leaf
- Vertical distance measured between the lower edge of the gate's bottom rail and the finished walking surface of the landing or the landing step.
The geometry of the closed leaf must scrupulously comply with the non-climbability and non-passage gauges prescribed by SIA 358. The ground clearance under the leaf is the most vulnerable point of the structure. While an opening leaf in a fence sometimes allows wider tolerances, a gate integrated into a staircase guardrail must not allow the standard-defined test sphere to pass above the finished level. This ground clearance must take into account the functional play needed to prevent the bottom rail from rubbing on unevenness in the paving or on the stair nosing during rotation.
- Positioning the leafWedge the frame in the closed position in strict alignment with the fixed handrail of the guardrail, checking that the lateral clearances are a constant five millimetres.
- Adjusting the lower clearanceAdjust the height of the hinges to maintain a clearance under the bottom rail that complies with the body-passage limits prescribed by SIA 358.
- Calibrating the closing forceSet the preload force of the gate closer and the hydraulic damping speed to ensure complete relocking without excessive impact.
- Checking the fixed stopCheck the effectiveness of the mechanical stop under a firm push simulating a body impact directed towards the void.
Controlling the ground clearance under the leaf and crossing the landing
Integrating a movable leaf into the continuity of an external staircase guardrail creates a critical kinematic break. Whereas a fixed guardrail maintains a constant gap with the slab edge or the steps, the gate sweeps over a flat or sloping surface. In building metalwork under CFC 274, the clearance left under the bottom rail of the leaf is one of the most sensitive control points. Too large a gap allows a foot or lower limb to slip through in the event of a stumble towards the top of the flight, while an insufficient gap causes the leaf to catch on the surface finish during frost or gravel deposits.
SIA 358 sets the geometric requirements intended to prevent the passage of a human body and to prevent objects from falling. Next to a staircase flight or an external access landing, the clearance between the lower edge of the closed gate and the finished floor must in no case exceed the values prescribed for guardrails, that is a gap strictly below 50 mm in areas where there is a risk of sliding into the void, or the gauge of a sphere of 120 mm diameter for standard infill. Where the leaf is placed immediately next to the first descending riser, this dimension must be measured directly below the edge of the stair nosing.
To reconcile the air gap needed for proper external operation with the requirement of non-passage, the metalworker uses an added threshold or an offset bottom rail. Fitting a continuous stainless steel flat bar or an angle chemically anchored into the slab creates a clear stop rebate at floor level. This metal profile forms a local, non-tripping raised section that mechanically reduces the residual opening under the leaf without having to lower the main post down to the raw surface finish.
Closing clearances, end-of-travel stops and gap checks
Maintaining the protective gauges concerns not only the locked rest position. Throughout the travel of the leaf and during its damping by the automatic return, the lateral gaps between the gate post and the adjacent guardrail posts must be controlled. The space between the pivot axis and the fixed frame post must not create a shearing or trapping zone for hands, while still preventing the passage of the test gauge defined by SIA 358. A closing clearance of between 5 and 8 mm on the strike plate side ensures smooth engagement of the latch bolt without leaving a gaping void.
| Check point | Execution tolerance | Safety consequence |
|---|---|---|
| Clearance under bottom rail (gate closed) | Maximum 50 mm (or 120 mm sphere depending on zone) | Prevents feet from passing through or sliding under the structure in a fall |
| Lateral clearance pivot post / fixed post | Constant between 4 mm and 8 mm | Prevents finger pinching and maintains the continuity of the balusters |
| Pivot axis relative to the stair nosing | Minimum setback of 150 mm towards the landing | Eliminates the void under the foot during the opening manoeuvre |
| Automatic return travel | Positive locking without rebound (1 to 3 seconds) | Prevents the leaf from staying ajar under gusts of wind |
Installing a robust mechanical opening stop is mandatory on an external structure. Without a physical limit on the angle, a violent gust of wind or an accidental push transfers the entire torsional moment to the spring hinges or to the arm of the hydraulic gate closer. Failure of these pivot components immediately disrupts the automatic return, leaving access to the staircase open without restraint. The stop must be anchored to the floor on the arrival landing or welded to the top rail of the fixed receiving guardrail, with a UV-resistant vulcanised elastomer damping pad.
- Checking levels and sweepMark out with a line the full arc described by the opening leaf. Measure with an optical or laser level the variations in height of the paving along the whole path to determine the minimum ground clearance required.
- Fixing and wedging the receiving strike plateClamp the closing post onto the chemical anchors of the fixed guardrail. Check the parallelism of the posts with a plumb line to avoid any binding of the latch bolt.
- Adjusting the return force of the gate closerAdjust the hydraulic braking valve and the mechanical preload to ensure complete engagement in the strike plate against wind resistance, while limiting the impact force to protect users.
- Checking gauges with the test gaugePass the spherical test gauge under the bottom rail and between the vertical posts. Record the conformity of the gaps in the acceptance report for the work.
Corrective measures on the construction site and acceptance of a non-conforming gate
When an execution check reveals a defective gate integrated into an external staircase guardrail, the metalworker must neutralise the danger before leaving the construction site. If the leaf swings by mistake towards the descending flight or if the self-closing mechanism does not ensure positive engagement of the latch bolt in the receiving strike plate, the structure is a serious trap for users. A temporary physical block with a lashing strap or a temporary mechanical lock is required as soon as the defect is found, until the hinge kinematics or the alignment of the posts has been corrected in accordance with good practice.
- Diagnosing plumb and clearancesCheck with a spirit level and plumb line the verticality of the tubular posts and the slope variations of the finished paving to isolate the cause of friction or excessive play.
- Reworking the fixing and reversing the directionRemove the anchor screws of the support plate, realign the shims under the base and reverse the hinges or the added mechanical stop to prevent any swing towards the void.
- Extending the underside of the railWhere the gap under the leaf exceeds the permissible limit at any point of travel, mechanically fix or weld a folded galvanised steel sheet flashing to restore the required clearance.
- Calibrating the damper and the springAdjust the hydraulic fluid throttling screws of the closer to obtain a constant, smooth closing speed, ensuring the latch bolt retracts fully until final locking.
Remedial work requires rigorous verification with a standardised physical gauge to confirm that passage is impossible according to the criteria of SIA 358. The metalworker records each measurement on a self-inspection sheet, stating the manual opening force, the automatic reset time and the latch bolt engagement. The work is presented to the site management for signature of the acceptance report only once these conditions are met reproducibly.
Frequently asked questions
What should be done if the slope of an external landing blocks the leaf from opening towards the secured zone?
Where the topography or the drainage slope forces the leaf to scrape when opening towards the landing, it is forbidden to change the kinematics towards the staircase descent. The metalworker must fit helical hinges that lift the leaf as it rotates, or raise the hinge axis by combining a raised bottom rail and a flexible or rigid lower flashing that maintains the prescribed gaps.
How can the locking of a gate exposed to the strong Swiss wind be guaranteed?
A simple coil spring is not sufficient against gusts at altitude or in open surroundings. An external hydraulic closer with an end-of-travel damper and an adjustable final latching action should be installed. This device applies a constant force over the last millimetres to overcome the friction of the latch bolt against the strike plate, while avoiding violent slamming that could loosen the fixings in the stringer or masonry.
What technical solution should be applied if the clearance under the gate exceeds the permitted gauge?
If structural work tolerances create too large a gap at floor level, the metalworker must not lower the whole leaf at the risk of jamming the fitting on the threshold. The compliant method is to attach under the bottom rail a tubular metal raising profile or a matching folded sheet strip, securely fixed with concealed self-drilling screws or riveted, ensuring the geometric continuity of the guardrail without any snag point.
Which check points should be recorded in the report at acceptance of the work?
The report must certify the swing direction towards the refuge, the effectiveness of the self-return from any opening angle, and the absence of any gap larger than the SIA 358 gauge under the leaf and between fixed posts. The metalworker also checks the tightening torque of the plugs in the masonry, the pull-out resistance of the hinges and the absence of any dangerous pinch point during operation.
Texts and standards cited
- norme SIA 358Guardrails - Construction provisions and safety requirements against falls
