Key takeaways
- Installing a track requires absolute flatness over the entire travel of the metal leaf.
- The cantilever system eliminates the floor track but requires a substantial anchoring block.
- The top guide must absorb wind thrust without jamming the moving structure.
- A floor track must never be greased, as this causes gravel, dust and dead leaves to cake together.
Sloping ground and fouling: deciding between a floor track and a cantilever leaf
Installing a sliding gate on a track requires the guide section to be strictly horizontal. On ground with a cross slope relative to the passage, laying a track means building a concrete ground beam that either protrudes on the downhill side or is sunk into the ground on the uphill side. If the track follows the slope of the access, the motor is subjected to a constant asymmetric load and the gate risks running away under gravity when manually disengaged, which breaches the recognised rules of safety for power-operated closures. As soon as the threshold crosses a gravel surface or an area exposed to dead leaves and snowdrifts, repeated fouling of the groove blocks the wheels and overloads the motor drive.
| Installation criteria | Sliding gate on floor track | Cantilever gate |
|---|---|---|
| Civil engineering required | Continuous strip ground beam over the whole travel (2x the width of the opening) | Massive foundation block only in the closing-end area |
| Sensitivity to the ground | Critical with regard to stones, black ice, leaves and differential settlement | Insensitive to the surface condition of the opening (clearance of 50 to 100 mm) |
| Lateral space requirement | Leaf length equal to the clear opening plus the overlaps | Leaf extended by 30 % to 40 % to form the rear guide tail |
| Weight and inertia | Light bottom beam, as it is supported over its full length | Reinforced structure and heavy profiled beam to limit deflection |
The cantilever gate definitively resolves the problem of gravel and winter snow. The slotted tubular bottom beam sits over two rotating wheel carriages anchored outside the vehicle path. On the other hand, this arrangement transfers the entire overturning moment to the rear foundation. The metalworker must coordinate with the masonry contractor the construction of a foundation block designed to resist pull-out in accordance with SIA 261, with anchorages by threaded rods set in non-shrink chemical grouting mortar or cast in during pouring.
Top guide, setting lateral clearances and maintaining the running gear
The vertical stability of a sliding gate relies on its top guide, whether this is a guide post with Teflon rollers or a top guide rail housed under the upper frame. The connection must accommodate the dynamic deflection of the structure under wind load while avoiding friction that damages the paint. A gate must never clamp its wheels against the tubular rail: an overall functional clearance of 3 to 5 mm is necessary to tolerate thermal dimensional variations and the manufacturing tolerance permitted by SIA 118.
- Setting out the guide frameCheck the plumb of the guide post with a spirit level or laser. Tighten the mechanical fixings on the concrete base, providing metal adjustment shims to neutralise out-of-plumb errors in the structural work.
- Adjusting the centring rollersAdjust the spacing of the polyamide rollers to leave 2 mm of clearance on each side of the guide tube. Tighten the lock nuts and check by hand that there is no tight spot along the whole path.
- Fitting the end-of-travel stopsFix the non-removable mechanical stops to the ground and at the top of the post. Under no circumstances may the gate leave its guides on overtravel, even under a violent manual push.
On a variant with a floor track, the service life of the installation depends on the geometry of the track-wheel contact. Wheels with a half-round groove of 10 or 12 mm radius are paired with a round rail welded onto flat steel, whereas V-grooves wear prematurely if sand settles in them. The classic mistake on site is to lubricate the floor section with general-purpose grease. The grease picks up abrasive particles, forming a paste that wears the sealed ball bearings and makes the drive wheel slip. The track must be kept dry, cleaned with a brush or a high-pressure washer, and the wheel bearings must be of the sealed, lubricated-for-life type.
Concrete ground beam, track levelling and sections in the presence of gravel
Installing a sliding gate on a track requires strict horizontality. If the vehicle access route has a cross slope, even a slight one, the track must never follow the cross-fall of the ground, otherwise the motor is overloaded on closing or a dangerous runaway occurs on opening. The reinforced concrete strip footing must be cast level, below frost depth, forming a step or offset relative to the upstream asphalt or paving. To prevent run-off water from turning the track into a collecting channel and depositing hardcore in it, the metalworker specifies an interception kerb and water drainage slots under the running section every metre.
| Configuration | Mechanical advantages | Vulnerability to gravel and leaves | Installation on sloping ground |
|---|---|---|---|
| Round rail to be embedded (round groove) | Excellent load distribution, low rolling resistance, partly recessed wheel | Sensitive: gravel remains lodged at the bottom of the groove and blocks the wheel | Requires a perfectly levelled concrete base beam with lateral drainage slots |
| Inverted angle (V-groove wheel) | The pointed profile naturally pushes aside some of the gravel as the gate leaf passes | Moderate: wet leaves stick to the chamfer; fouling of the track flanks | Easy to set with anchor studs before pouring non-shrink grouting mortar |
| Cantilever beam (tubular section) | No ground contact in the useful opening, insensitive to gravel, mud, snow and ice | None at ground level: the wheels run enclosed inside the load-bearing section at the rear of the opening | Rear block sized for cantilever loading; crosses slopes without touching the roadway |
Where the client refuses the cantilever system because of the space needed at the closing end, the choice of floor section turns to a track screwed onto a continuous plate or a galvanised steel section set in a slot of epoxy mortar. The metalworker systematically installs in front of each wheel a 4 mm thick steel stone guard, welded to the leaf 5 mm above the ground. This fitting mechanically pushes aside stones thrown up by vehicles before the wheel runs into them.
Top guide, lateral clearance and preventive maintenance
The top guide ensures the vertical stability of the gate leaf against wind thrust. It consists of a frame of square tubes or a bracket fixed against a stiffening post, incorporating two or four polyamide, Teflon or polyurethane rollers mounted on an adjustable threaded axle. A frequent mistake is to tighten the guide rollers too much against the upper member of the gate: under the action of the sun or the natural flexing caused by wind, the leaf rubs, deforms and trips the current-sensing safety of the closing motor.
- Adjusting the lateral guide clearanceAdjust the rollers, leaving a free clearance of 2 to 3 mm on each side of the upper tubular section. This clearance absorbs variations in the straightness of the gate over its whole travel without allowing a noisy rattle.
- Alignment of the receiving keeperPosition the end-of-travel stop with its guide shoe fitted with lead-in chamfers. On closing, the gate must ride up slightly onto an Ertalon wedge to relieve the front wheel of the weight of the leaf.
- Fixing the mechanical end stopsFit a non-removable mechanical stop at full opening and at full closing, anchored directly into the concrete block, independently of the electrical limit switches of the motor drive.
In the case of a cantilever leaf, the kinematics rely on two wheel carriages mounted on the rear reinforced concrete block. These internal wheels are fitted with sealed bearings protected against splashes by lip seals. The end of the guide section must have a bolted metal sealing cap to prevent the intrusion of dead leaves, wasps' nests or rodents inside the drive track.
- Every six months, check with a lifting lever that there is no play in the floor wheel bearings.
- Blow out the drainage slots of the concrete footing at high pressure to prevent frost damage in winter.
- Check the surface wear of the polyamide top guide rollers and replace any bushes that have become oval.
- Check the torque tightening of the chemical anchor rods connecting the load-bearing carriages to the concrete block.
Handling malfunctions, levelling disputes and technical remedies
On site, a sliding gate that derails or whose motor trips almost always reveals a defect at the interface between the masonry and the metalwork. As soon as abnormal rubbing or repeated jamming of the wheels in the groove appears, the metalworker must make a methodical diagnosis before any mechanical rework. The classic mistake is to force up the motor torque, which masks the fault until the bearings fail or the leaf twists under the load.
- Geometric check of the baseCheck the level of the ground beam over the whole travel using a laser level. Any differential settlement exceeding the tolerances of SIA 118 distorts the attitude of the leaf, pinches the wheels against the flanks of the section and overloads the top guide rollers.
- Inspection of the track and drainageLook for areas of standing water, ice or accumulated gravel. If the floor section was embedded without provision for sweeping or without regular purge slots, fouling by road aggregates mechanically blocks the wheels at every pass.
- Recording the clearances at the top guideMeasure the lateral gap between the polyamide rollers and the upper tube. A clearance smaller than the permissible thermal variations causes the gate to bind in summer, hindering operation.
Where the masonry work has a structural defect or an impracticable slope not indicated on the plans, the contractor applies his duty to notify under the Code of Obligations (CO) and SIA 118 by immediately sending a detailed report to the site management. To remedy unstabilised gravel ground that constantly fouls the running track, conversion to a cantilever solution with a profiled bottom beam and rear concrete block remains the only lasting remedy, avoiding recurring disputes during winter maintenance operations.
Frequently asked questions
How should a track-mounted sliding gate that derails systematically in winter be dealt with?
Winter derailment most often results from the freezing of residual water under the section or from the accumulation of de-icing gravel in the groove. Check that the ground beam has drainage weep holes every metre. If the track is embedded in the asphalt without a lateral slope, clear the groove with a wire brush, check the wear of the wheel flanges and fit stainless steel stone-guard brushes at each end of the leaf.
What horizontal alignment tolerance must the concrete ground beam respect for a floor track?
The flatness of the base ground beam must meet the usual requirements of SIA 118, i.e. a maximum deviation of plus or minus two millimetres under a two-metre straightedge. Any local dip creates a low point where debris accumulates and where the wheel drops, causing a jolt harmful to the motor pinion. In the case of a pronounced depression, correct the base with resin mortar before fixing.
Why prefer the cantilever gate on an access yard of unstabilised gravel?
On a gravel surface, the regular passage of vehicle wheels continuously throws stones into the operating area. A floor track requires daily sweeping to avoid gravel being crushed under the steel wheels. The cantilever system eliminates all contact with the ground of the opening: the running carriages are enclosed in the lower tubular member, remaining completely sealed against mud, rubble and snow.
What lateral clearance should be left between the upper member and the guide rollers?
A functional clearance of two millimetres on each side is essential to absorb the straightness tolerances of the tubular section and the thermal expansion of the steel without causing jamming. If the fit is too tight, the leaf rubs and trips the current-sensing safety of the motor. If the clearance exceeds four millimetres in total, the gate rattles in gusts of wind, which wears the mounting bracket prematurely.