Skip to content
Website
🧱 CFC 274Balustrade loads and sizingChapter 4 of 10 in the section

The base plate: thickness, number of bolts, position and visible deformation

After this chapter, you will be able to determine the minimum thickness of a column base plate, choose between a solid plate and a stiffened plate, and set out your anchor bolts to eliminate the dishing effect under horizontal load, in strict compliance with SIA 358 and the rules of the metalworker's trade.

Key takeaways

  • A plate that is too thin bends into a dish shape before the anchor is even stressed to its maximum.
  • SIA 358 requires an overall stiffness that rules out any perceptible play under normal thrust.
  • Adding a welded stiffener makes it possible to reduce the steel thickness while preventing the lever effect.
  • The bolt layout must maximise the lever arm without splitting the slab edge.

Dishing deformation and sizing of the steel thickness

When a service load is applied to the handrail of a railing, the force is transmitted in full to the column base in the form of a major overturning moment and a shear force at the base. If the fixing plate has insufficient steel cross-section, it enters plastic bending well before the failure resistance of the anchor bolts has been mobilised. The sheet lifts on the tension side, deforms into a dish shape around the vertical section and crushes the concrete on its compressed edge. This visible deformation undermines users' sense of safety, creates an unacceptable misalignment and causes the fillet weld to fail through cyclic fatigue.

In standard execution without a stiffener, for a tubular railing post subjected to a nominal thrust at the top, an 8 mm or 10 mm steel plate generally proves too flexible. The lever arm effect between the post shaft and the drilling axis generates a localised moment that bends the steel base. The metalwork workshop must specify a thickness of 12 mm to 15 mm in standard structural steel to guarantee rigid behaviour without warping. As soon as the railing height exceeds one metre or the required line load increases, the metalworker systematically uses stiffening gussets 6 mm to 8 mm thick, welded in line with the flanges of the post, which makes it possible to keep the base plate thickness at 10 mm while neutralising the tilting effect.

Plate behaviour according to its thickness for a standard post
Plate thicknessConfigurationMechanical behaviourObservation at the column base
6 to 8 mmFlat, without stiffenerImmediate plastic bending under loadPronounced dishing deformation, tearing of the finish
10 mmWith welded corner gussetRigid base, force transmitted to the anchorageNo visible bending, horizontality maintained
12 to 15 mmFlat, without stiffenerRigid base through its own inertiaImperceptible deformation, clean lines without gusset

Number of anchors, spacing and control of lever effects

The transmission of the overturning moment to the concrete depends directly on the geometric layout of the fixing holes. The most frequent mistake on the construction site is to bring the fixings too close to the post in order to reduce the footprint of the plate on the floor. Too small a spacing between the compression line and the tension line multiplies the pure tensile force carried by the threaded rod. This situation increases the risk of a parasitic lever effect: the flexible plate presses strongly on its free edge before the anchor has reached its elastic extension, which doubles the tension in the rod through a simple tilting effect.

Parasitic lever effect (prying action)
Mechanical phenomenon whereby the deformation of an overly flexible plate creates a rigid contact point at its outer edge, turning the whole into a lever that multiplies the tensile force exerted on the rear fixings.
  1. Definition of the effective spacingSpace the tensioned anchor line and the compressed face of the post by a sufficient amount to limit the unit tension, never going below three times the nominal diameter of the anchor.
  2. Compliance with distances to the slab edgeMaintain the regulatory distance required by the technical assessment of the anchor from the edge of the reinforced concrete in order to rule out any spalling of the slab nosing under combined load.
  3. Symmetrical or offset layoutPlace two anchors on the main tension line rather than a single central anchor, in order to ensure stability against overturning and balance the shear stresses.
  4. Torque-controlled tighteningTighten the nuts with a torque wrench calibrated according to the anchor manufacturer's data sheet, avoiding any deformable washer that would allow early uplift.

Correct sizing of a metalwork railing base combines a calibrated base thickness, a maximum lever arm between the stud axes and excellent nodal stiffness at the weld bead. By controlling these parameters, the metalworker guarantees the durability of the structure without impairing the perimeter waterproofing or weakening the supporting concrete.

Base stiffeners and control of the bending moment

In the practice of the building metalworker, the fixing plate is not a simple bearing pad but a mechanical transition part subjected to a direct overturning moment. When the horizontal thrust defined by SIA 358 is applied to the handrail, the railing post acts as a lever of about one metre on the anchor base. If the sheet thickness is insufficient, the plate bends locally even before the anchoring elements in the slab are stressed to their full permissible capacity. This phenomenon of plastic dishing deformation causes a visible rotation of the post, creating a feeling of insecurity for the user and a non-conformity of the finished structure.

To overcome this risk without needlessly making the base heavier with solid plates of more than twenty millimetres, adding welded stiffeners is the appropriate technical solution. A triangular gusset, laser-cut and welded on either side of the hollow section or flat bar, transfers the tensile force directly above the fixing line. The internal lever arm between the zone compressed on the concrete and the tensioned anchor line is thereby stabilised. The fillet weld joining the gusset to the post and to the plate must be continuous and free of undercuts to avoid any crack initiation under repeated loading.

Layout of holes, edge distances and stiffness under load

The geometric layout of the bolts determines the overall stiffness of the connection. Positioning two anchors only on a line parallel to the drop exposes the base to immediate tilting through lack of lever arm. A fixing at three or four points, sensibly arranged according to the direction of the dominant loads imposed by SIA 358, makes it possible to distribute the tension over a rear row while keeping the front zone compressed against the screed or the raw slab. The spacing between the holes must guarantee enough room for the torque-wrench sockets to pass without hitting the post shaft or the gussets.

Mechanical behaviour of railing base configurations
Base configurationUsual steel thicknessLayout of the fixingsBehaviour under horizontal thrust
Flat plate without stiffener8 to 10 mm2 holes in the thrust axisRapid dishing deformation, early yielding of the steel
Standard thick plate12 to 15 mm4 holes at the cornersModerate bending, good seating but greater footprint on the slab
Thin plate with rear gusset10 mm3 holes (2 rear in tension, 1 front)High stiffness, direct transfer of tension without visible buckling
U-shaped plate or folded shoe8 mm2 staggered side holesStiffness provided by the vertical returns, excellent compactness

Compliance with the distances to the plate edges, known as edge distances, determines the resistance of the metal to tear-out. An edge distance of less than one and a half times the hole diameter exposes the sheet to tearing or bulging under the tightening torque of the washer. On the mineral support side, the minimum distance to the slab edge must absolutely comply with the anchor manufacturers' technical requirements to avoid spalling of the concrete at the edge. Incompressible bedding of the base with non-shrink mortar or with calibrated metal shims ensures perfect contact under the whole active surface of the plate, preventing the void under the steel that accentuates the dishing deformation.

Finding of bending and remedial measures on a deformed plate

On a railing construction site complying with the safety requirements of SIA 358, serviceability stiffness is as decisive as ultimate resistance. A base that bends under horizontal force creates an unacceptable feeling of insecurity for the user and alters the line of contact of the anchors. When the plate thickness was underestimated at the time of ordering or the spacing of the fixings generates too large a lever arm, the metalworker must intervene methodically without improvising wild drilling in the concrete slab.

  1. Diagnosis of the defect under test loadRemove any cover to observe the behaviour of the metal at the weld of the post. Measure with a rule or a dial gauge the uplift of the free edge and the crushing of the compressed zone during thrust applied at the top of the railing.
  2. Mechanical stiffening by welded ribsIf the concrete support shows no spalling and the anchor remains immobile, fitting triangular stiffeners is the most effective solution. Weld, in the workshop or on site, two gussets of thickness equivalent to the wall of the post, arranged in the plane of maximum bending to transfer the load directly onto the line of bolts.
  3. Addition of a load-distribution counter-plateIn the case of a sheet that is too thin and cannot be removed immediately, insert a thick upper plate drilled at the same spacing or thick bevelled square washers, in order to widen the bearing zone of the nuts and eliminate the point shear.
  4. Complete replacement and notice of modificationIf the permanent deformation exceeds the geometric tolerances or if the spacing of the anchors creates a crack at the slab edge, remove the element. Fabricate a new base of increased thickness, validated according to the recognised rules of the metal trade and the serviceability criteria of SIA 358.

The acceptance record must mention any technical adaptation made to the anchor connections. In the event of a dispute over the stiffness of a balustrade, rework with stiffeners avoids the complete reconstruction of the waterproofed slab heads.

Frequently asked questions

How do you correct a column plate that ripples when tightened to torque?

Rippling indicates insufficient thickness under the nut bearing area or an out-of-round condition on the concrete. The assembly must be loosened, the flatness of the support checked, and rigid stainless steel shims or non-shrink grouting mortar inserted. The use of wide, thick washers also makes it possible to distribute the prestress pressure without distorting the base sheet.

Does SIA 358 impose an absolute minimum thickness for the steel of the plates?

SIA 358 sets performance, restraint and maximum permissible deflection requirements under service load, without prescribing a flat millimetric thickness. It is the metalwork sizing that determines the thickness needed to prevent the lever effect and plastic deformation. In current practice at the base of a tubular post, thicknesses below eight or ten millimetres rarely satisfy stiffness checks.

Can an additional bolt be added at the centre of an existing plate?

Adding a fixing at the centre of a bent plate is often pointless against the tilting moment. The bending moment is resisted by the couple between the compressed zone and the outer tie rods. Drilling the centre weakens the steel section under the post shaft without increasing the useful lever arm. It is clearly preferable to add vertical stiffeners connecting the tube to the existing outer bolts.

When should welded stiffeners be preferred to an increase in the sheet thickness?

Stiffeners are required when the floor footprint is limited or when the waterproofing recess rules out a massive overhanging plate. Two vertical gussets of six millimetres welded on either side of the post provide a much higher inertia than a flat fifteen-millimetre sheet, for a lower weight and material cost, while neutralising the dishing deformation at the anchors outright.

Texts and standards cited

  • norme SIA 358Railings: safety requirements, horizontal and vertical service forces, restraint criteria and limitation of deformations in service.

In the same section