Skip to content
Website
🧱 CFC 274Gates, grilles and motorised closuresChapter 8 of 10 in the section

Maintaining a machine: service intervals, safety test and installation log

After this chapter, you will be able to structure the preventive maintenance of a motorised closure in line with the Machinery Safety Ordinance and the SN EN standards. You will master the dynamic test protocol for photocells and sensing edges at each visit, as well as the full traceability of interventions in the maintenance log handed over to the operator of the structure.

Key takeaways

  • An automated gate is a machine in service that requires formalised, scheduled preventive maintenance.
  • The interval between inspection visits depends directly on the rate of use and on the manufacturer's requirements.
  • A full test of the detection devices and a measurement of the impact forces are required at every intervention.
  • The locksmith records each operation in the installation log kept on site by the responsible operator.

Carry out the detection tests and check the mechanical components at each visit

As soon as a swing or sliding leaf is fitted with an electric drive, the structure falls within the scope of the Machinery Safety Ordinance. The locksmith is no longer working on a simple decorative fitting, but on a moving mechanical assembly capable of exerting crushing, shearing or drawing-in forces. Maintaining a motorised gate does not mean lightly greasing a roller or a pivot: it requires requalifying the entire kinematic safety chain. The series of SN EN standards governing safety in the use of doors and gates defines the critical zones where the risks of bodily injury must be eliminated by design or by active detection.

At each inspection visit, the technician carries out a series of rigorous functional tests on all components contributing to the protection of persons. Sensitive edges or sensing strips, whether resistive or optical, are subjected to manual pressure over their entire useful length to verify immediate reversal of travel. Photoelectric stop or reopening cells are tested by masking them with a standardised opaque test piece, at floor level, at the centre of the clear opening and at the stop height defined by the manufacturer. In parallel, the components that intrinsically limit motor forces are checked with an impact-measuring dynamometer, to certify that the residual dynamic force remains below the damping curves required by the relevant SN EN standards.

  1. Structural check and mechanical guidanceChecking of operating clearances, absence of deformation of the cross-members, checking of the tightening torque of the anchor plates, inspection of the physical end stops and greasing of the guides.
  2. Detection test and sensitive devicesIndividual crush test of the active sensing edges, checking of the alignment of the photoelectric cell beams and simulation of a signal cut-off during a closing movement.
  3. Dynamic measurement of contact forcesRecording of the impact and residual thrust forces at the main crushing points using a calibrated measuring instrument, with immediate comparison against the permissible standard thresholds.
  4. Check of emergency controlsManual disengagement of the automatic drive to move the leaf by hand without any tight spot, checking of the correct operation of the electrical cut-off contact and resetting of the locking device.

Set the service interval and document the installation log

The interval between maintenance visits for a motorised closure is set according to how intensively the access is used and the recommendations of the drive manufacturer. For a private house with fewer than five cycles per day, an annual check is generally enough to prevent mechanical drift and premature wear of the guides. On the other hand, for the gate of a multi-occupancy residential building or the entrance to a commercial site subject to several tens or hundreds of cycles per day, a maintenance contract providing for two to four visits per year is essential to guarantee operational reliability and the continued compliance of the machine.

Typical maintenance intervals and check points by use
Type of siteIndicative frequencyMain check pointsAdministrative obligation
Single-family housing1 visit per yearPivots, rollers, cell clearance, key releaseManufacturer's recommendation and SN EN standards
Residential co-ownership2 visits per yearSensing edges, rack wear, area lightingPreventive maintenance contract with log
Industrial or logistics site3 to 4 visits per yearMotor brake, floor anchors, heavy stops, forcesSafety log required for machines
High-turnover public car park4 visits per yearMagnetic loops, safety devices, kinematicsContinuous operational monitoring and formal inspection

The installation log, or maintenance log, is the key document in the technical file of the structure. Handed over to the operator when the gate is commissioned, together with the declaration of conformity, this document must remain available near the installation for any technical or administrative consultation. At each preventive visit or emergency repair, the foreman or team leader enters in it the date of the intervention, the number of cycles shown on the management counter, the exact nature of the adjustments made, the references of the wearing parts replaced and the numerical values of the impact forces measured. The operator and the locksmith jointly sign the intervention report, thereby recording the transfer of findings and the formal lifting of any reservations about the condition of the closure.

Handover of the maintenance log and the operator's obligations

As soon as a swing or sliding gate is fitted with an electric drive, the metalwork firm no longer supplies a simple assembly of mechanical and welded elements, but a complete machine. The locksmith-manufacturer or the installer bears responsibility for the technical commissioning, which requires a complete operating file to be handed over to the client or the client's representative. This file includes the instruction booklet, the declaration of conformity under the Machinery Safety Ordinance and, at the centre of day-to-day operation, the maintenance log of the installation. This follow-up document is not a mere commercial recommendation: it is the legal logbook that records the mechanical condition and the successive interventions throughout the service life of the closure.

The minimum maintenance interval follows from the recommendations of the drive manufacturer, the geometry of the metal structure and the frequency of use. In the multi-occupancy housing sector or on craft and industrial sites in French-speaking Switzerland, the usual rate is two visits per year. For individual residential installations with a low opening cycle, one visit per year is generally sufficient. The maintenance agreement binds the operator to a qualified locksmith firm with staff trained in automation and in the rules of closure metalwork.

Maintenance interval and recording points by type of use
Use of the gateEstimated daily cyclesMaintenance intervalMandatory entries in the log
Private house / private accessFewer than 10 cycles/day1 visit every 12 monthsCell test report, visual check of pivots, signature of the technician
Rental building or condominium (fewer than 20 units)10 to 50 cycles/day2 visits per year (6-month interval)Dynamic force reading, wear sheet for rollers/stops, property manager's signature
Industrial site, underground car park, logisticsMore than 50 cycles/day2 to 4 visits per year depending on the contractReversal curves, rack wear report, complete safety protocol

Detection tests at each visit and shutdown protocol

Every scheduled maintenance visit requires a complete operational check of the kinematic chain and the protective devices. The locksmith does not merely grease the metal joints or dust the covers: the detection test is carried out methodically at each visit. This test covers all the active components that prevent users from being crushed, trapped or sheared, in accordance with the SN EN standards on motorised doors and gates. The components tested include the photoelectric cells at the opening, the resistive or optical sensing edges fitted on the primary and secondary edges, and the intrinsic force limiter of the motor unit.

The photoelectric cells are tested by interrupting the light beam during the closing travel with a test piece: the gate must stop immediately and command full reopening without excessive delay. The deformable safety edges distributed over the leaf or the guide posts are tested by physical impact in several zones: at the foot of the post, at mid-height and in the upper part. The locksmith confirms that deformation of the sensitive edge triggers the instantaneous reverse signal before the hard metal point is reached.

The visit ends with the drafting of the inspection report, entered in full in the maintenance log. The document states the dates, the times, the name of the technician, the values measured, the state of wear of the mechanical guide parts and the list of supplies replaced. Where corrective metalwork is required (rework of the floor anchor, alignment of the pillars, replacement of a safety cable on a heavy leaf), the locksmith records the reservations in the log. The lifting of these reservations requires a new complete test protocol before the machine is put back into service.

Handling critical failures and the owner's refusal to have work carried out

When a detection test at a visit reveals an outright failure of an active safety device — a photoelectric cell masked without reversal, a severed sensing profile or exceeding of the dynamic forces prescribed by the SN EN series of standards —, the locksmith is faced with equipment that has become dangerous. The motorised gate then changes from the status of an appliance in service to that of a machine unfit for operation under the Machinery Safety Ordinance.

  1. Immediate mechanical and electrical lock-outDisengage the drive, lock out the power supply on the lockable isolator and immobilise the leaf in the open or closed position using a chain or a locked mechanical stop.
  2. Entry in the installation logEnter the exact fault in the log, state the non-compliant test, and record the disengagement carried out, the date, the time and the formal prohibition of motorised operation until repair.
  3. Countersignature and shutdown noticeHave the intervention sheet countersigned by the operator or its technical manager. If neither is present, display a clearly visible prohibition sign on the posts and send the written notice without delay.

The log handed over to the operator at acceptance of the work is the only supporting document attesting that the locksmith firm has met its duty to warn. If the user loses the log, the metalworker must open a duplicate during the visit and systematically record the reservations on their own service report before leaving the construction site.

Frequently asked questions

Can the operator refuse to keep the physical maintenance log on site?

No. The installation log must remain immediately available to the inspection bodies and maintenance technicians, either in the control cabinet or with the building caretaker. If the property manager requires exclusively digital filing, a dated and signed paper copy of the intervention must still remain accessible in the technical cabinet to ensure traceability during an emergency repair.

What should be done if the presence sensors are torn off in an act of vandalism?

The locksmith must disengage the motor unit and lock out the installation in manual mode, or block it mechanically if the leaf risks coming off its track. The automatic drive must not be re-energised until the sensing edges and photoelectric barriers have been replaced and checked with a standardised test piece, all recorded in the technical log.

What maintenance interval should be applied to a high-traffic shared access?

For a shared garage door or a sliding gate of a building subject to intensive use, the minimum maintenance interval is two visits per year, i.e. a six-month interval. In heavily used industrial settings or those exposed to severe weather, the manufacturers' requirements and the SN EN standards recommend up to four preventive visits per year.

Who is responsible if an accident occurs between two periodic maintenance visits?

If the locksmith proves, through the log handed to the operator, that the detection test was successful at the last visit and that no mechanical drift was visible, the locksmith's liability is excluded. The burden then falls on the operator, who is required to monitor the visible condition of the structure, prevent its use if a warning arises and order the necessary repairs under the Code of Obligations (CO).

Texts and standards cited

  • SN ENHarmonised European standards applied in Switzerland for industrial, commercial and garage doors and gates (requirements for mechanical safety and detection of impact forces).
  • OMach, RS 819.14Machinery Safety Ordinance governing the placing on the market and the safety condition of automated installations treated as machines.
  • COCode of Obligations (CO) governing the liability of the owner of a structure and the contractual duties relating to the maintenance of technical installations.

In the same section