Key takeaways
- The municipal planning regulations set the maximum permitted height for each type of fence on a plot.
- An opaque or very tall fence generally requires an exemption or a formal municipal authorisation application.
- Having an official surveyor locate the cadastral boundary markers guarantees the precise alignment of the exterior metalwork.
- A written agreement countersigned by the neighbouring owner protects the workshop from any subsequent costly demolition order.
Checking the permitted height and the municipal administrative procedure
Installing a metalwork fence cannot be improvised on the sole basis of the client's sketch. In French-speaking Switzerland, each municipality applies its own building and building-police regulations, modelled on cantonal law and the spatial planning act. The rules almost always distinguish open fences — such as welded mesh panels or vertical bar railings — from solid fences made of steel sheets, aluminium privacy screens or screening slats. The standard height tolerated without a public notice procedure generally ranges between 1.00 metre and 1.25 metres on the street or public-space boundary, to guarantee visibility at vehicle exits, and frequently rises to 1.80 metres or 2.00 metres on a side boundary between private properties.
| Type of enclosure | Degree of transparency | Usual indicative height | Typical administrative procedure |
|---|---|---|---|
| Wire mesh or welded mesh fence | Open (more than 70% void) | Up to 1.20 m on the street frontage | Exemption or notification of works without public notice |
| Powder-coated metal bar railing | Open (standard clear spacing) | Up to 1.50 m or 1.80 m between neighbours | Municipal prior notification procedure |
| Solid sheet or cassette palisade | Opaque (total privacy screen) | From 1.20 m or higher depending on the zone | Building permit with public notice |
| Fence on an existing masonry low wall | Mixed (solid at the base, open above) | Total cumulative height from the ground | Formal application with boundary-sharing agreement |
The workshop manager or foreman must refuse to start fabrication in the workshop as long as the municipal exemption or formal authorisation has not been placed in the fabrication file. If the client states orally that they have the go-ahead from their local administration, the metalwork company puts in writing that execution starts under the client's sole legal responsibility. Under the rules of the SIA 118 standard, the contractor nevertheless remains subject to its duty to inform if it finds that a requested height of 2.20 metres in opaque sheet manifestly violates the limits permitted by the local neighbourhood plan.
Marking out the line and securing the written boundary-sharing agreement
A metal fence built with tubular posts anchored in concrete footings tolerates no approximation in alignment. Two legal configurations govern the line under the Swiss Civil Code (CC): private siting and shared (party) siting. With private siting, the entire structure — post shaft, anchor plate, metal panels and the overhang of the buried foundation footings — must imperatively lie inside the boundary line, on the client's side. Too many metalworkers make the mistake of aligning the outer face of the post with the cadastral boundary, thus leaving the concrete base encroaching ten to fifteen centimetres into the subsoil of the neighbouring plot.
- Physical search for the cadastral markersUncover with a shovel the granite marker heads, iron pins or survey nails sealed at the corners of the plot. Never rely on an old slack wire fence, an existing hedge or a cement garden kerb to mark the property boundary.
- Check by an official surveyorIf a marker is missing or shows visible loosening following earlier earthworks, immediately notify the client of the halt to setting out. Only a licensed surveying engineer is authorised to re-establish the legal cadastral point.
- Signing the boundary-sharing agreementWhen the project places the axis of the bar railing exactly on the dividing boundary, have both adjoining owners sign beforehand a written agreement specifying the sharing of the axis, the bearing of maintenance costs and agreement on the type of metalwork chosen.
- Joint validation of the staking-outStretch a steel line between the recognised markers, mark out the alignment of the core-drilling holes or footing excavations, and have the joint staking-out record initialled on site before starting any auger or concrete breaker.
Setting out footings and managing steps: the trap of buried bases
Installing a bar fence or welded mesh on a plot boundary is not simply a matter of aligning tubular posts on a theoretical cadastral line. For the building metalworker, the work includes all the constructional elements: posts, fixing plates, threaded anchor rods, but also the cast concrete foundation footings. Under the principles of the Swiss Civil Code (CC) governing land ownership, the volume of the subsoil belongs to the owner of the plot in the same way as the airspace. Pouring a concrete block that projects ten centimetres below the surface on the neighbour's side is a violation of property, exactly as a metal panel overhanging their land would be.
When the work is designed as private, the entire structure must fit inside the client's property. This requires shifting the post axis inward to compensate for the width of the anchor footings, or adopting asymmetric metal plates welded with off-centre chemical anchors. If the fence follows a natural slope, the regulatory height set by the municipal building regulations is almost systematically assessed from the pre-existing natural ground, and not from freshly levelled backfill. On steeply sloping ground, building successive horizontal steps requires rigorous layout planning: the high point of each metal bay must at no place exceed the maximum envelope tolerated without a public notice procedure.
| Configuration | Position of the metal axis | Concrete foundation footing | Legal status of the work |
|---|---|---|---|
| Strictly private fence | Set back from the boundary (by half the post width) | Offset inward or asymmetric base | Exclusive ownership and maintenance by the client |
| Party fence on the boundary | Bar railing axis exactly on the plot line | Centred straddling both plots | Co-owned by the two neighbours, costs shared by agreement |
| Installation on a shared retaining wall | Axis defined by the top of the wall according to the agreement | Chemical anchoring or core drilling into the wall coping | Ancillary work tied to the status of the dividing wall |
Boundary-sharing agreement protocol and validation of the line before drilling
The municipal building authorisation or the exemption from public notice does not settle the question of civil rights between neighbours. Even with an official exemption from the building police for a gate one metre fifty high, siting a metal work straddling the boundary requires a boundary-sharing agreement countersigned by the neighbouring owner. If the height exceeds the ceiling permitted by the municipal planning regulations, a building authorisation procedure under the spatial planning act becomes unavoidable, involving the filing of the execution plans and formal notification of the neighbours by official publication or personal notice.
- Visual check of the cadastral markersLocate the official granite markers or metal pegs with the client. If a marker cannot be found, has been dug up or is uncertain, require an official surveyor to attend before any marking out.
- Stretching the line and marking the axisStretch a marking line between the boundary reference points. Mark the metal axis and the outer overall dimension of the flat bars or tubular posts with intermediate setting-out pegs.
- Joint meeting and signing of the planOrganise the on-site visit with the client and the adjoining neighbour. Have a dimensioned execution plan initialled that explicitly states the centre spacing, the finished height and the exact position of the footings.
- Starting cutting and excavationsStart the excavations and the fabrication of the modules in the workshop only after receiving the signed document. Record the layout with dated photographs before the concrete is poured.
If an offset is found during erection, the site manager stops progress. Adjusting a rigid metal fence after the anchoring mortars have hardened is a costly operation: the anchored posts must be cut off, the anchor bars core-drilled out and the footings excavated with a mechanical digger. When the neighbour rejects the siting agreed verbally, only a detailed written agreement protects the metalwork company and demonstrates compliance with the recognised rules of the trade.
Siting dispute or exceeding the permitted envelope: what to do in case of a challenge
When a neighbour challenges the alignment or when a team check reveals a real encroachment, even of a few centimetres beyond the plot, the site manager suspends the fixing of the bays. Continuing to bolt panels onto disputed posts worsens the situation and multiplies intervention costs. The metalworker notifies the client in writing without delay, in accordance with the duty to notify provided for by the SIA 118 standard and the Code of Obligations (CO) for defects in the ground. Without verified surveyor reference points or a written boundary-sharing agreement, the company risks having to redo the work entirely if the error comes from its own marking out.
- Joint inspection record and freezing of the construction siteStop the anchoring and summon the client with the staking-out plans. Take overall photographs and measure the deviations from the certified fixed reference points to record the factual situation.
- Examining regularisation solutionsExamine with the client whether an encroachment agreement or a boundary-sharing easement negotiated with the neighbour can regularise the existing work, thus avoiding costly demolition for a simple alignment discrepancy.
- Technical dismantling and setting backIf the compromise fails, remove the metal frames, core out the concrete footings beyond the boundary and reinstall the metal posts with a safe setback of three to five centimetres inside the property.
When the error concerns exceeding the envelope imposed by the municipal regulations, the administrative sanction is just as strict. The spatial planning act makes the installation of fixed works subject to compliance with zoning requirements. The municipal authority refuses to grant a retrospective derogation for an opaque gate or a bar railing that is too high and would deprive the neighbourhood of visibility or light. The metalwork workshop must then redo each module: cutting the posts, adapting the connecting rails and redoing the anticorrosion treatment before reinstallation below the maximum legal height.
Frequently asked questions
What should you do if a surveyor's marker cannot be found when installing the fence?
In the absence of a visible marker, it is strictly inadvisable to extrapolate the alignment from an old low wall, a pavement kerb or an embankment. The company must suspend the setting out and require the client to have a licensed surveyor re-establish the official boundary points. Installing a fence by estimate directly engages the metalworker's liability if the gate projects onto public land or the neighbouring plot, resulting in complete removal costs.
Can an existing hedge serve as a reference for the installation axis?
A hedge is never a reliable legal plot boundary. The branches thicken over the years and the base of the shrubs was often planted with a poorly defined setback from the real cadastral boundary. Basing the alignment of metal posts on the axis of the trunks almost always leads to encroachment onto the neighbour's land. Only the cadastral plan and the physical markers are authoritative before starting any drilling.
Can the neighbouring owner demand the demolition of a concrete footing that projects underground?
Yes. Land ownership extends into the subsoil. If the foundation footings poured for the fence posts go beyond the vertical of the cadastral boundary, the neighbour suffers an unlawful interference with their property. Even if the above-ground bar railing respects the boundary, the neighbour is entitled to refuse this buried base and to demand its mechanical removal or complete extraction at the exclusive expense of the person who ordered or carried out the installation.
Is the neighbour's oral agreement allowing installation on the shared boundary sufficient?
A purely verbal agreement has no evidential value in the event of a later dispute. If the neighbouring plot changes owner or if relations deteriorate, the metalworker and their client are left defenceless. The agreement for a fence set straddling the shared boundary must imperatively be recorded in a written and signed document, specifying the exact siting axis, the allocation of costs and the maintenance arrangements for both faces of the metal panel.
Texts and standards cited
- norme SIA 118General conditions for the execution of construction works