Skip to content
Website
🧱 CFC 274On-site welding, corrosion protection and safetyChapter 4 of 10 in the section

Assessing a weld: undercut, lack of penetration, porosity and rework

On a construction site installing guardrails or light staircases, the metalworker validates the mechanical strength of a joint by direct visual inspection. This guide details the instrument-free detection of the four major defects: undercut, lack of penetration, porosity and inclusions. You will learn to isolate the only geometric defect admissible for simple rework and to carry out the full repairs essential to guarantee the safety of persons.

Key takeaways

  • A side undercut weakens the cross-section of the post and is eliminated by a carefully ground build-up.
  • Lack of penetration condemns the joint and requires complete gouging down to the sound root.
  • Surface porosity reveals contaminated gas or soiled metal, requiring total removal.
  • Careful edge preparation with a clean bevel guarantees a weld pool free of structural defects.

Spotting the four critical bead defects with the naked eye on site

On finishing work construction sites in French-speaking Switzerland, fixing guardrail base plates, butt-joining handrails and connecting light stringers call for arc welding with coated electrodes or semi-automatic gasless flux-cored wire welding. Without workshop non-destructive testing equipment, the metalworker's eye is the first inspection barrier. Four geometric and metallurgical defects are obvious to an experienced practitioner: undercut at the bead edge, lack of penetration at the root, clusters of blowholes on the surface and cold lap. These anomalies drastically reduce the resistance to dynamic impacts required by safety standards for guardrails.

Visual diagnosis of the four major defects in light metalwork
Visible defectAppearance to the naked eyeFrequent causeMechanical consequence
Undercut (bite)Continuous groove or hollow notch running along the toe of the bead.Excessive travel speed, current too high or unsuitable torch angle.Critical notch effect initiating rupture under horizontal load.
Lack of penetrationIncomplete throat, gap visible under the joint, no fusion at the root.No root gap between parts, root face too thick or insufficient current.Partial connection that fails suddenly when the handrail is pushed.
Porosity / BlowholesSmall clustered craters, open pinholes or spongy surface appearance.Presence of moisture, mill scale, burnt paint or a draught sweeping away the gas.Reduced density of the steel and early site of stress corrosion.
Cold lap / Lack of fusionWeld bead simply laid on the base metal without proper wetting.Weld pool too cold, arc too long or deposit on unground mill-scaled steel.Bead breaks away under stress with no resistance, clean separation of bead and base.
Weld undercut
Longitudinal depression cut into the base metal along the edge of the weld bead, resulting from melting not filled by filler metal. It is a dangerous geometric trap that reduces the nominal thickness of the tube or flat bar.

Undercut and cold lap are distinguished by the angle of blend: undercut hollows out the parent material, whereas cold lap creates an abrupt ridge that overlaps the base metal without fusing into it. On a guardrail subjected to the required horizontal loads, lack of penetration at the foot of a hollow-section post makes the work unfit for its purpose. Visual inspection must always be carried out after the slag has been fully chipped off and the weld vigorously wire-brushed, as the slag film frequently conceals cracks and poorly filled end craters.

Correcting course: local rework by build-up or full repair at the root

Of these four anomalies, only one allows repair without completely demolishing the joint: undercut. As a shortfall of filler metal at the surface without affecting the sound root, it can be reworked locally by controlled build-up. Conversely, lack of penetration, clusters of porosity and cold lap require complete mechanical removal of the affected zone, because gas pockets or internal cracks irreversibly weaken the core of the connection.

  1. Initial mechanical cleaningCarefully chip off the coating slag with the chipping hammer and brush with a stainless steel brush to expose the defect completely.
  2. Reworking a localised undercutLightly grind the sharp edge to form a gentle key-in recess. Reduce the welding current by ten per cent, then deposit a thin build-up bead, making sure to melt both edges without hollowing out the base again.
  3. Full repair of a lack of penetrationSurface filling is prohibited. Cut or gouge out the entire defective bead with the angle grinder until the sound metal of both parts to be joined is reached.
  4. New edge preparationOpen a 60-degree V-bevel for thicknesses above three millimetres. Provide a root gap of two millimetres using a gauge to allow the weld pool to pass fully through.
  5. Rebuilding the jointRedo the full penetration pass, remove residual mill scale, then grind the bead to the required profile without hollowing out the tube walls.

The success of a weld on site depends above all on edge preparation. On ordinary structural steel sections, surface rust, cutting oil and primer paint residues must be stripped off for at least twenty millimetres on each side of the joint. A screen against gusts of air is essential when using shielding gas, as the slightest draught blows away the protective gas shield and causes through-porosity to appear immediately.

Edge preparation and fit-up: eliminating the causes of undercut and lack of fusion

On a light metalwork or guardrail installation construction site, lack of penetration and undercut do not result solely from an unsuitable travel speed or incorrect welding current. These visible anomalies almost always originate in poor fit-up of the sections or an improvised joint geometry. Failing to open bevels on flat bars or hollow-section walls blocks the progress of the weld pool to the root, while an irregular gap forces the welder to weave excessively, which immediately hollows out the edges of the part without depositing enough filler metal.

Mechanical edge preparation requires grinding back to bright metal for at least twenty millimetres on each side of the joint. Mill scale, primer paint residues and traces of zinc from prior galvanising directly contaminate the electric arc. These contaminants cause arc blow, generate adherent spatter and form instant gas porosity by trapping hydrogen or nitrogen in the liquid pool. Grinding a regular bevel allows the metalworker to stabilise arc height, avoid undercutting of the edges and ensure a continuous bond.

Edge machining parameters and associated risks in finishing work metalwork
Structural elementSteel thicknessRequired geometric preparationMajor defect if neglected
Tubular handrail1.5 to 2.5 mmSquare cut, deburred, tight fit-up with no gapCollapse of the pool or perforating edge undercut
Guardrail post (square tube)3.0 to 4.0 mm60° V-bevel, 1 mm root face, 1.5 mm gapLack of penetration at the root of the section
Floor fixing base plate (flat bar)6.0 to 10.0 mm60° V-bevel, 1.5 mm root face, 2.5 mm gapSide cold lap and massive slag inclusion
Vertical balusters (solid bar)12 to 16 mmDouble-sided bevelling or fit-up chamferingCentral lack of fusion weakening the connection

On-site decision: local build-up rework or full bead repair

During the visual acceptance inspection, the site manager and the foreman must distinguish a correctable surface defect from a disqualifying structural non-conformity. Rework by simple build-up is permitted only where the integrity of the root is guaranteed. A clean side undercut, with no underlying crack, may be filled after careful scaling. Conversely, lack of penetration or aligned porosity signals an internal flaw: the bead must be opened completely down to sound metal to eliminate the potential rupture plane.

  1. Marking out and chipping the defectClean the bead with a stainless steel wire brush to remove all slag and scale. Visually locate the start of the undercut or the porous crater. Mark out the defective zone, allowing an extra purge length of ten millimetres on each side of the visible anomaly.
  2. Mechanical grinding outUsing an angle grinder fitted with a grinding disc of at least four millimetres thickness or a carbide burr, cut a progressive flared U-shaped groove. For a lack of penetration, the cut must absolutely reach the opposite face or the bottom of the original bevel without leaving any unfused zone.
  3. Checking the purge and degreasingVisually check that there are absolutely no cracks, residual blowholes or traces of slag inclusions in the groove. Clean the groove with a dry solvent to remove abrasive dust and loose metal particles that would contaminate the repair.
  4. Controlled build-up and blendingRe-melt the root pass if the opening has gone through the thickness, then deposit the filler pass while keeping a short arc. Make sure to melt the groove edges without creating new fit-up undercuts. Finish with gentle flush grinding level with the sections.

Any bead showing transverse or longitudinal cracks tolerates no surface build-up: the complete assembly must be cut out, the abutting surfaces ground back to bright metal and the elements realigned to the assembly tolerances of the work. A non-through weld on a safety element such as a protective rail is a serious non-conformity that directly engages the civil and professional liability of the executing company.

Repair protocol and handling rejections during visual inspection

On a metalwork construction site, discovering a critical defect during visual inspection immediately halts installation of the work. Whether it is a pronounced undercut cutting into the thickness of a guardrail tube or through-porosity on a starter plate, the foreman must decide between spot rework and complete removal of the connection. In accordance with the execution rules of the contract for work and the requirements of standard SIA 118, a joint whose soundness or appearance is compromised cannot be concealed by simple filling or a coat of liquid zinc.

  1. Mechanical removal of the defectFor localised porosity or lack of penetration, the defective zone must be fully purged by grinding with a grinding disc or by milling down to sound metal, without damaging the adjacent walls of the section.
  2. Restoring the bevelAfter removing the altered metal, a careful repair requires edge preparation identical to the original state: restoring an open V-bevel of between forty-five and sixty degrees and maintaining a millimetre-accurate fit-up gap.
  3. Depositing the new bead and thermal purgeThe repair pass is carried out using a controlled current to guarantee fusion without collapsing the root. Slag and spatter are carefully brushed off before any forced cooling.

Each repair operation locally alters the heat treatment of the assembly and damages the original surface protection. The foreman records the intervention in the daily report and has the repair visually validated before authorising the anti-corrosion touch-up defined for the construction site.

Frequently asked questions

Can a weld undercut be hidden with a simple build-up bead?

No. Building up directly over an undercut almost certainly traps slag, mill scale or gas inclusions along the bite line. The professional method is first to dress the transition by light longitudinal grinding to create a clean groove free of oxides. The filler pass can then be deposited, adjusting the travel speed to fill the hollow without producing excess thickness.

How should surface-breaking porosity discovered during brushing be treated?

Porosity signals gas trapped during solidification, caused by a draught, rust, moisture or residual paint. A porous weld loses its tightness and mechanical cohesion. The whole contaminated zone must be ground out down to the bottom of the crater using an angle grinder or a pneumatic chisel. After dust removal and degreasing of the bare metal, a new repair bead is made sheltered from the wind.

Why does lack of penetration always require a complete repair?

Lack of penetration leaves a continuous internal crack between the deposited metal and the root of the section, invisible from the surface. On a guardrail rail or a light staircase bracket, this crack initiation fails suddenly under cyclic loading. As the defect cannot be resolved by a surface deposit, it is essential to cut out the connection, re-machine the preparation bevels and redo the joint right through.

What edge preparation should be applied on site after removing a defective bead?

After removing the rejected bead, the steel section must be ground bright for at least fifteen millimetres on each side of the future joint. Traces of oxidation, mill scale and workshop primer are removed with an abrasive wheel. A regular root gap of one to two millimetres is provided to allow the weld pool to pass through. The alignment of the elements is held by clamps or temporary tack welds.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work concerning rights and obligations in the event of defective work and duties of rectification

In the same section