🧱 CFC 274On-site welding, corrosion protection and safetyChapter 8 of 10 in the section

Carrying steel: weight, sharp edges, gloves and slinging a long piece

Handling a four-metre metalwork bay exposes the fitter to three simultaneous factors: the mass of steel, tipping through leverage and the sharpness of raw or galvanised sections. This chapter guides you step by step to make manual carrying safe, choose the right cut-resistant gloves and achieve a stable two-point sling without taking risks at an open edge.

Key takeaways

  • A long piece shifts its centre of inertia abruptly at the slightest uncontrolled pivoting movement.
  • Workshop burrs and zinc runs require cut-resistant gloves with a reinforced palm.
  • Slinging at two anchor points with protective sleeves eliminates any risk of tipping in the air.
  • Guiding with a tag line prohibits placing the hands directly under a suspended metal load.

Controlling overhang and neutralising the risk of cuts during manual carrying

A straight steel guardrail four metres long commonly weighs between sixty and ninety kilograms, depending on the thickness of the posts and the type of balustrading. This mass can be handled by two fitters on a clear floor, but its elongated geometry radically changes the physical stresses. The centre of gravity lies at the geometric middle of the piece, whereas the operators' hands are often placed towards the outer thirds or at the ends in order to pass through a glazed opening. As soon as one of the fitters speeds up or pivots, the inertia of the steel creates a lever arm that multiplies the force felt at the wrists and lumbar vertebrae.

The contact surface is the second immediate hazard. Steel sections cut in the metalwork workshop have fresh edges, sometimes sheared or deburred too quickly before treatment. Even after hot-dip galvanising, solidified drops, sharp runs or slag deposits create formidable cutting edges. If the piece slides under its own weight in the worker's palm, the sheet acts like a continuous razor blade.

  • Rigorous deburring in the workshop before transport: systematic chamfering of laser cuts and end drillings with an angle grinder or a flat file.
  • Mandatory wearing of mechanical-risk protective gloves with a high cut-resistance level (slash) and a gripping nitrile or polyurethane coating.
  • Basic leather handling gloves are prohibited: their thin split leather soaks up drawing oil and tears instantly under the pressure of a zinc burr.
  • Strict verbal coordination: the pair announces every change of grip, every stair step and every obstacle crossing before lifting the frame.

Manual handling of a long metal piece must be planned to avoid any prolonged carrying at arm's length. As soon as the access route includes narrow ramps or several floors without a materials hoist, the bay must be split at the design stage into sleeved or bolted sub-assemblies assembled on the construction site, limiting individual lengths and the unit weight to below forty kilograms.

Achieving a two-point sling and guiding the suspended load

As soon as access from the inside becomes impossible or too arduous, a tower crane, a truck-mounted crane or an electric hoist must be used. Slinging at a single point with a central choke is strictly prohibited for long metalwork pieces. Suspended only by its middle, a guardrail tips at the slightest gust of wind or tilts violently if a heavier fixing plate shifts the centre of mass off the vertical axis of the hook.

Two-leg spread slinging
Lifting arrangement using two independent textile slings or a two-leg sling attached to separate points of the guardrail, ensuring the horizontal stability of the piece and preventing any uncontrolled rotation in the vertical plane.
  1. Symmetrical positioning of the attachment pointsPlace the two textile choker or basket slings at an equal distance from the centre of gravity, ideally at the vertical load-bearing posts, to prevent the rails from sliding sideways along the handrail.
  2. Fitting protective corner piecesPlace thick polyurethane sleeves or magnetic corner protectors between the steel and the textile fibre. The dead weight of the piece on the edge of a plate can cut a webbing sling clean through under lifting tension.
  3. Checking the angle at the top of the spreaderMaintain a moderate opening angle between the two legs under the crane hook. An angle that is too closed or too open increases the tension in each sling exponentially and risks crushing the structure through lateral buckling.
  4. Attaching independent tag linesTie at least one non-conductive tag line to one end of the bay before lifting the load off the delivery platform.

The final placing onto the starter bars is carried out at minimum lowering speed. The crane operator only releases the cable tension after temporary fixing by safety bolting or by clamping with metalworker's clamps. This temporary mechanical wedging guarantees that the long piece will not tip into the void when the shackles and hooks are released by hand.

Coordination of the pair and managing imbalance in narrow passages

A four-metre balustraded guardrail commonly weighs between sixty and ninety kilograms, depending on the thickness of the posts and the presence of intermediate rails. Beyond this gross mass, the main danger lies in the geometry of the piece: the centre of gravity is not in line with the handrails but drops towards the lower third of the grille. When moved by two fitters, the slightest step mismatch or an unexpected change of angle turns the piece into a destabilising lever arm. If the rear carrier stumbles or hesitates, the entire torsional moment is transferred to the forearms of the front carrier, risking tearing the grip loose or pulling the pair to the ground.

To neutralise this inertia, manual carrying of a large assembly cannot be improvised. The fitters establish rigorous coordination even before lifting the transport trestle. The Ordinance on Construction Work requires safety to be ensured at workstations and on traffic routes: this means surveying the route beforehand, clearing trestles or technical ducts obstructing the galleries, and prohibiting passage over unsecured slab openings. On a tight bend or in a stairwell, the fitter at the front guides the trajectory while the rear fitter sets the pace of progress and announces each threshold crossing.

  1. 1. Surveying the routeCheck the clearance in the openings, the absence of trailing cables and the stability of the access decking up to the installation point.
  2. 2. Securing the hand gripsGrip the intermediate vertical posts rather than the handrail in order to block the pendulum tipping of the piece under its own weight.
  3. 3. Synchronising the liftLift the piece with symmetrical support on the thighs on the guide's formal command, keeping the load as close to the trunk as possible.
  4. 4. Coordinated intermediate set-downRest the element on timber wedges at mid-route as soon as the grip weakens, without abruptly releasing the effort on one side only.

Sharp edges, galvanising burrs and protection of lifting gear

Handling a guardrail combines the danger of weight with that of permanent mechanical aggressiveness towards the hands and the lifting accessories. Machined flats, laser-cut sections and sharp plate corners have extremely cutting edges. When the work comes back from hot-dip galvanising, the phenomenon is aggravated by the formation of solidified drip drops and sharp iron-zinc alloy burrs at the vent holes. These roughnesses cut through the leather of standard gloves in a single slip and instantly slice the polyester fibres of lifting slings as soon as the crane puts them under tension.

Choosing protective equipment according to handling stresses
Item concernedMain riskRecommended technical deviceWorkshop and construction site precautions
Raw handrails and postsCuts from fresh machining edges or laser burrsHigh-density knitted cut-resistant mechanical protection glovesSystematic deburring of edges in the workshop before departure to site
Galvanised frames and platesSkin tearing from zinc burrs and drip pointsReinforced gloves with grain-leather palm and waterproof nitrile coatingFiling or grinding flush of zinc points at the hanging holes
Textile lifting slingsSevering of fibres at the choke or bearing pointThick tightly woven textile sleeves or elastomer sheathsProtection must be positioned directly opposite the edge
Lower anchor platesCrushing and dragging on rough slab or swept concreteSafety boots or shoes with puncture-resistant sole and rigid toe capGuiding the suspended load exclusively from a distance by means of a rope

During mechanical lifting with two-point slinging, the spacing of the slings must balance the loads perfectly without inducing an excessive angle at the top, which would multiply the tension in the legs. Any contact of a bare sling with a perforated plate or the underside of a crossbar is strictly prohibited. The building metalworker visually inspects the condition of the accessories before every manoeuvre: any sling showing the start of a transverse cut, visible core threads or burn marks must be withdrawn from service immediately and destroyed to prevent its reuse on the construction site.

Emergency response: reflexes and stopping the manoeuvre in case of slippage or jamming

When a four-metre guardrail bay escapes the pair or swings under the crane, the overhang turns an ordinary mass of eighty to one hundred kilos into a brutal mechanical trap. The spontaneous reflex of trying to hold the piece back with arm strength or by acting as a counterweight with the torso causes the most severe injuries in the trade: severed flexor tendons on a galvanising burr, bones trapped against the slab, or the fitter being dragged towards the open edge.

  1. Voice alert and releasing the loadShout a short, recognisable order to stop the pair's manoeuvre dead or freeze the winch. Release the grip and move away perpendicular to the line of fall to avoid the swinging of the metal element.
  2. Assessing bodily injuriesCheck the hands and limbs. In the case of a deep cut from a raw edge, do not remove the glove abruptly if a metal sliver is stuck to it; apply direct pressure and alert the emergency services according to the construction site's organisation.
  3. Mechanical stabilisation of the elementImmobilise the fallen or misaligned panel using bevelled hardwood wedges. Never leave a guardrail resting precariously on its welded plates, otherwise the structure may twist or the concrete slab edge may be damaged.
  4. Immediate neutralisation of the lifting gearIsolate and cut up without delay any textile sling that has been pinched directly or rubbed on an unprotected sharp edge. Any nicked or frayed lifting equipment must be scrapped without technical compromise.

The Ordinance on Construction Work requires any danger of collapse or falling elements to be neutralised as soon as a malfunction appears at the workstation. Before authorising the resumption of installation, the foreman checks the straightness of the steel frame, requires the zinc burrs responsible for the incident to be deburred with a grinder, has the fitters equipped with new cut-resistant gloves of the highest class and recalculates the spacing of the two-point slings to eliminate any parasitic torsional moment.

Frequently asked questions

What level of protection should be chosen for metalwork handling gloves?

To move raw or galvanised guardrails, the tradesperson must demand gloves meeting reinforced mechanical requirements, showing maximum resistance to slash cuts and excellent puncture resistance. Models combining a high-density polyethylene knit with a nitrile coating on the palm provide the essential grip on greasy sections while stopping metal burrs. Thin leather gloves are to be avoided for these manoeuvres.

Why prohibit lifting a four-metre guardrail from a single central point?

Lifting from a single point creates a critically unstable balance. As soon as it leaves the pallet, the guardrail tips at the slightest breath of air or contact with an obstacle, its centre of gravity oscillating dangerously. This configuration turns the ends of the frame into lever arms capable of throwing a fitter or striking a scaffolding violently. Slinging must imperatively have two spaced points to control horizontality and eliminate rolling during the aerial movement.

How to react to sharp galvanising burrs during installation on site?

Zinc runs and points resulting from hot-dip galvanising are a major source of cutting accidents. Manual handling of a non-deburred piece must never be forced. Before lifting the panel, the fitter must systematically grind off the sharp excess thicknesses with a bastard file or a flap disc on a portable angle grinder, then apply liquid zinc anti-corrosion protection to preserve the integrity of the coating without compromising safety.

What protection should be placed between the textile sling and the sharp edges of the steel?

Polyester lifting slings are easily sheared under load when they rest directly on the sharp corners of a rail or a metal post. The fitter must equip each sling with reinforced polyurethane protective sleeves or articulated magnetic corner protectors. These accessories absorb the linear pressure, prevent the textile fibres from being cut when tension is applied and ensure that the guardrail does not slide sideways during its transfer to the balcony.

Texts and standards cited

  • OTConstRequirements on the safety and health protection of workers in construction work