🧱 CFC 274Balustrades: height, infill and complianceChapter 5 of 10 in the section

On a staircase: height measured at the stair nosing, handrail and continuity

Measuring a raking guardrail at the middle of the tread instead of on the vertical through the stair nosing creates an immediate non-conformity along the whole flight. This chapter details the exact measuring method under SIA 358, the layout of the connections between raking section and landing, and the handrail sections that ensure a continuous grip without pinch points.

Key takeaways

  • The statutory height is taken strictly on the vertical passing through the edge of the stair nosing.
  • Measuring at the middle of the tread lowers the actual top rail and makes the work non-compliant.
  • The junction between raking section and landing requires a continuous transition to avoid any break in support or height.
  • The handrail must offer a closed, graspable profile with no sharp edge and no interruption of guidance.

The statutory dimension is taken exactly on the vertical through the stair nosing

On a raking staircase, the most frequent error when taking dimensions or during the final inspection is to place the tape at the centre of the tread or perpendicular to the walking line. SIA 358 requires a minimum finished protection height measured along a virtual plumb line running from the front edge of the step to the top face of the handrail. This minimum value is 900 mm for stair flights, compared with the 1000 mm required in landing or horizontal circulation areas.

Effect of the measuring point on the actual height recorded (slope 32°, step 175/280 mm)
Inspection locationMeasuring axis usedActual height at nosingSIA 358 compliance
Vertical through the stair nosingTrue vertical (plumb line)900 mmCompliant
Middle of the tread (14 cm set back)True vertical812 mmNon-compliant (88 mm short)
Vertical through the stair nosingPerpendicular to the slope763 mmNon-compliant (137 mm short)

For workshop fabrication as well as for the template on the construction site, the metalworker must lay out the theoretical walking line joining all the finished stair nosings. The vertical posts must be calculated taking into account the thickness of the final finish (tiles, flowing screed or solid timber). Any side fixing on the stringer requires this finished dimension to be transferred accurately, otherwise the whole raking section risks being rejected at acceptance of the works.

Ensuring geometric continuity at the landing and graspability of the handrail

The critical point of stair metalwork is the connection between the raking section at 900 mm and the floor landing at 1000 mm. SIA 358 prohibits abrupt steps that create gaps through which a child could pass or that interrupt manual guidance. This 100 mm difference in level requires the geometry of the gooseneck or connecting bend to be planned from the last riser.

  1. Extension of the slope lineKeep the inclined axis of the handrail up to the vertical through the nosing of the arrival landing before starting the change of direction.
  2. Change of height by offset bendMake a bent elbow or a welded and ground mitre to raise the top edge from 900 mm to 1000 mm without reducing the clear gap under the rail.
  3. Alignment with the horizontal guardrailConnect the rail to the balusters or glazing of the landing while maintaining the maximum statutory spacing, without creating a ladder effect.

Handrail supports in the form of plates welded under the tube ensure a smooth path for the palm. Wall brackets passing through from the side are to be avoided on main routes because they force the user to let go at each fixing point. At the ends of the flight, the profile must return to the wall or turn down towards the floor to eliminate the risk of a garment or strap catching.

Geometric impact of the measuring point on the slope line

The conformity of a raking guardrail under SIA 358 depends on the exact definition of the height reference point. When taking dimensions or modelling in the workshop, confusing the vertical through the front edge of the step with a measurement taken at the middle of the tread or perpendicular to the stringer causes an immediate geometric drift. On a standard staircase with a slope of about 30° to 37°, the distance taken perpendicular to the raking section is clearly less than the required vertical height. Likewise, if the take-off transfers the height to the face of the riser or to the centre of the step, the height offset easily reaches 15 to 25 mm depending on the inclination. Such an error carried over a whole flight lowers the top rail below the legal threshold of interception.

The fabrication layout must incorporate the actual nosing line, represented by the tangent joining each finished outer edge of the steps. It is from this inclined virtual line that the statutory height of 100 cm is projected strictly by plumb line. Any variation in the thickness of the step finish (natural stone, solid timber or float-finished screed) changes the position of this height anchor point. If the steps are not yet laid when the metalwork survey is carried out, the final thickness of the finishing build-up must imperatively be fixed by the site management.

Deviations found according to the measuring method on a typical step (riser 17.5 cm, tread 28 cm, inclination 32°)
Measuring methodHeight measured (mm)Deviation from the verticalSIA 358 compliance
Strict vertical at the stair nosing10000 mm (reference)Compliant
Vertical at the middle of the tread912-88 mmNon-compliant (critical defect)
Perpendicular to the walking line848-152 mmNon-compliant (immediate rejection)
Vertical at the back of the step825-175 mmNon-compliant (critical defect)

Geometric continuity between raking section and landing, and graspability compliance

Crossing the transition between the raking flight and the horizontal landing is the most delicate technical point in metalwork. SIA 358 requires protection without any break to avoid any snagging point or loss of balance. The handrail must provide continuous guidance along the whole path of the user. At the intersection of the two planes, the guide lines do not meet at the same height if the 100 cm dimension is applied strictly: the generatrix of the raking section arrives lower than the horizontal rail of the landing. An offset connection must then be made, or the break of the raking section must be moved beyond the last step to join the levels smoothly, without creating a constriction or pinch zone.

  1. Layout drawing of the angle connectionMark out on a workshop template the intersection of the landing line at 100 cm above the finished floor and the flight line at 100 cm at the nosing. Identify the geometric break point, which is always located on the vertical through the arrival riser.
  2. Cutting and coping of the tubesCut the mitre angles of the handrail by halving the obtuse angle of the change of slope, or bend a smooth transition elbow with a radius suited to the selected profile.
  3. End extensionExtend the handrail horizontally by at least 30 cm beyond the last stair nosing before returning the profile to the wall or towards the floor, thus ensuring support before the descent.
  4. Graspability checkCheck the section of the profile: a round tube with a diameter of between 40 and 50 mm or a flat bar of equivalent section with softened edges, while maintaining a continuous clear gap of at least 50 mm behind the profile for the fingers.

Compliance with the safety spacings also applies to the infill elements in the transition zone. When the slope levels out, the vertical balusters undergo a variation in their projected spacing on the floor. The underlying rails or glazing panels must be adjusted to prevent the passage of a 12 cm diameter test sphere, from the stair nosing to the floor of the landing.

Managing height deviations and rectifying non-conformities on site

During the acceptance inspection by the site management or the safety services, the height measurement of the raking guardrail tolerates no compromise. If the dimensions were wrongly taken in the workshop by measuring perpendicular to the walking line or at the middle of the tread, the work ends up several centimetres too low when referred to the vertical through the stair nosing. Faced with a rejection for non-conformity with SIA 358, the metalworker must immediately assess the technical room for manoeuvre before considering complete removal.

  1. Joint plumb-line surveyPlace a rigid straightedge wedged on at least three consecutive stair nosings. Measure the exact vertical distance between each step edge and the top face of the handrail using a tubular level or a plumb laser, recording the deviations step by step.
  2. Modification of sleeves and landing connectionsIf the balusters comply with the statutory spacings but the handrail is too low, dismantle the connection at the landing. Replace the transition pieces with adjustment elbows or raised end posts to restore the required height without changing the panels.
  3. Raising the handrail with spacer sleevesFor models with independent top rails, insert welded or screwed spacers under the grip supports. This intervention gains two to three centimetres while keeping a graspable, continuous handrail up to the landing.

If the infill itself presents a non-compliant vertical opening created by raising the work, the metalworker must record the situation and propose a technical addendum. Where the basic geometry of the staircase differs from the execution drawings supplied, the contractor draws up a written report for the client in order to agree on a joint adaptation of the metalwork fixings.

Frequently asked questions

Where exactly should the tape be placed when inspecting a raking guardrail for acceptance?

The tape must be set exactly at the edge of the finished stair nosing and run perfectly vertically up to the top surface of the handrail. Any oblique measurement, perpendicular to the slope of the raking section or taken at the middle of the tread, is wrong. It gives an overestimated value that hides a guardrail that is in fact too low against the safety requirements.

How can a height offset between the raking stringer and the landing slab be corrected?

The metalworker must fabricate a bent transition piece in the workshop or adjust the arrival post on the landing. The minimum height must be maintained without interruption over the last stair nosing and over the slab. To avoid an abrupt break under the user's hand, a double-mitre connection is inserted, keeping the handrail graspable over its whole length.

Can a lack of height be compensated by welding a raising piece onto the top rail?

This intervention is permitted only if the raising piece ensures a graspable handrail of appropriate section, round or oblong, clear of the posts. The assembly must show careful grinding with no sharp edge or weld spatter. In addition, the raising piece must not create a climbing foothold or a gap greater than the passage gauges defined by the Swiss safety guidelines.

What should be done if the raw concrete steps show height variations before installation?

The metalworker must demand the dimensions of the finished coverings before launching fabrication of the metal frames. If structural work deviations remain at installation, the situation must be reported to the site management by written notice of anomaly. Adjusting the anchors on irregular steps without approval risks delivering a guardrail that does not comply with the standards in force.

Texts and standards cited

  • norme SIA 358Guardrails: safety requirements for height, openings and restraint of persons