Metal staircases and handrails: the execution standard
This section is intended for metalworkers, workshop managers, foremen and finishing-work installers. It brings together the trade rules for fabricating and erecting a metal staircase that is usable, rigid and safe. From step calculation to fixing onto a concrete slab, including vibration comfort and accessibility under SIA 358, it details every critical execution point in order to avoid acceptance disputes and defects in use.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 5
63 cm
Average value of the ideal stride according to Blondel's formula (2H + G)
100 cm
Minimum guardrail height above the walking line
12 cm
Maximum spacing between vertical baluster elements
2 m
Minimum clear headroom at the vertical passage
30 cm
Minimum horizontal extension of the handrail at the ends
Scope and limits of services in metalwork
The field covered here concerns exclusively light metal staircases, accompanying handrails, integrated guardrails and industrial or private technical access falling under CFC 274. Metalwork is characterised by its function as secondary circulation, service access or interior and exterior fitting-out, without contributing to general bracing or to carrying the primary loads of the building. Heavy load-bearing structures, lattice distribution mega-beams and major trimmers in steelwork fall within the competence of steel construction (CFC 215). Likewise, reinforced-concrete cast stair flights belong to structural work (CFC 211.1), while added treads in timber joinery without a steel frame fall under CFC 273.
The metalworker bears full and sole responsibility for sizing the stringer sections, choosing the end fixings, the rigidity of the treads and the restraint devices. Under art. 365 CO, the craftsman has a duty to examine the supports provided by the structural work or the steelwork and to report without delay any obvious defects or setting-out deviations that would compromise the stability of the flight. In the event of deliberate failure to comply with the rules of the trade endangering the life or physical integrity of users during use or lifting, the criminal liability of the fabricator may be engaged within the meaning of art. 229 CP.
| Structural element | Responsible trade | Limits of services |
|---|---|---|
| Main building frame | Structural steel fabricator (CFC 215) | Carrying the overall load paths and main beams |
| Light flight, plate stringer, treads | Building metalworker (CFC 274) | Fabrication, cutting, workshop assembly and secondary bolting |
| Bearing slab and concrete trimmers | Masonry / Structural work (CFC 211.1) | Strength of the load-bearing concrete and rough openings |
| Timber tread and nosing cladding | Interior joiner (CFC 273) | Fixing of timber treads onto tapped steel angles |
| Finish painting on the construction site | Building painter (CFC 272) | Paint touch-ups after erection and grouting of the staircase |
Methodological path: from workshop drawing to on-site lifting
The success of a metal staircase rests on a logical sequence of operations in which each upstream decision directly determines the feasibility of erection. The chapters should be consulted following the chronological progress of a technical order: step calculation, dynamic stability, surface safety, durability against weather, adaptation to complex geometries, then installation on the slab and wall finishes.
- Step 1: Geometric and dynamic designChapters Q4-01 and Q4-02 lay the technical foundations. The riser-going relationship must first be locked in using Blondel's formula and absolute millimetre regularity ensured, then the steel stringers sized to rule out any unacceptable vibration resonance when walking.
- Step 2: Safety in use and weather resistanceChapters Q4-03 and Q4-04 deal with grip and water management. The metalworker selects grooved sections or gratings with drip-formed nosings, then provides the essential drainage holes before hot-dip galvanising to prevent water trapping and frost bursting.
- Step 3: Special configurations and helical layoutsChapters Q4-05 and Q4-06 address utility technical access (fixed caged ladders) and the helical spiral staircase. The latter requires a rigorous calculation of the going at the clear passage width in order to avoid the major obstacle of furniture transport.
- Step 4: Fixings, acoustic comfort and handrailsChapters Q4-07 and Q4-08 detail anchoring onto the concrete slab, shimming with non-shrink mortar, sound insulation against impact noise by means of elastomers, as well as the load transfer of wall handrail brackets according to the wall types encountered.
- Step 5: Universal accessibility and crane operationsChapters Q4-09 and Q4-10 complete the work by observing handrail extensions and the visual contrast of step nosings, then the crane lifting plan in an enclosed stairwell in strict compliance with the safety measures of the construction work ordinance.
📘 Chapters in this section 10
Geometry: step height, tread depth, comfort formula and regularity
Master Blondel's formula and strict regularity to guarantee comfort in use without missteps.
Metal stairs and handrailsThe vibrating staircase: natural frequency, a stringer that is too flexible and remedial measures
Calculate the inertia of the metal stringers in order to permanently eliminate the unpleasant springy effect underfoot.
Metal stairs and handrailsDo not slip: non-slip surface, contrasting nosing and wet grating
Select checker-plate coverings and gratings to eliminate any risk of slipping in wet conditions.
Metal stairs and handrailsOutdoor stairs: standing water, frost, corrosion of connections and drainage holes
Drain standing water and secure welded joints against frost bursting outdoors.
Metal stairs and handrailsTechnical access: caged ladder, rest landing and limits of use
Size caged ladders and intermediate landings to make technical passages at height safe.
Metal stairs and handrailsThe spiral staircase: variable tread, usable width, and the sofa that will never go up
Set out the going on the walking line and preserve the clear passage envelope.
Metal stairs and handrailsInstalling the staircase: bearings, slab tolerance, levelling shim and impact noise
Adjust the bearings on the rough slab and insert acoustic resilient pads against impact noise.
Metal stairs and handrailsWall-mounted handrail: actual support load, substrate received and brackets
Fix wall handrail base plates securely according to the actual nature of the load-bearing substrate.
Metal stairs and handrailsAccessibility: contrast of nosings, handrail extension and tactile marker
Incorporate tactile warning strips, visual contrasts and returns compliant with the accessibility standards in force.
Metal stairs and handrailsSetting up: shaft survey, lifting, slinging and exclusion zone
Organise workshop slinging and the safe entry of the flight into a narrow stairwell.