🧱 CFC 274Anchors and fixings in concreteChapter 10 of 10 in the section

Proving anchorages: anchor reference, batch, photos and record sheet per structure

As soon as a flashing, a sheet-metal base or a grouting mortar conceals the base plate of a guardrail, the exact type of anchor can no longer be verified. This chapter teaches you to build the traceability file from the moment of installation: recording the technical references, photographing the critical points and formalising the anchorage record sheet intended for acceptance with the client.

Key takeaways

  • The anchor box provides the batch number that is essential for any later check on the construction site.
  • Photographs of the fixings must absolutely be taken before the slightest cladding profile is installed.
  • The anchorage record sheet records the tightening torque applied and the actual drilling depth.
  • The technical file handed over at acceptance proves compliance without requiring destructive testing.

Recording the batch, the reference and the installation condition before cladding

On a building construction site, the installation of a guardrail or handrail frequently ends with the fitting of a cover: folded sheet-metal finish, waterproofing sleeve, water-shedding flashing or levelling mortar under the base plate. From that moment, the anchorage is invisible to site management as well as to inspectors. If a doubt arises during testing or at acceptance of the work under standard SIA 118, a company with no visual record risks having to dismantle its trim or carry out very costly destructive coring.

Collecting the evidence begins when the material is unpacked. The installer must set aside the label from the packaging of the mechanical anchors or resin cartridges. This label contains the exact commercial designation, the diameter, the effective anchorage length and the manufacturing batch number. In the event of a quality inspection or a product recall by the anchor manufacturer, only this batch number makes it possible to certify that the fixings installed on a façade match the declarations of performance supplied to the civil engineer.

  • The precise name of the anchor, its nominal diameter and its steel grade, in particular stainless steel outdoors.
  • The complete batch number printed on the cardboard box or on the label of the bonding cartridge.
  • The actual drilling depth measured at the drill's depth stop before the hole is blown out.
  • The tightening torque value prescribed by the technical data sheet and applied with a torque wrench.

Photography is the second pillar of the record. Two photos per base plate or per group of representative posts are required. The first frames the installed fixing before the washer and nut are fitted, so that the head marking of the anchor or the protrusion of the threaded rod is legible. The second shows the whole base plate fixed to the slab or balcony edge, with a tape measure placed alongside to attest the distance to the edge of the concrete.

Drawing up the anchorage record sheet and handing it over to the client

The record in a notebook is not enough: the light metalwork company must summarise this data in an anchorage record sheet for each structure. This contractual document forms the direct link between the assumptions of the installation drawings approved by the engineer and the physical execution on the concrete slab. Drawn up by the team leader or the construction manager, the sheet accompanies each guardrail run or each metal staircase assembly.

Typical structure of a self-inspection sheet for metalwork anchorage
ItemData recordedMeans of verification
IdentificationBuilding, level, drawing reference and post numberApproved execution drawing
Fixing materialAnchor type, material, length and batch numberManufacturer's label kept
InstallationDrill bit diameter, anchorage depth and cleaningDepth gauge and brush
TighteningTorque applied in newton-metresCalibrated torque wrench
ValidationFitter's name, installation date and foreman's initialsSignature on the daily report

Cleaning the drill hole is a critical point of the sheet. For expansion anchors as well as for chemical anchors, the tradesperson notes the method used, for example the cycle of compressed-air blowing and mechanical brushing. Stating in black and white that the hole was cleared of drilling dust protects the company if a fitting should show abnormal play caused by material settling under the expansion sleeve.

The handover to the client takes place at the acceptance procedures. Included in the as-built file, the anchorage record sheet is passed to site management together with the technical data sheets of the fixings, the certificates of conformity and the contact sheet of the photographs taken before cladding. This methodical approach, in line with the contractor's duties defined by the Code of Obligations (CO), defuses any later dispute about the strength of the guardrails.

The photographic record and identification of components before concealment

On a building metalwork construction site (CFC 274), the installation of a balcony guardrail, a light staircase or a handrail commonly ends with the fitting of a base-plate cover, a folded sheet-metal sleeve or the pouring of a levelling mortar. Once this architectural cladding is clipped on, screwed on or poured, the threaded rods and anchor heads become completely invisible to site management and the client. If a structural or aesthetic dispute arises at acceptance of the work or several years later during operation, the metalworker is physically unable to prove the exact nature of the anchoring without destroying the cladding element. Building up a methodical photographic file, produced at the installation front as work progresses, provides incontestable proof that the fixing carried out corresponds point by point to the execution design.

  1. Macro photograph of the anchor headFrame clearly the marking cold-stamped on the head of the metal anchor or on the end of the threaded rod, attesting the stainless steel grade or the effective anchorage length.
  2. Positioning photo with measuring scalePlace a rigid folding rule against the edge of the concrete slab and between the anchors to prove compliance with the nominal edge distance and the minimum spacing between holes.
  3. Photograph of the original packagingPhotograph, in the work area, the packaging label of the anchors or the resin cartridge used, showing the exact reference, the European Technical Assessment number and the manufacturing batch number.
  4. Overall view of the tightened base plateFrame the complete metal bracket fixed to the bare concrete before any decorative base-plate cover is fitted, showing the thread protrusion and the bearing of each thick washer.

The anchorage record sheet per structure and handover to the client

The traceability of light fixings cannot be reduced to a few disorganised photos kept on an installer's phone. Each metal structure — loggia guardrail, staircase barrier or ventilation grille — requires an individual anchorage record sheet, filled in on site by the team leader during the work. This technical document records the essential installation parameters that escape any later non-destructive visual check: the drilling diameter, the effective embedment depth in the concrete, the cleaning method by blowing and brushing, the expiry date of the resin, and the tightening torque applied with a torque tool. Signed by the fitter, the sheet formalises the compliance of each anchor before the other trades conceal the area.

Typical structure of the anchorage record sheet for a metal structure (CFC 274)
Inspection sectionMandatory data to recordAssociated tool or supporting document
Identification of the structureReference number according to the workshop drawing, building floor, exact orientation of the façade and designation of the balcony.Installation drawing approved by site management
Anchor reference and batchManufacturer's brand, precise type of mechanical or chemical anchor, nominal depth, batch number printed on the packaging.Cut-out label or clear photo of the packaging
Drilling and preparationActual diameter of the concrete drill bit, measured drilling depth, confirmation of the blowing and brushing cycle.Drilling template and supplier's data sheet
Mechanical tensioningPrescribed value and actual value of the tightening torque applied to each nut or anchor rod.Torque wrench with valid calibration certificate
Validation and sign-offsDate of the work, identity and signature of the qualified installer, initials of the team leader or the construction manager.Quality self-inspection sheet signed on the construction site

The complete handover of these sheets takes place before the release of financial guarantees and the final account. For external guardrails subject to the loads of standard SIA 358, full traceability reassures the client about the lasting stability of the guardrails under horizontal thrust forces. This documentary rigour avoids late disputes about the depth of the anchors or the quality of the steel used, while giving site management full visibility of safety elements permanently concealed under sheet-metal cladding or finishing slabs.

Handling disputes and anchorage evidence after the work is closed up

On a metalwork construction site in western Switzerland, conflict almost always arises when the sheet-metal cladding, the flashing or the finishing screed conceals the base plate without the checks having been countersigned. As soon as site management refuses to approve a measurement line or blocks an advance payment on the grounds that it cannot inspect the bonded anchor, the burden of proof falls on the metalworker. Without a file built up at the time of installation, the company risks having to remove the finishes at the installer's expense or to commission destructive diagnostics.

  1. Immediate halt of cladding and notificationIf a drill hole meets main reinforcement or if the prescribed tightening torque turns without gripping, the team stops the assembly. The team leader records the anomaly in the daily report and informs the civil engineer before any base-plate cover is fitted.
  2. Joint inspection by coring or non-destructive testingIf a photograph was forgotten before closing up, site management may require a ferroscan survey to locate the rod or require the removal of a representative sample of the metal cladding.
  3. Pull-out test campaign on siteIf the resin batch or the stainless steel grade is challenged after the fact, an accredited body or the technical supplier of the fixings carries out a direct tension test with a hydraulic jack on a test anchor or on the structure itself.
  4. Drawing up the rectification protocolAny change to the anchoring is the subject of an addendum to the original anchorage record sheet, countersigned by the engineering office before the final reinstatement of the protections and finishing sheet-metal work.

Rectifying an anchorage non-conformity demands absolute rigour. The tradesperson supplies the factory certificates for the batch of screws or chemical cartridges, the calibration records of the torque wrench used for tightening and the civil engineer's calculation note authorising the replacement drilling. This complete file of evidence makes it possible to avert rejection of the work and obtain the release of the warranty retentions.

Frequently asked questions

How should you react if site management challenges an anchor already concealed by a flashing?

Present the dated anchorage record sheet, stating the manufacturer's batch, the drilling depth and the torque applied, together with the geotagged photographs taken before the flashing was installed. If this document is missing, propose a non-destructive check with an electromagnetic detector or the careful removal of a single cladding element for a joint inspection.

What should you do if a threaded rod turns in the concrete during torque tightening?

Never try to force it or to fill it with a quick-setting mortar. Remove the rod, brush the hole and check the cause: residual dust, under-dosing or degraded concrete. Redrill at the regulatory distance defined by the civil engineer or use a specific threaded sleeve, then record this rework on the anchorage record sheet handed to the client.

Who bears the cost of a hydraulic-jack pull-out test on the construction site?

If the metalworker provides complete documentary proof in line with the technical file, the costs of the test required by site management fall on the client. If, however, the anchorage record sheet is missing or incomplete, or if the test reveals insufficient holding capacity of the fixing, all costs remain with the metalwork company.

Why record the batch number of chemical anchor cartridges in the final file?

The batch number guarantees the traceability of the resin's expiry date and certifies its mechanical characteristics in the event of a later claim. If this number is absent from the structure's record sheet, building insurers may dispute the conformity of the anchorage with the requirements of the European technical assessment governing the installed guardrail.

Texts and standards cited