Key takeaways
- Blondel's formula balances effort by combining two step heights and one tread depth to give a total between sixty and sixty-four centimetres.
- A variation of a few millimetres on a single step breaks the motor reflex and causes tripping.
- Standard SIA 358 governs the dimensions of walkable passages to guarantee user safety.
- The metalworker transfers the actual finished levels before fabrication to avoid any discrepancy on the end steps.
Calculating the stride and proportioning the metal step
In finishing-work metalwork related to CFC 274, the geometry of a straight or winder staircase is based on the ergonomic equation known as Blondel's formula: two step heights added to one tread depth must equal the value of an average stride, between sixty and sixty-four centimetres. For an interior staircase in a dwelling or offices, the ideal target is sixty-three centimetres. The step height is generally between sixteen and nineteen centimetres, while the tread depth is between twenty-six and thirty centimetres. If the project calls for a gentle slope, the metalworker reduces the height by lengthening the tread; conversely, a steeper technical or emergency structure allows a maximum height without ever compressing the tread below the permissible thresholds.
- Tread depth and step height
- The step height is the vertical distance between two consecutive tread surfaces. The tread depth is the horizontal distance measured between two successive step nosings, regardless of overlap or projecting nosing.
| Type of structure | Typical height (H) | Typical tread depth (G) | Blondel's law (2H + G) | Comfort in use |
|---|---|---|---|---|
| Main office staircase | 165 mm | 300 mm | 630 mm | High comfort, fluid stride |
| Staircase in multi-unit housing | 175 mm | 280 mm | 630 mm | Optimal balance of space and effort |
| Private interior staircase | 185 mm | 260 mm | 630 mm | Steep slope for short stairwell openings |
| Technical or emergency access | 195 mm | 240 mm | 630 mm | Occasional use, minimal space |
In metalwork, how these dimensions are realised depends on the chosen step build-up: folded sheet welded between flat stringers, support angles receiving a metal tray with dry screed, electroforged grating steps, or oak treads fixed on tapped flat bars. The metalworker must deduct the exact thickness of the finished covering on each step so as not to distort the stride during workshop fabrication. The step nosing provides an overlap of twenty to forty millimetres to make the foot placement secure when descending, but this projection in no way changes the value of the geometric tread depth.
Enforcing strict regularity of the steps between actual finished levels
People climb and descend a staircase through motor automatism. From the second step, the brain records the required muscular amplitude and reproduces the movement reflexively, without looking at each foot placement. If a step differs by only five millimetres from the others, the foot trips on the way up or loses its support on the way down. The absolute regularity of the flight is therefore more important for safety than meeting a theoretical slope to the millimetre: a uniformly steep staircase remains safely usable, whereas a staircase with mixed-up steps inevitably causes falls at the same spot every day.
- Check the official level markLocate the one-metre mark above the finished level drawn by the masons on adjoining walls or concrete pillars. Never start from the raw slab for your measurements.
- Measure the actual total height differenceMeasure the absolute height between the lower finished level and the upper finished level using a rotating laser level set on the site staff.
- Divide to obtain a whole number of step heightsDivide the measured dimension by a compliant target height. Round to the nearest whole number of steps, then recalculate the exact unit height to a tenth of a millimetre.
- Adjust the starting and arrival fittingsMark out the layout of the brackets or plates on the stringer by strictly applying this constant unit height, including to compensate for the different coverings at the two landings.
At the acceptance of the work, the site manager and the metalworker check the execution tolerance using a graduated gauge rod. The height variation between two consecutive steps of the same flight must not exceed two to three millimetres. The floor and head fixings must provide an adjustment range by slotted holes or steel shims to neutralise inaccuracies in the concrete slabs before the mechanical anchors are finally tightened.
Controlling workshop tolerances and assembling metal stringers
A user's motor memory calibrates their stride within the first three steps of a flight. Once the brain has registered the cadence imposed by the relationship between height and tread depth, the lower limb performs a reflex movement without constant visual guidance. A variation of only five millimetres on a single step in the middle of a flight is not noticeable to the naked eye, but it systematically triggers a mechanical imbalance: the foot strikes the riser or the heel hits empty air when descending. This is why the geometric compliance of a metal staircase rests on strict consistency from one end of the structure to the other, well before the pursuit of an ideal theoretical value.
In the fabrication of light metalwork, the side or central stringers dictate the final accuracy. Whether the frame is made of laser-cut flats, UPE channels or rectangular hollow sections, cutting and marking out must lock in the exact centre-to-centre distance between each step support. When tack-welding the seating angles or folded gussets receiving the steps, the thermal shrinkage of the weld bead can create cumulative distortions over the total length. To maintain the comfort relationship over the whole flight, rigid clamping on a surface plate should be carried out and an alternating welding sequence adopted to avoid longitudinal bowing of the stringer.
| Stringer design | Profile used | Main risk of drift | Preventive measure in the workshop |
|---|---|---|---|
| Cut-out sawtooth stringer | 12 to 15 mm steel flat, laser-cut | Thermal distortion of the upper edge during notching | Pre-camber when cutting and systematic squareness check on a surface plate |
| Straight stringer with welded brackets | UPE channel or hot-rolled rectangular tube | Axial twist caused by shrinkage of the weld beads under the step | Symmetrical tacking of the support angles before final welding |
| Box stringer or folded sheet | Folded steel sheet 4 to 6 mm thick | Variable angular opening under the bending radii | Checking with an angle gauge before assembling the bolted steps |
Landing connections and compliance in use according to standard SIA 358
The most frequent geometric incident in building metalwork does not occur in the middle of the flight, but at the starting and arrival interfaces. The landing step and the first low step depend on the actual make-up of the floors: thickness of the acoustic insulation, liquid screed and type of final covering (tiles, glued parquet or resin). If the metalworker positions the anchor plates without setting his levels on the official level mark drawn by the mason, the thickness of the floor build-up will distort the first or last height. A first step of 140 mm followed by a continuous series at 180 mm breaks the motor cadence as soon as one steps onto the staircase.
- Validation of raw and finished levelsLocate the one-metre level mark on the structural work and deduce the exact finished dimension supplied by the site management, including the adhesive and the thickness of the covering at the arrival.
- Checking the horizontal projectionUse a laser distance meter to measure the available run between the face of the floor landing and the starting zone on the ground, to make sure that the chosen tread depth does not encroach on the escape space.
- Installing and shimming the support bracketsFix the lower and upper plates, inserting stainless steel adjustment shims to adjust the seating of the stringer before the anchor studs are finally grouted.
- Checking uniformity from step to stepPlace a tubular level and a gauge rod on each consecutive step to confirm the absence of any offset or height difference greater than two millimetres over the whole route.
The step nosing deserves rigorous attention. Whether it concerns pressed steps, electroforged gratings with a perforated anti-slip profile or metal trays receiving a timber tread, the overlap must remain constant on each unit. An irregular projection of the step nosing artificially changes the tread depth perceived by the foot when descending. By maintaining a stable overlap of 20 to 30 mm, the metalworker guarantees secure support for the sole of the foot while protecting the staircase descent against any unintended catching of the shoe.
Managing level differences and restoring regularity on the construction site
On the construction site, the classic trap closes in during installation: the finished screed of the arrival landing is fifteen millimetres too high, or the ground-floor surface has an unforeseen false level. The first reflex, a disastrous one, is to absorb the difference solely on the landing step or the starting step. The human brain memorises the cadence from the second stride. An isolated break in the step sequence of more than five millimetres causes a systematic misstep on the way down, creating a direct fall risk with regard to standard SIA 358.
- Checking the official level markBefore any drilling, check the one-metre level transferred by the mason to both ends of the stairwell opening using a rotating laser level.
- Complete recalculation of the flightMeasure the actual height between the planned finished surfaces. Divide this dimension by the number of step heights to establish the new common value.
- Formal notice to the site managementReport the geometric deviation immediately in writing according to the rules of standard SIA 118 before undertaking any rework in the workshop.
- Correcting the attachment pointsRework the arrival brackets or recut the stringer feet in the workshop to distribute the slope without altering the tread depth.
When the error exceeds ten millimetres on the total height, no shim can properly make up for it. The fixing shoes must be modified or the stringers remade to guarantee a strictly constant slope. It is better to accept an immediate dismantling than to deliver a metal staircase where every user trips daily over the step nosing.
Frequently asked questions
How do you correct a first step that is too high because the screed was poured too low?
If the actual finished floor is lower than planned, the first step becomes dangerously high. The solution is to create a metal step base or to insert a sole plate under all the stringer plates to lower the structure, provided that the upper landing accepts this offset. If the flight is already fixed at the top, the stringers must be remade to redistribute the height uniformly across all the steps.
What should you do if a stairwell opening that is too short requires a comfort formula greater than 66 centimetres?
A stairwell opening that is too narrow often leads to reducing the tread depth while keeping a large height, which makes the staircase steeper than the criteria of standard SIA 358 allow. In this case, the metalwork cannot compensate alone for a structural shortcoming. You must notify the site management and propose enlarging the opening, or switch to an alternating-tread staircase if the intended use of the room allows this particular technical arrangement.
What tolerance for step height deviation is permitted on a metal flight?
Between two consecutive steps, the execution tolerance should not exceed two to three millimetres. Over the whole flight, the total variation between the lowest and the highest step must remain below five millimetres. Beyond that, the user perceives the change in muscular rhythm, trips on the way up or slips on the way down, directly engaging the liability of the metalworking company.
Can the client reject a staircase showing eight millimetres of variation at the arrival?
Yes, such a deviation constitutes a major functional defect. As the arrival step forms the transition to the finished landing, a height difference of eight millimetres breaks the kinematics of the stride and creates a direct hazard under the requirements of standard SIA 358. The client is entitled to demand that the work be brought back into compliance, involving readjustment of the upper fixings or complete replacement of the stringers concerned.
Texts and standards cited
- norme SIA 358Guardrails and safety elements in buildings, geometric requirements and fall prevention
- norme SIA 118General conditions for the execution of construction work, duty to give notice and management of defects
