Key takeaways
- Monolithic toughened glass shatters into small pieces and retains nobody after a violent impact.
- SIA 358 requires laminated glass to guarantee the residual retention of users.
- The interlayer holds the broken fragments together and preserves a temporary screen preventing a fall into the void.
- Clamping with clamps or a profile requires resilient shims to rule out any metal-to-glass contact.
Understanding breakage and rejecting monolithic toughened glass
On a balustrade construction site, the temptation to use plain, non-laminated toughened glass sometimes arises for supply reasons or immediate cost. This solution represents a direct danger of serious accident. Toughened safety glass does indeed have a flexural mechanical strength four to five times greater than ordinary annealed glass. However, its breakage behaviour totally disqualifies it as a stand-alone retaining barrier without an intermediate film.
Under the effect of an excessive load, a thrown gravel chip or a nickel sulphide inclusion, the internal stresses of toughened glass are released instantly. The entire panel disintegrates into thousands of small blunt fragments in a fraction of a second. The panel disappears from the balustrade, leaving a gaping void. A person leaning on or thrown against the barrier then falls directly into the void, with no obstacle whatsoever.
- Residual strength after breakage
- Temporary mechanical capacity of a damaged or fractured glazed panel to remain in place in its fixing structure and to retain a static or dynamic service load, thus preventing the immediate fall of a person into the void.
To meet the objectives of SIA 358 concerning protection against falls into the void, only laminated safety glass can ensure the barrier function after damage. Made up of at least two glass sheets bonded by one or more polyvinyl butyral (PVB) or structural polymer interlayers, the assembly retains its cohesion even if one or more panes crack.
| Type of glazing | Initial failure mode | Residual strength | Compliance for infill |
|---|---|---|---|
| Float (ordinary annealed glass) | Large, dangerous sharp shards | None: the panel collapses | Prohibited in balustrades |
| Plain thermally toughened glass | Total disintegration into granules | None: void opens immediately | Prohibited without film or reinforcement |
| Toughened laminated (2 toughened sheets) | Fragmentation adhering to the interlayer | Partial: risk of folding depending on interlayer | Compliant with rigid or structural interlayer |
| Heat-strengthened laminated (2 heat-strengthened sheets) | Cracking into large interlocking plates | Very high: residual mechanical locking | Recommended for point fixing |
Installing and securing the glass with clamps or an embedded profile
The transmission of forces from the glass to the metalworker's frame is achieved by two main techniques: glass clamps fixed to posts, or a continuous U-profile embedded or surface-mounted on the stringer. In both cases, the glass must never come into contact with the steel or aluminium of the structure. Any metal-on-glass friction generates micro-notches that cause spontaneous breakage under thermal or mechanical stress.
- Preparation and setting blocksPosition dense elastomer setting blocks at the bottom of the channel under the lower edge of the glazing to transfer the dead load without concentrating stresses at a single point.
- Fitting resilient gasketsSystematically line the jaws of the clamps or the cheeks of the grooved profile with EPDM strips precisely matched to the measured thickness of the glazed assembly.
- Torque-controlled tighteningTighten the locking screws or insert the adjustment wedges using a torque wrench to ensure uniform pressure in accordance with the fitting manufacturer's data sheets.
- Mechanical anti-slip retentionIn clamps holding suspended laminated glass or glass exposed to strong wind, it is imperative to fit through-going safety pins with a hole drilled at the factory before toughening.
Fixing by continuous floor profile is a common solution for all-glass balustrades. To meet the impact-resistance requirements of SIA 358, this aluminium or steel profile must resist the overturning moment generated by a horizontal thrust at handrail level. The internal packing requires removable dry shims or anchoring resins specially formulated so as not to damage the PVB film at the lower edge.
For installation with individual clamps on metalwork posts, the sizing of the lateral clearances and of the bottom clearance in the rebate remains decisive. The bottom clearance must leave at least six millimetres of free space to allow the glass to expand freely. Likewise, the screws fixing the clamps to the metal profile must withstand the shear and pull-out loads calculated in accordance with the metal construction standards.
Post-breakage behaviour and role of structural interlayers
The compliance of a glazed balustrade is judged not only under static load when new, but by its retention capacity after damage. According to the requirements of SIA 358, a balustrade must prevent people from falling even when the infill suffers a violent impact or accidental breakage. Plain toughened glass (ESG), when it breaks, disintegrates instantly into thousands of small non-cutting pieces, immediately opening the void over the full height of the opening. This is why laminated safety glass (VSG) is the only admissible solution in building metalwork to ensure a fall-protection function.
- Residual strength after breakage
- Temporary mechanical capacity of a damaged or cracked glazed panel to maintain its geometry in its plane, to take up the residual horizontal loads and to prevent the passage of a body before its safe replacement.
In a standard laminated safety glass made of two glass sheets and one or more polyvinyl butyral (PVB) films, the behaviour after breakage depends on the thermal nature of the glass components. If two toughened glasses (ESG) are assembled with a standard PVB film, the simultaneous breakage of both sheets leads to what metalworkers call the "wet blanket effect": the pieces of glass remain stuck to the film, but the glazing loses all structural rigidity and sags outwards or inwards under its own weight. To guarantee rigid residual strength, the trade uses either an ionomer or structural interlayer with a high modulus of elasticity, or an asymmetric composition combining toughened glass (ESG) and heat-strengthened glass (TVG). Heat-strengthened glass develops much wider fracture lines when it breaks, maintaining a mechanical interlock that prevents the panel from sagging.
| Panel composition | Type of interlayer | Residual strength after breakage of both sheets | Admissibility under SIA 358 |
|---|---|---|---|
| Toughened / Toughened (ESG / ESG) | Standard PVB (0.76 or 1.52 mm) | None or very low: immediate sagging like a flexible sheet. | Non-compliant as self-supporting glazing; tolerated with a continuous load-bearing top rail. |
| Heat-strengthened / Heat-strengthened (TVG / TVG) | Standard PVB (1.52 mm) | Medium to good: large interlocked fragments jamming the panel. | Compliant with clamps or embedded profile, flatness retention verified. |
| Toughened / Toughened (ESG / ESG) | Ionomer or structural polymer | Excellent: the panel retains its own rigidity even when broken. | Compliant for all-glass balustrades and point-fixed glazing. |
| Toughened / Heat-strengthened (ESG / TVG) | Structural PVB (1.52 mm) | Optimal: balance between impact resistance and geometric retention. | Recommended in metalwork for facades and windy terraces. |
Mechanical fixing: glass clamps, embedded profiles and load transfer
The metalworker anchors the laminated safety glass in two main ways: point fixing by metal clamps fixed to vertical posts, or continuous linear fixing by a profile embedded in the floor or at the slab edge. Each of these systems imposes strict tightening and packing rules to avoid breakage under point stress. In a clamp system, the glass must rest on elastomer setting blocks that are chemically compatible with the interlayer. The use of a safety pin passing through the glazing becomes mandatory whenever sliding of the panel under load cannot be prevented by the mere friction of the clamping jaws. The drilling of laminated glass must be carried out at the factory before the thermal toughening treatment.
- Placing the setting blocks in the profilePlace rot-proof setting blocks in polyamide or EPDM of suitable hardness at the support points defined by the SIGAB guidelines, generally at a quarter of the panel width. Keep the water drainage paths under the glass clear to prevent any standing water.
- Inserting the glazing and geometric alignmentHandle the laminated glass unit using approved suction lifters. Insert the panel into the embedded rail, leaving a minimum bottom clearance in the rebate and regular lateral clearances to absorb the differential expansion between aluminium, steel and glass.
- Locking with wedge clamping blocksInsert the profile-specific packing wedges along the base of the glass. Adjust the verticality of the balustrade using the integrated pressure screws or conical clamping wedges until the upper edge is perfectly aligned with the chalk line.
- Applying the sealing joint and fitting the coverFit the upper rubber sealing profile or run a bead of neutral sealant over a backing rod. Clip on the metal finishing covers to shelter the fixing assembly from weather and direct ultraviolet rays.
In an installation with a continuous profile, the overturning moment generated by a horizontal thrust at handrail level is transmitted to the structure as a localised force couple in the rail. The fixings of the profile into the metal frame or the concrete must be rigorously sized. If the structure deflects excessively under the load defined by the technical standards, the glass panel undergoes inadmissible twisting liable to fracture the heat-strengthened glass prematurely or eject the glass from its housing.
Glazing damage: securing, breakage diagnosis and replacement
When a glazing breaks on the construction site or after handover of the work, the first reflex is to secure the floor opening. Even though the laminated safety glass retains its residual strength after breakage thanks to its plastic interlayer that holds the fragments, the fractured panel loses its structural rigidity. A sustained wind load or a further horizontal push can finish deforming the element and compromise the retention function required by SIA 358. The foreman closes off access to the balcony or erects a temporary site barrier firmly fixed to the slab edges before any intervention.
- Marking off and perimeter protectionClose off the area below the balcony to prevent the possible fall of residual debris during handling. Install a temporary protection device complying with SUVA guidelines to prevent any fall into the void.
- Finding the mechanical causeExamine the crack initiation zone. In a clamp fixing, a metal hard spot against the glass betrays the absence or displacement of an EPDM gasket. In a fixing with an embedded profile, a crack starting from the heel often reveals an unsuitable bottom block or excessive pre-stress due to a twisted profile.
- Controlled removal of the panelRemove the covers, unscrew the clamp jaws or extract the lateral clamping blocks using hand tools. Handle the broken panel with pump suction lifters to avoid tearing of the interlayer and collapse of the sheet.
Ordering a replacement glass involves scrupulously checking the data sheet validated by the engineer. A toughened laminated glass is never replaced by a heat-strengthened laminated glass without checking the compatibility of the blocks and the strength of the shoe. Reinstallation requires new elastomer gaskets to guarantee uniform clamping of the refitted glazing.
Frequently asked questions
Why is monolithic toughened glass prohibited in balustrades without a continuous handrail?
In the event of breakage under impact or spontaneous initiation, monolithic toughened glass disintegrates instantly into thousands of small non-cutting fragments. The balustrade function disappears in a fraction of a second, leaving a completely open void. SIA 358 requires permanent protection against falls: only laminated safety glass provides the residual retention required to prevent a body from falling into the void after breakage.
How do you choose between a standard PVB interlayer and a rigid structural interlayer?
Standard PVB is perfectly suitable for glazing held in a rebate on four sides or supported by closely spaced posts. On the other hand, for a self-supporting balustrade fixed by a profile embedded at the base without a handrail connected to the walls, a rigid or ionoplast film is required. This structural interlayer prevents the broken panel from sagging under its own weight and guarantees the post-breakage rigidity essential to compliance with SIA 358.
Can glass clamps be installed directly on the concrete of a balcony without a metal post?
The metalwork glass clamp is designed to be fixed to a rigid steel or stainless steel post. Fixing it directly into the concrete with anchors is not recommended, because the precise alignment of two independent jaws becomes very difficult to adjust on a raw slab. A misalignment of a few millimetres induces a permanent torsional moment in the laminated safety glass, causing premature breakage under the action of wind.
What specific precaution does the embedded profile require with regard to drainage?
The aluminium floor profile must never retain standing water in contact with the lower edges of the glazing. Prolonged immersion chemically degrades the polyvinyl butyral (PVB), causing delamination, whitening of the edges and loss of mechanical adhesion. The installer must clear the drainage holes provided at the bottom of the channel and ensure that the setting blocks allow infiltrating water to flow towards the outside of the balcony.
Texts and standards cited
- norme SIA 358Balustrades: safety requirements for height, openings and retention of persons
