Key takeaways
- A motorised leaf is an industrial machine subject to the strict requirements of the Machinery Safety Ordinance.
- Mechanical clearances and protective covers eliminate the shearing risk from the outset, during workshop fabrication.
- Sensitive contact edges and photoelectric cells trigger a rapid reversal of movement in the event of impact.
- Measuring dynamic forces with a calibrated instrument validates the installation in a mandatory acceptance report.
Neutralising the shearing and crushing zones on the leaf and the guides
As soon as a motor drives a metal leaf, the work falls under the regime for industrial and commercial closures governed by the SN EN standards. The metalworker is no longer supplying a simple piece of metalwork, but a moving machine capable of exerting destructive pressures. The first safety step does not rest on the control electronics, but on the geometric design of the work. The danger zones are concentrated where the moving leaf passes a fixed structure: guide pillars, adjoining fences, running brackets and end stops.
- Shearing and crushing zone
- Geometric volume of space in which two metal parts in relative motion create a trapping or crushing point liable to sever fingers, trap a hand or crush a human limb when the leaf closes or opens.
| Geometric zone | Foreseeable hazard | Preventive mechanical measure |
|---|---|---|
| Sliding guide post | Shearing of fingers between post and bars | Fine-mesh wire fencing or solid backing sheet |
| Swing gate pivot hinge | Crushing of the hand at the pivot | Flexible anti-finger-trap profiles or constant clearance greater than 25 mm |
| Rear push-back zone | Person trapped against a wall or hedge | Minimum clear distance of 500 mm or fixed protective grille |
| Leading closing edge | Direct crushing of the body at end of travel | Deformable cushioning profile and residual clearance |
The spacing between vertical bars is a classic trap on open-work leaves. If a pedestrian puts an arm through the bars during the movement, the crossing with the fixed pillar acts like shears. The harmonised SN EN standards require either preventing access by a solid infill or a protective mesh sized according to safety distances, or guaranteeing constant clearances that rule out trapping. The upper guide rollers of sliding gates must have removable enclosing covers that prevent fingers from being introduced between the steel roller and the cross-member.
Adjusting obstacle detection and documenting the force test
Where the configuration of the site does not allow crushing risks to be eliminated entirely by safety distances, the metalworker installs sensitive protective equipment. Active safety edges, fixed on the main edge and the secondary posts, monitor impacts. Connected to the control cabinet by radio transmission or coiled cable, they transmit the emergency stop and movement reversal command within a few milliseconds. Photoelectric cell sets complete this arrangement by detecting the presence of a vehicle or pedestrian before any physical contact, but they never replace the dynamic limitation of mechanical forces.
- Visual inspection and clearanceCheck that the leaf travels freely with no mechanical tight spot. Make sure the sensitive edges cover the full usable height of the closing post.
- Positioning the measuring force gaugePlace the standardised force-measuring instrument at three different heights: 50 mm from the ground, 300 mm and at mid-height of the leaf, between the moving edge and the fixed keeper.
- Recording the dynamic curveRun the motorised closing cycle against the sensor. Record the dynamic force peak, the damping time and the value of the residual static force after triggering.
- Checking clearance and reversalConfirm the automatic partial reopening travel of the leaf. The reversal must fully release the obstacle without creating a new trapping point on the opposite side.
Compliance of the drive is validated by an instrumented physical test. The measuring instrument records the impact force according to the criteria of the SN EN standards: the instantaneous dynamic force must not exceed the permissible limits during the first phase of impact, and the static force must then fall rapidly below a residual safety threshold. If the values recorded exceed the prescribed limits, the foreman adjusts the sensitivity of the automatic drive, reduces the end-of-travel speed or replaces the rubber cushioning profile with a model offering greater mechanical deformation.
Obstacle detection and reversal kinematics: measurement protocol for residual forces
As soon as a sliding or swing gate is fitted with a motor drive, it ceases to be a simple item of ironmongery and becomes an access machine within the meaning of the Machinery Safety Ordinance. Crushing and shearing zones do not disappear with the addition of automatic drives: they change their dynamic regime. Obstacle detection, whether by a resistive safety edge on the leading edge, by photoelectric cell or by electronic torque limitation built into the gear motor, must necessarily command the reversal of movement before the force exerted causes bodily injury. On site, the installation team never relies on the audible click of a relay alone: compliance is established by an instrumented physical measurement, repeated and recorded.
- Main closing edge: front trapping point between the leading post of the leaf and the receiving keeper or the masonry pillar.
- Secondary push-back edges: rear shearing zones formed by the passage of the bars in front of the guide posts or the adjacent fence.
- Lower guide zone: risk of feet being drawn in under the bottom beam of a self-supporting gate or along the recessed rail.
- Articulations and hinges: hinge effect creating progressive crushing on opening at the pivot posts.
| Critical zone | Protective device required | Kinematic behaviour required | Validation criterion on the construction site |
|---|---|---|---|
| Main closing edge | Deformable profile with active safety edge | Immediate stop then reversal over a minimum release travel | Complete release of the obstacle with no residual trapping |
| Rear guide posts | Open-work protective screens and bars with reduced spacing | No access whatsoever to moving parts in push-back | Test gauge stopped without contact with the moving structure |
| Open push-back zone | Photoelectric cells and motor thrust limitation | Closing interrupted with hold in a safe position | Instant reaction to the interruption of the alignment beam |
Impact test, test report and technical file of the installation
The instrumented force test is the only method accepted by the SN EN standards to prove that the emergency stop system and the obstacle detection protect users effectively. This test is carried out using a calibrated recording force gauge, with a bearing surface fitted with a spring simulating the deformability of the human body. The metalworker measures the peak dynamic force at the initial impact, the damping time, then the residual static force maintained by the leaf. These three parameters characterise the decay curve of the force. The values measured must fall within the tolerances defined by the official publications of the harmonised SN EN standards.
- Preparing the measuring set-upFix the measuring instrument against the receiving pillar or the closing stop. Position the force sensor successively at different heights along the front post to cover the risks to children, adults and vehicles.
- Starting the automated movementsTrigger closing at nominal speed without manual intervention. Let the leaf strike the sensor to record the dynamic impact peak, the response time of the sensitive edge and the amplitude of the reversal.
- Drawing up the measurement reportTake the force-time graphs generated by the instrument. Record the humidity, the ambient temperature and the condition of the elastomer profiles, which alter the stiffness of the contact edges.
- Compiling the handover fileInclude the test readings in the commissioning report. Hand over the maintenance log, the declaration of conformity and the wiring diagram to the client in accordance with the rules of standard SIA 118.
Action to take in case of non-compliance in the impact tests
Where the force curves show that the permissible thresholds are exceeded or a safety edge does not trigger instant reversal, the gate must under no circumstances be left in automatic operation. A leaf weighing several hundred kilograms whose movement does not reverse on meeting a solid body is a direct mechanical hazard to people and vehicles. As installer of the motorised assembly, the metalworker bears responsibility for placing it on the market and for qualifying the installation under the Machinery Safety Ordinance.
- Making the closing safeDisengage the automatic drive to manual operation or lock the control unit in hold-to-run control by push button or key switch. Block the accesses triggered by remote control, radar or magnetic ground loop for as long as the malfunction persists.
- Diagnosis of crushing zones and mechanical frictionInspect the geometric alignment of the guides, the straightness of the stainless steel rail or the deflection of the self-supporting tubular beam. Parasitic rolling resistance or a slight out-of-plumb of the receiving posts misleads the force detection built into the drive and increases the residual kinetic energy before reversal.
- Checking the safety edges and response timeMeasure the ohmic value of the resistive sensitive edges or the condition of the on-board optoelectronic links. Check the wear of the coiled cables or radio transmitters, then adjust the approach distance and the braking ramp on the control board.
- Repeating the impact measurements and validationCarry out a new complete series of three force measurements on the main edge, the posts and the rear fixed posts. Use a calibrated force-testing instrument with a calibrated spring to check the dynamic peak and the rapid drop below the static level.
Any persistent anomaly requires a failure finding to be written in the test report, stating the forces measured and the defective geometric zones. This interim document informs the client and relieves the company of any authorisation for early operation. Final marking and handing over of the keys take place only after unreserved validation of the measurements over the entire travel.
Frequently asked questions
What to do if the gate refuses to reverse on a sloping or uneven floor?
A change in level under the path of the sliding leaf alters the compression distance of the lower safety edge. If the threshold rubs locally, the electronics interprets this contact as an obstacle or, conversely, a hollow delays the reversal of movement. The running zone must be levelled, the ground clearance readjusted to a constant value, or the bottom cross-member fitted with a soft deformable edge suited to the profile of the ground.
Why does the force gauge show a non-compliant dynamic force despite active photocells?
Photocells create a point-type immaterial barrier, but do not protect all the mechanical crushing zones along the leaf or behind the push-back post. During the standardised test, the impact sensor strikes the metal frame directly: only reversal through the motor's internal force limitation or through an active safety edge absorbs the kinetic energy. Photoelectric cells complement presence detection, but never exempt compliance with the impact curves.
How to justify installing a safety edge rather than detection by the drive?
On a heavy metal gate with high inertia, the electronic detection built into the motor reacts too late to dissipate the moving mass in the time allowed. A deformable safety edge fitted on the leading edge cushions the physical impact thanks to its elastomer chamber while sending a direct cut-off command by electrical contact. It is the only reliable technical solution for passing the dynamic tests successfully on large industrial sliding gates.
Which official document must be handed to the client on commissioning?
The metalworker hands over the force test report containing the dated force readings, the maintenance booklet, the electrical diagram of the cabinet and the manual release instructions. All of these documents form the technical construction file prescribed by the Machinery Safety Ordinance. The declaration of conformity and the fitting of the rating plate attest that the automated closure meets the safety requirements before it is opened to users.
Texts and standards cited
- OMachSafety requirements and essential requirements applicable to placing motorised closures on the market
- SN ENSafety rules for the use of motorised doors, neutralising crushing zones and methods for measuring impact forces