Key takeaways
- The choice of profile depends directly on the wheel type and the anticipated service load.
- SIA 251 requires strict alignment of joints with the setting-out pattern of subsequent floor coverings.
- A profile projecting by one millimetre takes impacts and causes immediate spalling of the screed lips.
- Mechanical fixing on the insulation or substrate prevents any movement during the screed pulling process.
Select the joint reinforcement according to the mechanical constraints of the room
The dimensioning of a joint profile tolerates no approximation. On a floating screed, the profile provides the slip layer break required for dimensional shrinkage while protecting sharp edges against crumbling under traffic. SIA 251 specifies fitness-for-use requirements according to the building's intended use. A standard synthetic profile made of PVC or neoprene is exclusively suitable for residential rooms subject to moderate pedestrian traffic. As soon as handling equipment circulates in the area, the dynamic behaviour changes radically.
| Room usage | Nature of traffic | Angle material | Expansion insert |
|---|---|---|---|
| Residential, offices | Pedestrians, light static loads | Mill finish aluminium or rigid PVC | Thin EPDM cellular foam |
| Commercial areas, warehouses | Manual pallet trucks, light trolleys | Reinforced aluminium or stainless steel | Interchangeable synthetic elastomer |
| Industrial halls, workshops | Forklift trucks, polyurethane castors | Solid steel or cast iron profiles | High-density vulcanised damping body |
Rigid pallet truck wheels apply a destructive point load on the edges of a poorly protected joint. If the metal angle has insufficient thickness, the edge is crushed, transmitting the shock wave directly to the underlying mortar mass. This results in immediate lateral spalling, ruining flatness and creating a snag point for subsequent traffic. When a hard floor covering is glued on later, the profile must strictly allow perfect alignment with the tiling joint.
Set out, fix and wedge the profile to the millimetre before pouring
Successful jointing relies on an absolute rule: adjustment is carried out relative to the general level mark before the arrival of the first transit mixer or the start of the mortar mixer. A profile adjusted by eye during mortar spreading inevitably ends up out of tolerance. If it emerges even by one millimetre above the theoretical surface, the screeding rule hits its metal edge, forming a visible hump and an area of premature wear. If it sinks, it becomes useless and the screed edge breaks.
- Altimetric transfer using a laserCheck the height of the profile by measuring the exact distance from the one-metre level mark on the room walls. Transfer this level along the entire length of the slot using a rotating laser.
- Making rigid bedding padsPlace rapid-setting mortar pads or non-compressible shims every fifty to sixty centimetres along the layout line. Adjust the top of the pads precisely under the fixing flanges of the rail.
- Mechanical floor lockingFix the perforated baseplates of the profile into the hardened pads or onto the structural slab using suitable concrete screws, without piercing damp-proof membranes or embedded conduits.
- Checking with a two-metre straightedgePlace a two-metre masonry straightedge overlapping the profile and adjacent pouring marks to ensure there is no sagging or offset greater than one millimetre.
On a floating screed laid on thermal or acoustic insulation, the main risk lies in the progressive settling of the underlay under the weight of the screeding crews. To neutralise this elastic settlement, the movement profile must rest on shims passing locally through the insulation down to the raw concrete, while maintaining a peripheral separating strip so as not to create an untreated rigid acoustic bridge. If the profile floats freely on the insulation, the passage of the vibrating beam pushes it down, generating an irreversible hollow along the cutting axis.
Choice of movement profile according to traffic stresses and rolling loads
The dimensioning and selection of an incorporated joint profile cannot be improvised on the construction site when aggregates are being unloaded. SIA 251 prescribes strict functional continuity between the nature of the binder, the operational constraints of the room and foreseeable shrinkage or expansion movements. A profile that is undersized for real mechanical stresses undergoes crushing of its upper edges or progressive detachment under repeated traffic, causing systematic spalling of the screed lips.
The nature of the rolling load directly determines the material of the profile and the design of its anchorage flanges. In residential or administrative buildings subject to pedestrian traffic or low-load soft castors, a profile based on rigid polyvinyl chloride coextruded with a flexible elastomer lip meets the detachment requirements. Conversely, as soon as the building accommodates manual pallet trucks, forklift trucks or utility vehicles, the concentration of point loads on solid or hard polyamide tires pulverises simple synthetic profiles. Only metal profiles with slotted side flanges make it possible to enclose the mortar edge and ensure load transfer without degradation.
| Building destination | Type of stress and traffic | Recommended profile material | Expected mechanical behaviour |
|---|---|---|---|
| Multi-family housing, offices, light commercial areas | Pedestrians, light cleaning trolleys, furniture castors | Rigid PVC profile with central core made of flexible synthetic rubber | Absorption of dimensional shrinkage without taking heavy point loads. |
| Reception halls, hospital corridors, light delivery areas | Intense pedestrian traffic, light pallet trucks, hospital beds | Aluminium profile with interchangeable elastomer insert | Protection of screed edges against chipping under moderate impacts. |
| Workshops, technical rooms, covered car parks, logistics storage areas | Pallet trucks with hard polyamide wheels, forklift trucks, vehicles | Heavy galvanised steel or stainless steel profile with thick edge angles | Complete absorption of dynamic rolling loads and limitation of vertical bouncing. |
Adjustment to finished level and mechanical locking before pouring
The screeding angle and final flatness depend entirely on the level level of the profile. The screeder's absolute rule is to align the crest of the profile exactly with the theoretical finished level of the mortar, before introducing a single delivery hose into the room. A profile installed even one millimetre above the levelling plane creates an impassable hard spot for the screeding rule: workers inevitably jump the obstacle, leaving a ridge or a hollow wave on either side. Conversely, a profile positioned too low ends up buried under a thin film of cement that will crack erratically due to drying shrinkage.
- Altimetric transfer from the official level markTransfer the level using a rotating laser level rigorously set to the one-metre level mark transferred by surveyors onto the raw walls. Precisely subtract the nominal thickness of the screed provided in the setting-out plan to mark intermediate metal reference points.
- Making bedding pads and base installationDeposit rapid-setting mortar pads on the slip layer or waterproof membrane, spaced at a maximum of 40 to 50 centimetres to prevent any sagging of the angle under the weight of the rule or personnel traffic. In the case of a self-levelling fluid screed, replace the mortar with mechanical shims adjustable by threaded rod.
- Checking with a two-metre straightedgePosition the profile on its fresh beds and gently tap it with a tiler's mallet or white rubber mallet while simultaneously checking for the absence of gaps under the flat of a 2-metre aluminium straightedge stretched across the bay.
- Lateral locking and anti-drift immobilisationGenerously embed the perforated flanges of the profile with the bedding mortar without ever exceeding the level of the flexible joint. The anchorage must form a compact support cone capable of resisting the lateral thrust of the fresh mortar during the passage of pump hoses.
Level non-conformities and displaced profile: remedial procedures on hardened screed
The tilting or elevation of a joint profile under mortar pressure constitutes a major non-conformity observed upon stripping formwork or during the passage of the two-metre straightedge. When the profile exceeds the theoretical level of the screed by more than one millimetre, the error directly compromises the flatness defined by SIA 251 and exposes the metal or synthetic edge to tearing under rolling loads as soon as the building is put into service.
If the offset is detected before setting begins, the screeder must clear the batch around the joint, readjust the level shims to the laser level mark, then refill with fresh mortar, vibrating manually to ensure contact under the perforations. Conversely, on hardened screed, any protruding profile requires heavy remedial treatment. A metal profile that is too high cannot simply be ground down with a diamond disc: the heat destroys the bond between the anchorage flange and the screed, while the intermediate flexible seal is burnt.
- Profile too high by one to two millimetres without heavy traffic: rectification by mechanical sanding of the screed over fifty centimetres on either side to create a smoothed connection without a step.
- Profile projecting by more than two millimetres or detached: straight-line sawing of the screed ten centimetres on either side of the edge, removal of the mortar with a light chisel without cracking the slab, complete removal of the damaged profile.
- Reinstallation of a new profile adapted to the rolling load: chemical anchoring with non-shrink synthetic resin on the previously cleaned substrate, with flushness check using a bevelled straightedge before complete drying.
In the event of a dispute over the altimetry of the delivered joint, the flushness tolerance remains governed by the flatness requirements of SIA 251. The site manager records the deviation in the site diary and notifies site management before any subsequent floor covering installation.
Frequently asked questions
How to prevent a joint profile from floating during the pouring of a fluid screed?
In the case of a self-levelling fluid screed, buoyant uplift immediately lifts lightweight aluminium or PVC profiles. The screeder must imperatively secure the profile to the substrate or insulation using rapid-setting mortar pads or mechanical fixings spaced at a maximum of forty centimetres. Placing temporary load bridges across the profile during pouring guarantees the immobility of the edge until the mixture has completely stabilised.
Can a joint profile installed two millimetres too low be rectified by the screeder?
No. If the profile is located below the finished screed level, the adjacent mortar edge remains unprotected against shear stresses and rolling impacts. Localised patching on the profile is prohibited as it crumbles quickly. The only solution compliant with SIA 251 consists of sawing a strip of mortar to remove the profile and reinstalling it on a bed of setting resin.
Which profile should be chosen for a traffic area receiving pallet trucks with hard wheels?
Polyamide or rigid polyurethane wheels generate high point loads and repeated impacts on edges. Lightweight profiles with thin edges must be avoided and heavy stainless steel or solid brass profiles equipped with reinforced perforated anchorage flanges must be selected. The deformable central seal must have sufficient Shore hardness not to sink under the rolling load when vehicle traffic crosses it.
At what precise moment is the final altimetry of a movement profile checked?
Checking takes place in two stages. First dry, by shing the upper face of the profile relative to the one-metre level mark transferred by laser onto the peripheral walls. Then, as soon as screeding or straightedge striking takes place, by placing a two-metre metal straightedge straddling the profile to verify the total absence of play or step with the fresh screed.
Texts and standards cited
- norme SIA 251Sets the requirements for flatness, offset and installation rules for floating screeds in buildings.
