Key takeaways
- The floating screed traps moisture if water infiltrates under the insulation without any possible drainage.
- Waterproofing under tiling is the responsibility of the tiler, whereas floor waterproofing is the responsibility of the waterproofing contractor.
- The resilient perimeter strip must extend above the finished level before the screed is applied.
- The screed layer records in writing any water ingress observed on the construction site before work begins.
Positioning the waterproofing and coordinating interfaces between trades
In a wet room, water that passes through a faulty tile joint or bypasses a poorly connected floor drain eventually saturates the body of the screed. Laid on a thermal or acoustic insulation underlay, a floating screed then turns into a confined sponge. Water descends by gravity, soaks the mineral wool or stagnates between the polystyrene boards, without any drainage outlet to the outside. Technical drying of such an assembly requires costly destructive removal and paralyses the structure for several weeks.
- Retention waterproofing under screed
- Continuous membrane applied to the raw slab or under the insulation, intended to collect any infiltration water and protect the lower floors, distinct from the waterproofing system under tiling.
The recurring confusion on construction sites lies in the overlapping of waterproofing functions. The screed layer from CFC 281 carries out the embedding, flatness and mechanical support. They never ensure the waterproofing of the room. Two distinct barriers can frame their work. On the surface, waterproofing under tiling contractually falls to the CFC 282 tiler, who applies a liquid membrane or bonded mat with collars at penetrations. At depth, when retention waterproofing is specified on the raw slab before laying the acoustic insulation, this service is the responsibility of the CFC 226 waterproofing contractor.
| Assembly element | Responsible trade | Time of intervention |
|---|---|---|
| Primary waterproofing on slab | Waterproofing contractor (CFC 226) | Before floor insulation |
| Thermal / acoustic insulation | Screed layer (CFC 281) | On dry and clean substrate |
| Perimeter edge strip | Screed layer (CFC 281) | Before pouring the screed |
| Self-levelling or bonded floating screed | Screed layer (CFC 281) | Before lightweight partitions |
| Waterproofing under tiling (SPEC/SEPI) | Tiler (CFC 282) | After drying and heating |
According to SIA 251 standard, the substrate receiving the screed must be free from stagnant moisture before installation. If the plumbing trade installs its pressurized supply pipes before the screed, a pressure test of the hydraulic network must be formally validated to rule out any risk of hidden leaks in the insulation.
Executing perimeters, pouring the screed and preserving the structure on the construction site
The treatment of vertical perimeters determines the independence of the screed and the protection of partition bases. The resilient polyethylene foam perimeter strip must be installed continuously along the entire perimeter: load-bearing walls, partition walls, columns and riser penetrations. The plastic flap attached to the perimeter strip covers the insulation layer to prevent fresh mortar from passing through during pouring.
The perimeter insulation strips must extend above the surface of the finished screed and can only be cut immediately before laying the floor covering.
Norme SIA 251
In a wet room, this perimeter upstand is of critical importance. If a worker cuts the edge strip flush with the raw screed before the tiler intervenes, the resilient joint absorbs drips or cleaning residues. The tiler then no longer has a continuous support to connect their corner waterproofing tape against the wall. The rule requires leaving the strip to extend by at least 20 mm above the hardened mortar. The final silicone joint or tiled skirting board will mask the final cut.
- Installation of the waterproofed perimeter stripSecure the resilient profile against the vertical walls. Tape the plastic skirt onto the insulation to eliminate any fluid mortar leaks towards the slab.
- Pouring and closing the roomImplement cement or anhydrite screed according to specified thicknesses. Immediately restrict access to the room for at least 48 hours.
- Heating-up protocolExecute the thermal cycle on underfloor heating to purge residual water before any covering or secondary waterproofing work.
- Surface protection and handoverProtect the mortar with breathable boards against impacts from the electrician and plasterer, prohibiting the storage of water or chemical products.
During subsequent finishing work, the screed remains vulnerable to attacks from other trades. A rinsing basin emptied directly onto the floor by a plasterer or a dripping sanitary test valve saturates the drying mortar. The screed layer must record any untimely water addition in the site log. In the event of proven water damage, access for tiling must be suspended until a new residual moisture measurement using calcium carbide is carried out. To estimate additional costs related to forced drying or remedial work, refer to the reference scales at /soumissions/.
Moisture control according to SIA 251 standard and the water retention trap
In a wet room where a waterproof barrier has been placed under the insulation or directly under the mortar, the screed finds itself confined in a closed basin. When water infiltrates before the final covering is laid, natural evaporation through the underside is completely impossible. Moisture remains trapped in the mass of the mortar and in the underlying thermal or acoustic insulation layers. Without forced drying, this saturation leads to premature degradation of the binder, rotting of resilient layers and future debonding of finishes.
- Involuntary retention basin
- Physical phenomenon whereby a floating screed poured over a continuous waterproof sheet with square edge upstands retains all accidental site water, preventing any drainage and blocking the normal drying process of the mortar.
SIA 251 standard governs the conditions for controlling residual moisture before laying bonded or adhered coverings. The calcium carbide bomb test is the only authoritative method on Swiss construction sites to determine the dryness of the screed. Sample collection must obligatorily be carried out over the entire depth of the mortar section, particularly in the lower third where free water accumulates by gravity. In the presence of a film or waterproofing under screed, this depth check requires absolute precision to never perforate the membrane with the chisel or pointed tool.
| Screed type | Waterproofing configuration | Main risk in case of infiltration | Required corrective action |
|---|---|---|---|
| Floating cement | Under screed with perimeter upstands | Blocked drying, alkali migration and late carbonation | Through-flow technical drying by blowing dehydrated air |
| Calcium sulphate (anhydrite) | Under screed with perimeter upstands | Total loss of mechanical strength and disintegration of the binder | Immediate water evacuation, mechanical cleaning if the gypsum is degraded |
| Cement on insulation | Double barrier (under screed and under tiling) | Definitive trapping of water between two waterproof membranes | Decompression core drilling and vacuum drying before closure |
Protection of the structure against finishing work attacks and handover
Preserving the screed in a wet room requires strict discipline on site as soon as pouring is finished. Once smoothing is complete and the initial setting time is respected, the surface remains highly vulnerable to mechanical stresses and accidental water inputs generated by finishing trades. Painters rinsing their tools, plasterers mixing their renders or plumbing installers draining temporary pipes constitute recurring sources of damage on unbonded slabs.
- Prohibition of walking on the screed during the initial hardening period defined by SIA 251 standard, i.e., at least three working days for a standard cement screed.
- Installation of a heavy vapor-permeable diffusion geotextile as soon as foot traffic is authorized, topped with rigid load distribution boards in heavy traffic areas.
- Formal ban on waterproof plastic tarpaulins and non-breathable cardboards which condense rising moisture and soak the mortar surface.
- Rigid and waterproof protection of technical duct heads, electrical sleeves and drainage recesses to prevent dirty water from flowing into the thickness of the screed.
- Written instruction and posting on wet room doors prohibiting the use of rooms as washing stations or storage areas for wet aggregates.
The sequence of operations between the screed layer and other companies must be scrupulously planned by the site management. Pressure tests of sanitary and heating pipes must be imperatively validated and recorded in minutes before starting the installation of insulation and mortar. Any subsequent intervention requiring floor drilling is prohibited without precise prior location, under penalty of simultaneously perforating the waterproofing assembly and any embedded networks.
In the final phase, the peripheral unbonding strips which also ensure the continuity of the waterproofing upstand must under no circumstances be trimmed with a utility knife by the screed layer before the tiler arrives. Cutting this strip at the perimeter occurs only at the precise moment of installing skirting boards or wall tiling, thus ensuring that wall runoff water will not bypass the waterproofing system via the edges of the screed.
Moisture damage during the construction phase: remediation protocol and disputes
Accidental flooding of a floating screed laid on floor waterproofing constitutes major finishing work damage. In the presence of a membrane forming a basin under the insulation, water from pressure tests of sanitary pipes or weather penetrating through unsealed facades becomes trapped in the insulating formwork. This volume of water can neither migrate to the load-bearing concrete slab nor evaporate into the open air, turning the screed mortar into a permanent moisture reservoir.
- Immediate notice of defects and stop orderAs soon as water ingress is discovered, the screed layer notifies the event by written notice to the site management, in accordance with the provisions of SIA 118 standard. Access to the wet room is immediately logged to prevent any mechanical deformation of the water-logged screed.
- Binder diagnosis and control core drillingsSpot core drillings make it possible to measure the saturation of the insulating layer and evaluate the residual strength of the mortar. While a cement screed can withstand forced drying after stopping the leak, a saturated anhydrite screed very often requires pure and simple demolition.
- Implementation of through-flow technical dryingDrying an flooded insulation assembly requires blowing dry dehydrated air through holes drilled through the screed. The blowing nozzles must imperatively stop flush with the insulation so as not to perforate the underlying waterproofing provided by the waterproofing contractor or structural work.
- Contradictory measurement before reopening the finishing lotResumption of tiling work requires a new full verification by calcium carbide bomb measurement, executed jointly according to SIA 251 standard. Drying or complete repair costs are reinvoiced to the company responsible for the water flow.
Dispute resolution revolves around the duties of care prescribed by the Code of Obligations and the site log. When flooding results from the cutting of a waterproofing upstand by another trade, the civil liability of the latter is engaged for all consequential damages. The screed layer refuses any application of covering until the drying report has been formally countersigned.
Frequently asked questions
Who must carry out waterproofing under screed in a bathroom?
The supply and installation of waterproofing under screed falls under the waterproofing or structural work lot, never the screed layer. This bituminous or synthetic assembly ensures the protection of the building against potential major leaks from embedded pipes. The screed layer intervenes only after formal handover of this membrane, on which they roll out their thermal or acoustic insulation, then their slip sheet before pouring their floating screed according to SIA 251 standard.
Why does a screed soaked by a plumbing leak not dry spontaneously?
The presence of the waterproof barrier under the insulation blocks any water evacuation by percolation towards the load-bearing slab. Water accumulates in the thermal and acoustic insulation, creating a continuous reserve that resupplies the body of the screed by capillarity. Natural evaporation from the upper face is much too slow to evacuate this massive volume before the formation of mould or chemical degradation of binders. Forced drying by dehumidifiers and blowing becomes essential.
At what height must perimeter strips extend in wet rooms?
Peripheral unbonding strips must imperatively extend by at least two centimetres above the finished floor level, including tiling. They must never be cut before the complete installation of the tiled covering by the tiler. This continuous protrusion prevents any acoustic bridge at the perimeter and prevents mortar laitance or mixing water from bypassing the insulation to reach the underlying waterproofing or the feet of plasterboard partitions.
How to protect the screed and its waterproof upstands from other trades?
Site management must plan the strict closure of the wet room after pouring to respect the initial hardening period. Once the screed is walkable, rigid board or thick non-woven breathable mechanical protection protects corners and the surface against impacts from the electrician or plumber. It is strictly forbidden to perforate peripheral upstands with metal partition tracks or technical duct fixings.
Texts and standards cited
- SIA 251Requirements and moisture controls for screeds in construction
- SIA 118General conditions for the execution of construction work and notice of defects
- CODuty of care and general rules relating to the contract for services