Acoustics: silencers, transmission paths and room noise: the execution reference
Noise from a balanced-ventilation installation (supply and extract) is the leading reason for rejecting the acceptance of a housing or accommodation building. This technical section details how to control airborne and structure-borne transmission in accordance with SIA 181 and SIA 382/1. Intended for lead fitters and site managers, it brings together the sizing rules, decoupling methods and measurement protocols needed to ensure compliance from the very first commissioning.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 5
30 dB(A)
Permissible continuous installation sound level in a bedroom for minimum requirements
25 dB(A)
Permissible continuous installation sound level in a bedroom for high requirements
2.0 m/s
Maximum recommended air velocity through the free area of a supply terminal in a bedroom
3.0 m/s
Maximum air velocity in a branch duct directly serving sleeping areas
50 mm
Minimum standard thickness of mineral wool for an absorbent baffle of a tertiary silencer
Technical scope of the ventilation systems installer
The ventilation systems installer (CFC 244) bears full responsibility for the air path and for the acoustic energy generated between the air-handling unit and the living spaces. Our scope covers containing fan noise by means of suitable silencers, preventing flanking transmission between rooms through the duct network, reducing radiation from duct walls, and the anti-vibration decoupling of hangers and supports. Under art. 365 CO, the contractor is required to notify the client immediately of any design or duct-configuration defect that would compromise the final acoustic performance.
To work with rigour, the boundary of the trade must remain perfectly clear with respect to the other trades of the technical finishing work:
- Thermal installations (CFC 241): heat generation, chillers, external heat pumps and hydraulic circulators fall under the heating installer. The ventilation installer is responsible only for the water or electric heat exchanger fitted in the air-handling unit casing and the flow noise that results from it.
- Sanitary installations (CFC 250): gravity drainage of the wastewater network and the mains water supply belong to the sanitary installer. The ventilation installer carries out only the connection of the ball trap or dry trap providing the water seal under the unit's condensate tray.
- Electrical installations (CFC 232): the main supply line, the lockable local isolator and the circuit breakers in the switchboard remain the electrician's domain. The ventilation installer connects the internal control components and the motors downstream of this isolator.
- Building management systems (CFC 238): the addressing of communication gateways and the configuration of the bus belong to the integrator. The CFC 244 fitter sets the mechanical speeds, nominal airflow rates and damper stops.
- Structural work and masonry (CFC 211.1): core drilling, openings and sleeves in concrete slabs or walls are carried out by the mason. The ventilation installer specifies the opening dimensions to guarantee the clearance required for sound insulation.
Logical reading order and operational progression
Acoustic control cannot be improvised during the final tests; it is built up from the ordering of components through to the joint inspection. In the event of proven non-conformity at handover, the client may exercise its rights in respect of defects under art. 368 CO. The order of the ten chapters in this section follows the exact chronology of construction site operations:
- 1. Contractual requirements and the bedroom threshold (K4-01)Define precisely the permissible limit value under SIA 181 to avoid rejection of the works at acceptance.
- 2. Primary absorption on the network (K4-02)Size the length and baffle spacing and check the pressure drop of the main silencer at the unit outlet.
- 3. The inter-room transmission trap (K4-03)Deal with crosstalk through the distribution ducts by lengthening the runs or by fitting secondary terminal silencers.
- 4. Breaking solid acoustic bridges (K4-04)Select and install anti-vibration clamps, flexible connectors and hanger isolators to prevent coupling with the concrete.
- 5. Protecting the external environment (K4-05)Position the exhaust grilles, calculate the geometric attenuation at the façade and apply the night-mode programming.
- 6. Fluid dynamics and whistling (K4-06)Check the air velocities in the ducts and at the diffusers to prevent self-generated vortex noise.
- 7. Joint acceptance testing (K4-07)Prepare the measurement chain, calibrate the class 1 sound level meter and record the report under nominal operating conditions.
- 8. Remedial treatment of exceedances (K4-08)Apply the hierarchy of corrective measures once an exceedance has been found, from air balancing to heavy work in the suspended ceiling.
- 9. The plant room envelope (K4-09)Ensure the airtightness of slab penetrations, the flexible sealing of crossings and the sound reduction of the access door.
- 10. Advance notice and client communication (K4-10)Explain to the client the physical reality of residual airflow noise so as to align expectations before installation.
📘 Chapters in this section 10
The bedroom threshold: level not to be exceeded, measurement and refusal of acceptance
Secure your acceptance of the works by mastering the strict acoustic requirements imposed in sleeping rooms.
Acoustics: silencers, transmission and room noiseThe silencer: length, baffles, pressure drop and the consequence of leaving it out
Calculate your baffle silencers precisely to absorb the fan spectrum without excess pressure consumption.
Acoustics: silencers, transmission and room noiseHearing each other from one bedroom to the next: crosstalk through ducts and lengthened routing
Eliminate the transmission of speech between neighbouring bedrooms through a duct layout that is properly decoupled.
Acoustics: silencers, transmission and room noiseNoise travelling through the structure: fixings, clamps and rigid contacts
Ban rigid contact with the structural work to neutralise the structure-borne transmission of drive vibrations.
Acoustics: silencers, transmission and room noiseNoise outdoors: façade discharge, night-time reduction and neighbour complaint
Protect the immediate neighbourhood from the night-time noise emergence generated by exhaust air grilles on the façade.
Acoustics: silencers, transmission and room noiseWhistling: duct velocity, outlet velocity and an over-closed damper
Adjust air velocities to eliminate once and for all aeraulic whistling at the balancing dampers.
Acoustics: silencers, transmission and room noiseMeasuring noise at acceptance: instrument, conditions, operating mode and joint inspection
Carry out an unimpeachable acceptance acoustic measurement with a sound level meter of the class required by Swiss rules.
Acoustics: silencers, transmission and room noiseExceedance found: possible corrective measures, from least to most destructive
Resolve a decibel exceedance found at handover by applying graduated, non-destructive remedies.
Acoustics: silencers, transmission and room noiseThe plant room: wall insulation, acoustic door and penetrations
Treat the plant room envelope to prevent direct radiation from the units towards adjoining dwellings.
Acoustics: silencers, transmission and room noiseAnnounce before installing: the noise a ventilation system makes, and what it will not do
Present clearly to the client the noises inherent in the installation so as to avoid any subjective dispute.