Key takeaways
- The SN EN 12237 standard sets the airtightness classes required on Swiss air duct networks.
- Accessories with an integrated EPDM gasket guarantee class C without any added chemical product.
- Air duct sealant is applied continuously to corner cleats and rectangular frames.
- Adhesive tape ensures the vapour barrier continuity of insulation but does not seal any bare duct.
Integrated gasket and air duct sealant: guaranteeing the airtightness class to SN EN 12237
On a commercial or residential ventilation construction site in Switzerland, the days of adhesive tape hastily applied to a male-female joint are over. Energy efficiency requirements and acceptance inspections demand compliance with SN EN 12237, which defines the mechanical strength and permissible leakage rates of circular sheet-metal ducts. To reach class ATC 3 (formerly class C), the minimum standard on current Minergie installations or office buildings, every joint must keep its integrity under a test pressure of several hundred pascals.
- SN EN 12237 standard
- Technical standard determining the mechanical strength and air leakage limits for circular metal duct networks, classifying airtightness from class A (the most permissive) to class D (the tightest).
For spiral-seam circular networks, the reference technical solution remains the fitting pre-equipped with an integrated double- or triple-lip EPDM rubber gasket. This elastomer profile, crimped in the factory into a calibrated groove of the coupling, reducer or bend, ensures uniform radial clamping when it is pushed into the spiro tube. Airtightness does not depend on the fitter's manual skill in spreading a paste, but on the manufacturer's machining tolerance.
- Deburring and cleaning the cutCut the spiro duct with a nibbler or reciprocating saw, then carefully grind off every internal and external burr. A sharp edge tears the lip of the EPDM gasket during axial insertion.
- Coaxial insertion with neutral lubricantPresent the coupling perfectly in line with the duct axis. If necessary, apply soapy water or a neutral, solvent-free lubricant. Push in as far as the mechanical stop without twisting the component.
- Mechanical securingSecure the assembly with short self-drilling screws or sealed rivets, distributed according to the diameter (at least three screws up to a diameter of 250 mm, four screws above), taking care not to puncture the sealing gasket.
On rectangular ducts and custom-made transition fittings, the crimped EPDM gasket cannot be used. The installer then uses a specific air duct sealant. This is an acrylic dispersion or a hybrid polymer without aggressive solvent, formulated to retain permanent elasticity under fan vibrations and temperature cycles. This sealant is pumped into the bottom of the connection frame profiles before the corners are cleated, and onto all longitudinal seams known as "Pittsburgh seams" formed in the workshop.
The technical limits of adhesive and its only permissible role on rigid ducts
Using plasticised cloth tape or single-sided aluminium tape as the sole sealing barrier on a bare duct joint is a major non-conformity on Swiss construction sites. In a false-ceiling plenum crossed by hot water pipes or carrying air tempered at 22 °C, the synthetic-resin-based adhesive undergoes unavoidable oxidation and thermal polymerisation. Within two to three years, the plasticisers evaporate: the adhesive hardens, crystallises, loses its tack and the tape peels off under the mere air pulsation of the dampers.
| Jointing system | Ageing resistance | Heat resistance (plenum) | Accepted compliant use |
|---|---|---|---|
| Integrated EPDM gasket | More than 30 years | Excellent up to 80 °C continuous | Primary seal on circular networks |
| Elastomeric air duct sealant | More than 25 years | Very good, retains its elasticity | Rectangular frames, corner cleats |
| Cloth adhesive tape (duct tape) | Less than 3 years | None, dries out quickly | Temporary site use only |
| Pure aluminium tape with cross-linked acrylic adhesive | 10 to 15 years | Average to good if surface degreased | Closing vapour barriers on insulation |
Adhesive tape nevertheless has an undeniable use in installation, provided it is confined to its real technical function: closing thermal and acoustic insulation. A pure aluminium adhesive tape, 30 to 50 micrometres thick and fitted with an acrylic adhesive cross-linked by ultraviolet radiation, is used exclusively to ensure the continuity of the vapour barrier on mineral wool mats or expanded elastomer sleeves covering the ducts. It prevents ambient water vapour from migrating towards the cold metal of a cooled supply duct, thus avoiding interstitial condensation.
The contractor is liable for the conformity of the delivered work under art. 364 CO. Using adhesive tape to mask a badly fitted joint, an excessive gap between sheets or the absence of an integrated gasket is an execution failure. During the pressure tests prescribed by the site management, these makeshift seals systematically fail, leading to costly rework on cramped construction sites.
Mechanical connection and fitting of gasketed couplings: guaranteeing thirty-year durability
The EPDM profiled elastomer gasket factory-fitted on shaped pieces (bends, tees, reducers and couplings) is the technical standard for reaching the high airtightness classes prescribed by SN EN 12237. However, this component provides only a passive sealing function through elastic compression of its double lip against the inner face of the spiral-seam duct. It has no intrinsic axial mechanical strength. The air thrust resulting from static pressure, combined with the building's thermal expansion and the continuous vibrations generated by fans, quickly separates ducts that are merely pushed together. Without positive anchoring, the network slips and opens.
- Rigorous sizing and deburring of cutsCut the spiro duct with a nibbler or a reciprocating saw fitted with a thin-metal blade. Systematically deburr the inner and outer edge using a deburring scraper or a flat file. Any residual metal burr risks shearing the sealing lip during insertion. Straighten the end with flanging pliers if the cut has deformed the roundness of the shell.
- Axial insertion without angular stressAlign the coupling or shaped piece perfectly with the longitudinal axis of the duct. Start engaging the gasket while maintaining continuous axial thrust combined with a slight rotary oscillating movement. The stop collar or pressed bead of the piece must come firmly against the edge of the sheet to confirm full penetration of both lips of the EPDM profile.
- Mechanical connection with sealed fastenersSecure the joint to take axial tensile forces using short self-drilling screws (maximum length under head 13 mm) or sealed aluminium-steel blind rivets. Distribute the fasteners evenly around the circumference according to the diameter: 2 screws up to a diameter of 160 mm, 3 screws up to a diameter of 250 mm, 4 screws up to a diameter of 400 mm, and at least 6 screws for larger sections.
Air duct sealant and adhesive tape: site procedures and limits of use
On rectangular sections assembled with profiled frames and corners, as well as on circular pieces made by hand in the workshop without a factory EPDM profile, the airtightness of the work relies on air duct sealant. The product used on Swiss construction sites must be a single-component thixotropic paste based on acrylic or solvent-free hybrid polymer, compliant with indoor air hygiene requirements and with certified fungistatic properties. The sealant bead must be applied continuously in the bottom of the frame groove before the clamping cleats are assembled. On bare circular duct, the sealant is applied directly to the male part before insertion, then smoothed with a spatula into a continuous fillet over the external gap after mechanical riveting.
| Sealing system | Main area of application | Observed performance in plenum | Usage requirement |
|---|---|---|---|
| Double-lip EPDM gasket | Factory-calibrated circular fittings | More than 30 years | Standard requirement to reach the classes of SN EN 12237. |
| Acrylic air duct sealant | Rectangular frames, branch connections and offsets | 20 to 30 years without cracking | Mandatory on bare sheet metal and frames, subject to mechanical locking. |
| Pure aluminium tape (acrylic) | Vapour barrier on external insulation | 5 to 8 years on hot sheet metal | Strictly limited to bridging faced thermal insulation. |
| Adhesive cloth tape (duct tape) | Prohibited on permanent air duct networks | 1 to 3 years before peeling | Reserved for temporary closing of ducts against dust. |
The illusion of airtightness obtained with adhesive tape wound around an unsealed circular joint is a clear case of defective workmanship. In a technical plenum where heat accumulates under the ceiling, the solvents and tacky resins of tapes dry out under the combined effect of high temperatures and micro-vibrations of the air flow. The film relaxes, blisters under overpressure and lets out parasitic whistling. For a movable work integrated into an immovable work, the limitation period for defects is five years under art. 371 CO. A network sealed with adhesive regularly fails periodic inspections or flow acceptance tests, forcing the installer to remove the false ceilings to redo each joint with sealant, cancelling any initial saving in installation time.
Non-compliant pressure test: locating leaks and reworking the network
When a section fails the pressure test to SN EN 12237, the cause is almost always a faulty joint. In practice, adhesive tape wrongly used as the primary sealing barrier peels off under air thrust or dries out in a hot plenum. The airtightness defect may also stem from a gasket lip pinched during insertion of a coupling, or from sheet metal deformed by asymmetric screwing.
- Locate the air lossesPut the network under a test pressure of 200 Pa using the air generator. Spray a specific foaming product for pipework on suspect joints, or inject non-greasy artificial white smoke upstream to visually spot air escaping.
- Dismantle and inspect the connectionRemove the mechanical fasteners at the identified leak. Pull out the fitting to check the condition of the integrated EPDM gasket. If the lip is sheared, flattened or twisted by the sharp edge of the duct, replace the accessory or gasket entirely.
- Make the final seal with sealantDegrease the galvanised sheet metal with dry solvent. Reinsert the coupling in line without forcing it. Refix the element with short self-drilling screws, then apply a continuous bead of air duct sealant with a spatula, covering the sheet-to-sheet joint.
Contractually, a leaking network is a work that does not comply with the recognised rules of the trade. Art. 368 CO governs the client's rights in case of defects in the work, opening the way to rectification of the disputed joints at the ventilation installer's expense. To avoid such destructive rework behind already closed false ceilings, the pressure test must be carried out before any thermal insulation or architectural cladding is fitted.
Frequently asked questions
Can pure aluminium adhesive tape be used to replace sealant?
No. Aluminium adhesive tape never replaces an air duct sealant or a factory-fitted integrated gasket. It provides surface mechanical protection or the continuity of a vapour barrier on insulation. Applied alone on a duct under positive pressure, the adhesive loses its grip with temperature variations and vibrations, leading to a certain leak after a few months.
What should be done if a male fitting jams and pushes the integrated gasket out of its groove?
Never force a fitting in with a hammer. Check the deburring of the inner edge of the duct cut to length, correct the roundness of the sheet metal with flanging pliers, then apply a neutral solvent-free lubricant to the elastomer profile. The piece must slide straight in as far as the coupling's stop without twisting the rubber.
Which sealant should be chosen for ventilation networks in a Minergie building?
Use a solvent-free acrylic or polymer sealant, elastomeric and plastoelastic, specially designed for metal ventilation networks. This sealant must stay flexible after drying, tolerate the building's thermal expansion without cracking, and have very low emissions of volatile organic compounds in order to preserve the quality of the indoor air supplied to the occupants of the rooms.
How many fixing screws must be fitted on a circular duct with an integrated gasket?
The rules of the trade require at least three mechanical fixings distributed evenly around the circumference for diameters of 200 mm or less. For larger diameters, fit one screw every 150 to 200 mm of circumference approximately. These screws prevent the coupling from coming apart under air thrust while avoiding direct puncture of the gasket's bearing surface.
Texts and standards cited
- SN EN 12237Ventilation for buildings - Ductwork - Strength and leakage of circular sheet metal ducts
- COClient's rights in case of defects in the work: refusal, price reduction, rectification, damages