🧱 CFC 244Commissioning, measurement and air flow balancingChapter 5 of 10 in the section

Programming the modes: reduced, nominal, boost, and schedules that hold up in use

This chapter guides you through setting the airflow setpoints and time schedules of ventilation units. You will learn how to calibrate the reduced, nominal and boost modes, how to connect air-quality sensors and override buttons logically, and how to brief the operator so that the settings last without unnecessary overconsumption.

Key takeaways

  • Nominal mode covers standard occupancy, while reduced mode provides the minimum night-time hygiene ventilation.
  • Boost mode must always be timed so that heated air is not extracted at night.
  • CO2 and humidity sensors control the airflows according to the actual occupancy of the rooms.
  • A methodical explanation given to the occupant prevents the system from being permanently locked on maximum speed by hand.

Defining the airflow setpoints and the triggers of the three modes

In a balanced-flow ventilation system, the supply of fresh air must meet hygiene needs without causing disproportionate heat losses through air renewal. The setting of the three speeds on the unit's stand-alone controller determines the overall efficiency of the air distribution network.

Operating parameters of the three main airflow modes
MethodUsual setpoint rangeMain roleTrigger
Reduced30 % to 50 % of nominal airflowMaintaining background air flushing outside occupancy, removing residual VOCsWeekly timer of the air-handling unit
Nominal100 % of design airflowAir renewal for standard occupancy according to the project calculationsWeekly timer or intermediate sensor threshold
Boost110 % to 130 % of nominal airflowTemporary occupancy peak or occasional moisture removalTimed push button or high threshold of room sensor

Reduced mode starts during periods of prolonged non-occupancy. The classic mistake is to programme a complete shutdown of the machine. A residual airflow of at least one third of nominal maintains the building in relative overpressure or negative pressure, prevents odours from stagnating and prevents the ducts from fouling through condensation of humid air that is not extracted.

Boost mode must never be configured as a permanent state. If a unit extracts two thousand cubic metres per hour at high speed all night in unoccupied offices, the thermal energy recovered by the heat exchanger does not compensate for the losses caused by reheating the residual outdoor air, nor for the overconsumption of the fan motors. Boost mode is reserved for peaks in use: full meeting rooms, exceptional moisture production in sanitary facilities or occasional solvent loads.

Automatic switching between modes relies mainly on CO2 sensors for office or school areas, and relative humidity sensors for sanitary blocks and changing rooms. The sensor sends a 0-10 V signal to the ventilation controller. Below the first threshold, the unit runs at low speed. As soon as indoor pollution increases, the controller gradually accelerates the fans up to nominal airflow, or even boost if the high threshold is exceeded.

Programming the schedules and briefing the operator on use

  1. Establishing the weekly scheduleEnter the operating periods into the unit's timer, taking the real calendar into account. Anticipate the switch from reduced to nominal mode forty-five minutes before the occupants arrive in order to flush the volume of the building.
  2. Setting the local override loopsConfigure the activation time of boost mode to a fixed value in the ventilation controller. Any pulse on the wall control restarts a decreasing timer visible on the local display.
  3. Checking consistency with the works contractUnder art. 364 CO, the contractor carries out the work in compliance with professional rules. Art. 365 CO requires the client to be notified immediately if an instruction jeopardises the work; report in writing any permanent boost schedule demanded by the client that would damage the equipment.
  4. Drafting the simplified instruction sheetFix a laminated notice inside the technical cabinet and near the room control unit, setting out the operating speeds and the principle of automatic stop of over-ventilation.

Passing the information on to the occupants is the last technical phase of commissioning. The average user often interprets the flow of air from a vent as a source of discomfort or, conversely, believes that a silent airflow means the installation is switched off. Explain clearly the role of the background flushing and that there is no need to touch the main controller.

When handing over the installation, document on the balancing report the setpoint values measured at the pressure switches and the motor speed percentages associated with each mode. This traceability allows the maintenance services to detect any later drift of the schedules or any software alteration made by unqualified third parties.

Setting the airflow setpoints and switching thresholds

The airflow programming of a balanced-flow installation rests on a strict hierarchy of airflows: reduced mode for non-occupancy, nominal mode for standard conditions of use, and boost mode to remove peaks of pollutants or moisture. The most frequent drift found on air-handling units is the maintenance of a continuous boost speed at night, often caused by poor correlation between the basic time periods and the physical switching thresholds.

Usual distribution of the three airflow modes and associated triggers
MethodIndicative airflow (% of nominal)Main triggerRecommended activation threshold
Reduced (non-occupancy)30 % to 50 %Weekly timerOff-peak periods (e.g. 20:00 - 06:30)
Nominal (basic presence)100 % (basic airflow)Timer or PIR presenceStandard operating period
Boost (occasional peak)130 % to 160 %CO2 / VOC / RH sensor> 1000 ppm CO2 or > 70 % RH

Reduced mode guarantees the minimum hygiene air renewal needed to remove residual emissions from materials, without needlessly cooling the building or overconsuming on electronically commutated (EC) fans. The nominal airflow sized in the project ensures the air balance of living rooms and sanitary rooms. Boost mode must never be programmed as a recurring, extended time slot: it is a temporary over-ventilation dedicated exclusively to exceptional loads.

When the switch to boost mode is made via room or extract sensors (CO2, humidity or volatile organic compounds), setting the hysteresis and the timers avoids fan hunting cycles. If the switch-on threshold is set at 1000 ppm of carbon dioxide, the fall-back threshold to nominal must be set at 800 ppm with a minimum hold time of at least fifteen minutes. Without this dead band, the system oscillates continuously, strains the motors and generates acoustic disturbances noticeable to the users.

Local overrides, time programming and handover to the occupant

The weekly time schedule is the backbone of the installation. It is programmed directly on the unit's control module to adapt the speeds to the building's cycles: offices, schools or multi-family housing. Outside these periods, the installation switches by default to reduced speed. To cope with operating contingencies (late meeting, occasional drying of rooms or cleaning), local override controls must be connected and configured.

  1. Setting the timed overridesConfigure the manual control device (push button or remote selector) on a countdown locked to a maximum duration of 90 to 120 minutes. Contractually prohibit permanent bistable switches that allow the user to engage maximum speed and leave it there indefinitely.
  2. Validating the automation prioritiesCheck the controller's internal priority table: fire-safety commands remain the master, followed by the timed manual override, then the sensor threshold setpoints, and finally the basic time schedule.
  3. Checking currents and stabilityMeasure the fan's consumption at each step with a clamp ammeter and check with a differential manometer that the static pressures in the duct remain within the selection range of the heat exchanger without causing whistling at the terminals.
  4. Handover in person and operator trainingExplain clearly the mechanical behaviour of the modes to the occupants at acceptance, to avoid the destructive reflex of switching off circuit breakers or fuses when faced with the noise of an untimely boost mode.

The explanation given to the occupant or caretaker is the decisive link in a successful commissioning. The contractor fulfils his professional duties under art. 364 CO by ensuring careful execution, which includes basic instruction on the comfort controls. A poorly informed occupant often interprets the flow of a boosted airflow as a fault or a waste, which leads him to block the supply diffusers or to demand that the unit be switched off completely.

During the inspection of the work provided for in art. 367 CO, presenting the airflow log and the programmed time periods makes it possible to prove that the energy and comfort setpoints have been met. The refrigeration or ventilation fitter thus demonstrates that the equipment operates according to the initial design calculations, while offering the flexibility required by the actual occupancy of the rooms.

Control malfunctions: diagnosing drifts and resetting

When an installation ventilates at full speed in the middle of the night, the fault almost always comes from a competing control that has not been locked out or from a measurement drift. The first reflex on site is to query the status history on the stand-alone controller or the air-handling unit: you must identify whether the command comes from the internal timer, from a local override button left stuck, or from an air-quality sensor. A timer without automatic switch-off delay or a rotary selector left on forced operation cancels the night setback and keeps the motor at maximum airflow to no purpose.

Procedure for clearing airflow programming faults
Observed symptomTechnical causeResetting action
Night-time hold in boost modeOverride push button without timer or contact left closedReplace with a timed push button with automatic return limited to two hours
Untimely switch to boost modeZero drift on CO2 sensor or fouling of the measuring cellCheck with calibration gas, recalibrate the sensor or readjust the high threshold
Reduced mode inactive at weekendsInternal calendar out of phase or public holidays not set in the controllerSynchronise the clock on the network and reprogramme the weekly matrix
Excessive air noise in the morningNominal mode switched on too early relative to actual occupancyDelay the nominal start by thirty minutes and adjust the acceleration ramp

If a room sensor commands maximum airflow with no one present in the rooms, a comparative check with a calibrated portable sensor is required directly in the occupied volume or on the general extract duct. Any transmitter showing a permanent offset greater than the manufacturer's tolerances must be recalibrated or replaced on site. When the malfunction results from inappropriate intervention by the users, the fitter meets the technical operations manager to remind them that a ventilation installation controlled in accordance with standard SIA 382/1 is not operated manually like a simple window sash: the override controls remain tools for temporary compensation of occasional overloads. A resetting record noting the revised setpoints, the final time programme and the actual airflows measured at the terminals is jointly signed to confirm completion of the operations.

Frequently asked questions

Why limit the local override of boost mode to two hours?

A manual override without a strict timer inevitably ends up forgotten by the users at the end of the day. The unit then runs all night at its peak airflow, causing premature wear of the filters, noise nuisance and needless electrical overconsumption of the fans. By limiting the boost to a maximum duration of one hundred and twenty minutes, the controller guarantees the air renewal needed for the event before automatically switching back to the mode programmed by the timer.

At what CO2 threshold should boost mode be triggered in offices?

The switch-on threshold of boost mode is generally set between 1000 and 1200 ppm according to the recommendations of standard SIA 382/1. In nominal mode, the control keeps the air quality below the intermediate threshold of 800 to 1000 ppm. If dense occupancy pushes the concentration above the high threshold, the control modulates the dampers or the fan speed to remove the pollutants, then steps back down as soon as the air returns to normal.

What is the benefit of keeping a reduced mode rather than switching off ventilation at night?

Switching the unit off completely at night causes an accumulation of indoor pollutants emitted by materials and furniture, with a risk of moisture stagnation. Reduced mode, set between twenty and thirty per cent of nominal airflow, maintains a slight negative pressure or a minimum sanitary flushing without noise or excessive consumption. It also provides effective hygienic pre-flushing before the first occupants arrive in the morning, without having to start boost mode prematurely.

How can the operation of the modes be explained simply to the occupants of the rooms?

The explanation must focus on practical use without control-engineering jargon. It must show that the system manages daily needs on its own via its timer, that nominal mode is invisible and silent, and that the wall control is only for odours or unforeseen crowded meetings. The occupant must understand that the increased noise corresponds to a temporary two-hour peak that switches off automatically, without any need to touch the control unit again.

Texts and standards cited

  • norme SIA 382/1Ventilation and air-conditioning installations - General principles and performance