Key takeaways
- Accumulated greasy vapours turn the extraction duct into a genuine vertical flame propagator.
- The high-efficiency grease separator captures aerosols upstream, directly under the extraction hood.
- Grease-tight access hatches must be fitted at every change of direction of the system.
- The operator must record regular cleaning in a maintenance log to ensure the safety of the work.
Design of the greasy extraction system and positioning of hatches according to AEAI
In a restaurant or institutional kitchen, the extracted air carries a mixture of hot air, water vapour and suspended lipid droplets. When these vapours pass through colder metal ducts, the grease condenses on the inner walls. Without rigorous capture at source and full access for degreasing, this deposit forms a continuous, highly flammable layer. In the event of a fryer fire or flambéing under the hood, the duct acts as a thermal chimney, drawing in the fire and spreading it through the floor slabs and fire compartments of the building.
The first line of defence is the grease separator placed immediately under the hood or the filter ceiling. Metal mesh filters are prohibited in favour of stainless steel impact filters or baffle-type centrifugal separators. These mechanical components force the airflow to make sharp turns, throwing the heavy oil droplets by inertia against the smooth walls so that they drain towards a sealed drain channel. A correctly sized separator blocks a major share of the aerosols, limiting fouling of the downstream system.
| Component | Technical specification | Installation requirement |
|---|---|---|
| Air duct | Welded black steel sheet or 1.5 mm stainless steel | Continuous liquid-tightness, minimum slope of 1 % |
| Access hatch | Rigid frame with grease-resistant gasket | Maximum spacing of 3 metres and at every bend |
| Grease separator | Stainless steel A2/A4 labyrinth filters | Removable without tools, collection tray with drain |
| Fire-rated penetration | Approved fire stopping EI 30 to EI 90 | Ventilated sleeve or non-combustible thermal insulation |
The ventilation installer must provide accessible cleaning hatches along the entire length of the duct. These openings are not mere air-flow inspection hatches: they must be tight against grease and washing liquids, withstand the ignition temperature and offer a clear opening large enough for the passage of mechanical brush heads or high-pressure nozzles. If a duct runs in a technical shaft or a fire-rated false ceiling, a coordinated fire-rated access hatch must necessarily be provided in addition to the duct hatch.
Cleaning protocol, safety log and operating responsibilities
A compliant installation of the system does not guarantee the durability of the work if preventive maintenance is lacking. Art. 229 CP punishes anyone who, intentionally or through negligence, breaches the recognised rules of the trade during construction or site management if this endangers the life or physical integrity of persons. For the builder of ventilation systems, this obligation implies handing over a complete operating file specifying access constraints and cleaning requirements.
- Acceptance and verification of accessCheck that each access door can be operated, that neoprene or high-temperature silicone sealing gaskets are present, and that there are no physical obstacles in front of the hatches.
- Handover of the maintenance recordProvide the operator with a diagram locating the hatches, the technical data sheets of the filters and the intervention instructions detailing the permitted alkaline products.
- Setting up the cleaning logPut into use the maintenance log recording the dates of intervention, the thickness of the deposits found and the signature of the specialist company.
- Greasy duct
- Extract air duct loaded with cooking oil vapours, subject to a permanent risk of internal combustible deposits and classified as a fire risk according to the AEAI fire protection directives.
The degreasing interval depends on the type of cooking appliances. A rotisserie, intensive frying or wok cooking installation requires chemical or steam stripping of the duct at least every six months, compared with once a year for a reheating kitchen. The filters of the grease separator under the hood must be machine-washed weekly by the kitchen staff. The operator remains legally responsible for keeping the technical fire safety installations in working order.
Grease separation at source and air-flow continuity of the system
Prevention of duct fires starts at the capture point in the professional kitchen. Air loaded with oil vapours, aerosols and volatile organic compounds enters the hood or filter ceiling at temperatures often between 40 and 80 °C. If these particles reach the extraction duct without prior separation, they are deposited by condensation on the cold sheet metal walls, forming a layer of saponified, highly flammable grease over the full height of the building.
- Baffle grease separator
- Removable stainless steel device placed at the hood inlet. It forces the airstream to make sharp, continuous changes of direction, causing the impact and mechanical separation of the oil droplets by centrifugal action before they enter the duct system.
Capture efficiency depends directly on the profile of the filter media. Simple metal mesh filters retain the larger splashes but clog quickly, creating excessive resistance that makes the extraction flow rate drop. Stainless steel chevron or labyrinth separators are preferred because they maintain a stable pressure drop while draining the greasy condensate towards the hood's collection channels. Upstream of the fan, additional filtration by impact or ultraviolet radiation further limits the passage of particles to the vertical shaft.
The horizontal system must have reinforced tightness of class C at minimum, made with smooth folded or welded ducts in black sheet steel of at least 1.5 mm or in 1.0 mm stainless steel. Conventional socket joints with self-drilling screws are to be avoided: any screw tip penetrating into the flow is a starting point for the accumulation of organic matter and an obstacle during rotary mechanical brushing.
Positioning of access hatches and operating obligations
Inaccessibility of horizontal sections or changes of direction turns the system into an invisible trap. From the design of the route, in coordination with the other trades, the builder of ventilation systems must reserve sufficient clearances to handle the sweeping, active-foam degreasing or high-pressure scraping tools.
| Duct location | Maximum interval | Hatch type required | Site installation constraint |
|---|---|---|---|
| Straight horizontal section | 3.00 m to 5.00 m | Tight hatch with neoprene or high-temperature silicone gasket | Direct access from below or from the side with 500 mm clearance |
| Change of direction (> 45°) | At every bend | Removable curved or flat liquid-tight panel | Positioned on the inner or outer curve, outside the accumulation zone |
| Foot of vertical riser | At the base of the shaft | Tight bottom plug with threaded drain valve | Connection to a drain tank for the degreasing liquids |
| Passage through a fire-rated technical shaft | Opposite each shaft hatch | Fire-rated access door, EI rating equivalent to the structural work | Strict alignment with the hatch of the air duct |
- Fitting the hatch on the ductCut the opening to the exact dimensions of the manufacturer's template. Deburr the cut edges carefully. Fit the tight frame with its oil-resistant elastomer gasket without perforating the casing with uncrimped through-fixings.
- Coordination with the false ceiling and the casingsCheck that the removable tiles or plasterboard panels under the system correspond exactly to the plumb line of the ventilation hatches. In a masonry or plasterboard-lined shaft, fit a fire-rated EI access panel ensuring direct access to the clamping nuts of the inner duct.
- Handover of the maintenance diagramPrepare the as-built drawing showing all the numbered hatches, their dimensions and their level. This diagram is included in the as-built documentation and displayed in the ventilation plant room or near the hood control panel.
At installation acceptance, the record must explicitly mention the check of the actual opening of each hatch without dismantling third-party equipment. If an unforeseen structural obstacle blocks the passage of a sweeping rod, the installer reports this access defect to site management so as to avoid any liability in the event of a later fire.
Handling access disputes and findings of critical fouling
On the construction site as well as during operation, the builder of ventilation systems regularly encounters configurations where physical access to the greasy system becomes impossible. Spatial conflicts in false ceilings are frequent: a cable tray or sanitary pipework installed afterwards in front of an access panel blocks the passage of the sweeping tools. Once the maximum spacing or the direct access provided for by the AEAI fire protection directives can no longer be guaranteed, the installer must formally notify the problem in writing to the site manager. If the obstacle is not removed, issuing express reservations at the acceptance of the work, relying on standard SIA 118, releases the company from the warranty for the sections that have become inaccessible.
- Visual and photographic survey of blind spotsLocate blocked hatches, bends without a rodding opening and the condition of the grease-tight sealing gaskets.
- Air-flow non-conformity reportDraw up a documented opinion recalling that the absence of regular cleaning turns the duct into a vertical heat propagation vector.
- Formal notice to remedySend the operator the technical recommendations: creation of additional tight hatches or rework of the plenums by the secondary trades.
The criminal liability of the operator remains fully intact as regards keeping its extraction in working order. The ventilation installer cannot be held responsible for a fire if their inspection plans clearly indicated the location of the required openings and if the maintenance record showed the establishment's inaction in the face of the accumulation of greasy sludge.
Frequently asked questions
What should be done when an access hatch is hidden by another trade?
The installer must notify site management of the situation immediately by written notice accompanied by photos. The AEAI fire protection directives require accessible cleaning hatches along the entire length of the greasy duct. If the obstacle is not moved by the trade concerned, the ventilation company records a formal reservation in the acceptance record in accordance with standard SIA 118 in order to discharge its liability in the event that rodding is impossible.
Who bears legal responsibility if an extraction duct catches fire?
From acceptance of the installation, responsibility for maintenance lies with the operator of the establishment. The operator must ensure regular degreasing of the system and record each operation in the safety log. The ventilation installer's liability can be engaged only if it is proved that an original design defect, such as a lack of required hatches, a wrong slope or a non-tight duct, prevented mechanical cleaning from being carried out.
Why are conventional fire dampers prohibited in a kitchen duct?
The air extracted from a professional kitchen is heavily loaded with oil vapours and greasy aerosols. A standard fire damper would have its release mechanism, axis and blade quickly fouled by sticky residues, causing it to jam or to trip unintentionally. To pass through fire compartments, the AEAI fire protection directives require a continuous, tight fire-rated duct up to the roof or specific protective dampers tested for greasy extraction.
What is the value of the hood grease separator in fire prevention?
The baffle grease separator installed in the hood acts as the first thermal and mechanical barrier. By stopping most of the oil droplets before the vertical duct, it prevents the rapid accumulation of fuel in the duct. If these metal filters are cleaned every week, the internal fire load of the system remains low. Their deterioration or removal immediately turns the extraction duct into a flammable wick running through the floors.
Texts and standards cited
- Directives incendie AEAISwiss fire protection requirements for thermal and air-handling installations
- Norme SIA 118General conditions for the execution of construction work and handling of reservations at acceptance