Key takeaways
- Keep a minimum distance of eight metres between the discharge and the air intake on a roof.
- Place the fresh-air intake at least three metres above the finished, accessible ground level.
- Orient the fresh-air intake to face the prevailing winds to avoid drawing in exhaust plumes.
- Always keep intake grilles away from chimneys, car parks, waste collection points and cooling towers.
Position the discharge and the air intake so as to rule out any air short-circuit
An exhaust-air discharge placed in the immediate vicinity of a fresh-air intake causes systematic recirculation of gaseous pollutants, odours and humidity into the air-handling unit. This air short-circuit phenomenon degrades the hygienic quality of the supply air and renders the fine filters useless, as they cannot handle these concentrations. To prevent this risk of slow poisoning of the occupants, SIA 382/1 sets precise rules for geometric positioning. The arrangement depends on the classification of the air flows according to their degree of contamination, the extracted volume flow rate and the dispersion characteristics of the outdoor grilles.
| Exhaust-air category | Nature of the effluents | Horizontal discharge at the facade | Recommended minimum separation |
|---|---|---|---|
| ETA 1 (unpolluted) | Offices, meeting rooms, circulation areas | Permitted without major restriction | 2 m from the fresh-air intake |
| ETA 2 (slightly polluted) | Building toilets, changing rooms | Tolerated subject to velocity conditions | 5 m or discharge above the ridge |
| ETA 3 (heavily polluted) | Commercial kitchens, battery-charging rooms | Prohibited unless technical derogation | Minimum 8 m with vertical discharge at roof level |
| ETA 4 (laden with toxic pollutants) | Laboratory fume hoods, process fumes | Prohibited at the facade | 10 m with high-velocity ejection outside the zone of influence |
On a flat roof, the exhaust-air discharge must be expelled vertically upwards through a vertical discharge outlet, with an exit velocity between 5 and 9 m/s. This dynamic plume passes through the aerodynamic sub-layer of the roof and disperses the effluents above the turbulence zone of the building. Conversely, a fresh-air intake draws in ambient air at low velocity, generally between 1.5 and 2.5 m/s through a rain-protection grille, to avoid carrying in water droplets and heavy particles. If the discharge and the intake are on the same roof level, the minimum diagonal distance prescribed by SIA 382/1 must reach eight metres for flow rates above 0.5 m³/s of category ETA 2 or ETA 3 air.
Heights above ground, distances to openable windows and neutralisation of external pollution
The location of the fresh-air intake must ensure that the purest possible air is drawn in from the immediate surroundings of the building. Drawing air in at ground level exposes the duct network to heavy loads of mineral dust, pollen, exhaust gases heavier than air such as nitrogen dioxide, and in some regions radon emanating from the subsoil. The minimum height of an air intake on a facade is set at three metres above the finished ground or the roadway. This elevation also protects the grille from brine splashes during winter salting and prevents blockage by snow piling up at the foot of the building.
The proximity between ventilation terminals and the openable parts of the envelope follows a strict logic of hygiene and acoustic comfort. An exhaust-air discharge from a kitchen or toilets located less than three metres from a bedroom or office window causes direct odour nuisance when the windows are opened. In addition, the ventilation installer must analyse the orientation of the facades in relation to the regional prevailing winds. The fresh-air intake should preferably be installed on a facade subject to regular wind overpressure, while discharges are preferably positioned on leeward walls, in an aerodynamic low-pressure zone, which facilitates the dispersal of plumes.
- Chimneys and boiler rooms: maintain a separation of at least eight metres and place the air intake below the flue outlet.
- Cooling towers and dry coolers: keep outdoor-air intakes away to rule out any risk of drawing in water aerosols.
- Car parks and logistics areas: keep the intake at least eight metres away from any access ramp or lorry unloading bay.
- Ventilation stacks of sanitary drainage stacks: keep the outlets at least five metres from any fresh-air intake grille.
Calculation of separation distances and roof aerodynamics according to SIA 382/1
Positioning an exhaust-air outlet in the immediate vicinity of an outdoor-air intake directly exposes the ventilation installer to serious operating complaints: cross-contamination of the hygienic air, transmission of odours and accelerated fouling of the fine filters of the air-handling unit. SIA 382/1 defines strict geometric and aerodynamic criteria to prevent recirculation of the exhausted air, whether the installation is configured on a flat roof or integrated into a technical facade.
The separation distance between the intake and the discharge is not measured solely as a straight line along the ground, but by taking into account the trajectory of the discharged air plume and the suction cone of the intake grille. When the discharge and the intake are on the same horizontal plane or on the same facade, a simple breeze instantly pushes the extracted air back towards the intake if the exit velocity is too low or if the orientation underestimates the prevailing winds.
| Exhaust-air category | Nature of the connected rooms | Minimum distance to the air-intake plane | Required discharge configuration |
|---|---|---|---|
| Clean extract air (ETA 1) | Offices, meeting rooms, circulation areas | 2.5 m to 4 m | Low-velocity wall grille or simple roof cowl |
| Moderately vitiated air (ETA 2) | Toilets, changing rooms, cleaning rooms | 5 m to 8 m | Outlet oriented away from the prevailing winds |
| Heavily laden vitiated air (ETA 3) | Commercial kitchens, laundries | 10 m to 15 m | High-velocity vertical discharge (minimum 5 m/s) outside the stagnation zone |
| Very heavily polluted vitiated air (ETA 4) | Laboratory fume hoods, covered car parks | At least 20 m | Forced vertical ejection above the highest ridge |
On a flat roof, parapets and lift motor-room structures create aerodynamic shadow zones and vortex recirculations. Placing an air intake at the foot of a stairwell wall, where a low-pressure zone forms under the prevailing wind, guarantees the intake of all stagnant effluents. The exhaust-air discharge stack must absolutely blow upwards at an ejection velocity between 5 m/s and 8 m/s, in order to break through the aerodynamic boundary layer of the building and expel the plume beyond the suction envelope.
Coexistence on the envelope: external pollution sources and regulatory heights
The fresh air entering the air-handling unit must not only be protected from its own discharges: it must be isolated from the many point sources of pollution scattered across the facades and roofs. Wood or oil chimney flues, vents of sanitary drainage stacks, evaporative cooling towers and underground garage access ramps are emission points for gaseous effluents, volatile organic compounds or airborne pathogens.
- Flues and chimneys: minimum distance of 5 m horizontally, and the air intake must absolutely be at least 2 m below the flue outlet.
- Sanitary vents (pressure relief of waste-water stacks): minimum distance of 3 m from any fresh-air grille; absolute prohibition on placing a vent upwind of the intake under the prevailing winds.
- Parking ramps and busy roads: raise the air-intake grille at least 3 m above the finished ground to avoid heavy dust and carbon monoxide.
- Open cooling towers: a separation of at least 15 m is mandatory in order to rule out the biological risk of legionella carried by droplet plumes.
The geometric height above accessible surfaces and landscaped ground directly protects the duct network from physical pollutants at ground level. The lower flashing of a fresh-air intake grille on a facade must never be positioned less than 2 m above the finished ground or the average snow level in the Alpine region. On a gravelled or green flat roof, the lower edge of the grille or intake plenum must be at a minimum height of 50 cm above the wearing layer, thus avoiding the intake of substrate dust, pollen and splashes from driving rain.
- Positioning check on drawings and on the slabLocate the civil engineer's openings for the intake and the discharge. Measure the actual linear distance and check the relative levels, taking into account the thickness of the waterproofing and insulation build-up.
- Checking adjacent technical outletsIdentify on the roof plan the sanitary ventilation stacks, commercial kitchen hood outlets and chimney flues. Note any conflict of immediate proximity.
- Coordinating the discharge directionOrient the discharge ducts vertically upwards through a watertight upstand. Install a long-radius bend or a conical ejection nozzle to ensure the discharge velocity outside the turbulence zone.
- Reporting geometric inconsistenciesWhere the execution drawings place an air intake below a discharge or less than two metres from a pollution source, notify the site management before starting the installation of the plenums.
Handling positioning non-conformities and technical remedies
On the construction site, the ventilation system installer sometimes finds openings planned in the structural work that do not comply with the separation distances prescribed by SIA 382/1. If an opening places the air intake less than two metres from the discharge or directly above an underground car park ramp, the installer must report the anomaly to the site management before any rigid ducts are installed.
- Recording centre distances and sourcesUse a laser rangefinder to measure the distance between the axes of the facade openings or roof stacks. Record the location of sanitary vents, stack outlets of drainage stacks and neighbouring flues.
- Written notification of the airflow riskSend a formal report to the HVAC engineer and the site management. Describe the risk of re-entrainment of pollutants and request a change to the duct routing or the relocation of an outlet.
- Implementing compensatory measuresIf the opening in the reinforced concrete cannot be moved, extend the external network with a rigid vertical duct, add a roof stack with a vertical jet or insert a reinforced filtration box.
Where an air short-circuit is found during acceptance airflow tests with smoke generators, the installation is deemed non-compliant. Under art. 368 CO, the client may demand rectification of the work if the work is defective. A discharge duct redirected away from the prevailing winds or raised above the parapet level restores hygiene without requiring replacement of the air-handling unit.
Frequently asked questions
Can the fresh-air intake and the discharge be combined in the same basement light well?
This arrangement is prohibited without a certified watertight vertical and horizontal partition. The extract air accumulates in the masonry pit and the air intake continuously re-draws this vitiated air. Moreover, the bottom of the light well collects dead leaves, moisture and heavy exhaust gases. The two functions must be separated into two distinct light wells spaced in accordance with SIA 382/1 to avoid any microbial contamination.
What is the minimum distance to be observed between a fresh-air intake and a sanitary drainage stack on the roof?
The fresh-air intake must be located at a minimum distance of three metres from any sanitary vent, or be placed at least one metre below the vent outlet if the horizontal distance is reduced. On a flat roof, primary ventilation gases contain sulphur compounds and bioaerosols. If the prevailing wind pushes the vent towards the intake, raising the stack becomes essential to eliminate odours.
How should the discharge be oriented on a flat roof to avoid recapture by the air intake?
The recommended solution is to eject the extract air vertically upwards at an exit velocity between five and ten metres per second using a stack or a dynamic ejection cowl. The fresh-air intake will be installed low down, facing the prevailing winds and protected by a rain hood fitted with a vermin screen that can be removed for periodic cleaning.
What should be done if the fresh-air intake on a facade faces directly onto a busy road?
The air intake should be raised by at least one storey to move away from ground-level exhaust gases, or the intake should be moved to the rear facade of the building, on the side of an open courtyard. If the architectural layout blocks the routing, installing a coarse pre-filtration stage followed by an activated carbon filter in the air-handling unit compensates for the degraded quality of the incoming air.
Texts and standards cited
- SIA 382/1Ventilation and air-conditioning installations - General principles and required performance for air intake and discharge
- CO art. art. 368 COClient's rights in the event of defects in the work: rectification, price reduction, rescission or damages
