Key takeaways
- A counter-flow connection guarantees the temperature difference needed for nominal output.
- A parallel-flow (co-current) connection degrades heat exchange and reduces output by about a third.
- Air vents at high points and drains remain accessible from outside the casing.
- The frost capillary covers the entire face of the coil in order to stop the unit.
Connect the coil in true counter-flow and ensure venting
In an air handling unit, the heating coil transfers energy from the secondary hydraulic network to the fresh or mixed airflow. The ventilation system installer must strictly observe the physical principle of true counter-flow: the hottest water, coming from the heating flow, must enter on the side where the air is hottest, i.e. at the downstream outlet of the airflow. The cooled water leaves on the upstream side, facing the incoming cold air. This crossing of the flows maintains a constant temperature difference between the two fluids over the full depth of the heat exchanger.
Air trapped in the copper tubes forms a pocket that blocks the circulation of the fluid and insulates the aluminium fins. A section not supplied with hot water freezes within seconds in an outside airflow at sub-zero temperature. The high points of the manifolds must be fitted with an air vent, manual or automatic, relocated outside the insulated casing envelope so that it can be checked without opening the inspection doors under pressure.
| Component | Required location | Installation constraint and accessibility |
|---|---|---|
| Air vent | Highest point of the manifold | Clear of the insulation, quarter-turn isolation valve upstream |
| Drain valve | Low point below the level of the tubes | Threaded connection with plug, accessible for a flexible hose |
| Flexible connectors | Between casing and piping | Absorb expansion without transmitting force to the tubes |
| Thermowell | Water return manifold | Immersed in the centre of the flow, immersion sensor with thermal paste |
Under art. 364 CO, the contractor is liable for his work and procures the necessary means and tools. The ventilation fitter installs the flanges, gaskets and threaded connections without exerting any mechanical stress on the copper tubes passing through the sheet-metal casing. Flexible connectors or expansion sleeves prevent the welds from breaking under the vibrations of the fan motors.
Install the frost thermostat and validate the full shutdown sequence
A heating coil exposed to unheated outside air is at risk of destructive freezing when a pump stops, a valve is closed or temperature stratification occurs in the casing. Water stagnates in the thin-walled tubes; from the first night at minus ten degrees, freezing bursts the copper bends immediately and floods the unit. The mechanical frost-protection safety chain is the mandatory line of defence of the ventilation installer.
- Mechanical installation of the frost capillaryUnroll the capillary tube in a serpentine pattern over the entire rear face of the coil, on the heated treated-air side, at a distance of 50 to 100 mm from the fins. Fix the capillary with clips or specific fasteners on the tubes, never pinching or crushing the copper tube so as not to block the expansion gas.
- Uniform coverage of the airflowDistribute the loops so as to cover every sector of the air passage, paying particular attention to the lower corners of the casing, areas known to be sensitive to stagnant ice-cold air and poor mixing.
- Wiring of the dry safety contactConnect the changeover contact with positive opening to the safety chain wired for direct cut-out, independently of the control bus or the digital control programme.
- Setting the set-point thresholdAdjust the mechanical switching point between +4 °C and +6 °C on the graduated scale of the housing, locking the setting with the sealable cover to prevent any unauthorised change.
The actual test of the frost protection is recorded in a report before commissioning. Art. 3 OPA requires the employer to take the protective provisions and measures that comply with the recognised rules of technology. On the construction site, the technical team applies a refrigerant aerosol spray or a bag of ice-cold water to at least 20 centimetres of the sensing capillary.
- Check the immediate cut-off of the fan run signal without software delay.
- Check that the fresh-air damper actuators return to the zero position by mechanical spring.
- Measure the forced opening of the three-way valve or of the coil circulation pump.
- Validate the requirement for a manual reset on the thermostat housing before restart is permitted.
Checking flow direction and accessibility of venting devices
A hot-water heating coil connected in true counter-flow guarantees the heat transfer calculated by the engineer by maintaining a maximum temperature difference between the water and the airflow over the full depth of the heat exchanger. A crossing error on the connections reverses this arrangement into parallel flow: the hottest fluid enters on the side of the coldest air. This installation defect causes a drop in useful thermal output that can exceed 30 %, while also distorting the control of the modulating valve, which opens fully without ever reaching the required supply-air set point during winter peaks.
| Parameter measured or observed | Compliant installation (counter-flow) | Reversed installation (parallel flow) | Consequence for the installation |
|---|---|---|---|
| Hot water inlet | Treated-air outlet side (downstream of airflow) | Fresh-air inlet side (upstream of airflow) | Reduced logarithmic mean temperature difference |
| Cooled water outlet | Cold-air inlet side (upstream of airflow) | Treated-air outlet side (downstream of airflow) | Thermal efficiency drop of 25 to 35 % |
| Upstream surface temperature | Low (water at the end of its path) | High (water straight from the flow) | Risk of thermal shock and freezing at the downstream outlet |
| Behaviour of the control valve | Stable, gradual modulation | Permanently 100 % open in severe cold | Unable to reach the supply-air set point |
Diagnosis is carried out in the field with a contact thermometer or a thermal camera when the unit is brought up to operating conditions. The installer measures the temperature on the supply pipe and checks that it enters the row of tubes located furthest downstream in relation to the direction of airflow. If the hot manifold is on the side of the mixing box or the fresh-air intake, the hydraulic crossing is confirmed. Under art. 364 CO, the contractor carries out the work with care; he must report this non-conformity to the CFC 241 heating fitter before the insulation is installed so that the connection sleeves can be reversed.
Residual air in the upper hairpin bends reduces the cross-section available to the fluid, generates cavitation noise and creates dead zones with no flow that are prone to local icing. The ventilation system installer makes sure that the manual air vents located at the high points of the manifolds remain accessible without heavy tools. When the coil is entirely enclosed in the insulated casing envelope, the vent tubes and the drain valves at the low point must be extended outside the sandwich panels. The drain cocks allow complete gravity drainage of the tube bundle in the event of winter intervention or prolonged shutdown.
Testing the frost protection chain and safety kinematics
The capillary frost safety thermostat is the last physical barrier protecting the copper tubes against mechanical rupture caused by water freezing. A section of a few centimetres of tube exposed to a thread of sub-zero air is enough to trigger the sensing element. The functional test cannot be limited to an electrical simulation by bridging on the terminal block of the cabinet: it requires an actual thermal trip on the capillary before final commissioning of the installation.
- Preparing the unit in operationStart the ventilation unit in comfort mode with the nominal temperature set point. Check the normal rotation of the supply fan and the opening of the motorised outside fresh-air damper.
- Targeted cooling of the capillaryOpen the access door downstream of the coil. Spray a test refrigerant aerosol onto a loop of the capillary tube fixed against the rear face of the heat exchanger, until the temperature locally drops below the trip threshold set at 5 °C.
- Visual check of the safety shutdown sequenceTime the switching of the thermostat's dry contact. Check the immediate stop of the supply fan motor, the switching to 100 % of the hot-water control valve command and the hold command for the coil circulation pump.
- Checking the tight closure of the damperCheck that the spring-return actuator presses the fresh-air damper blades against their seals in less than 30 seconds, cutting off any natural thermal draught from outside the building.
- Mechanical reset testWait for the capillary to warm up. Check that the unit remains in alarm and refuses any restart until the manual reset button of the thermostat has been physically operated by the operator.
The test report records the date of the thermal test, the timed mechanical closing delay of the outside damper and the state of the hydraulic interlocks. This traceability confirms that the equipment provides physical protection of the installation before the first frosts arrive in sheltered areas.
Handling faults: reversed flow, frost alarm and tube bundle rupture
During air balancing tests, an insufficient temperature difference on the supply air despite a nominal water flow almost always indicates a parallel-flow connection. The hydraulic reversal deprives the heat exchanger of its optimal gradient, causing a loss of thermal output of around 30 %. The ventilation system installer must spot the anomaly with a contact thermometer before acceptance: the hot-water inlet manifold must cross the hottest air, and therefore be located downstream in relation to the airflow.
- Making safe during a frost alarmCheck the shutdown sequence: power cut to the supply fan motor, complete closure of the spring-return fresh-air damper in less than twenty seconds and forced-opening command to the coil control valve.
- Locating faults and emergency drainingOpen the upstream and downstream access doors. If there is water or copper tubes deformed by freezing, isolate the unit's hydraulic shut-off valves, open the drain cocks at the low point and operate the manual air vents.
- Repair and leak-tightness testCoordinate the intervention with the heating fitter to repair or replace the damaged coil. Art. 364 CO governs the contractor's liability for the careful execution of his work during the installation and testing phases.
If the tube bundle has been frozen without visible bursting, a pressure test at the network's service pressure is required before the unit is switched on again. The reset of the frost protection on the thermostat housing must never be automated: it requires a complete visual inspection of the exchange face and of the condensate collection tray.
Frequently asked questions
How can you quickly identify a coil connected in counter-flow or parallel flow on the construction site?
Measure the temperature on the hot-water supply pipe and compare it with the direction of the airflow through the casing. In true counter-flow, the hottest water enters on the side where the air leaves the coil. The cooled water leaves on the side where the cold fresh outside air enters. If the inlet tube is on the upstream face of the airflow, the installation is reversed into parallel flow.
What method should be used to actually test the frost thermostat without waiting for winter?
Use a technical freezing aerosol spray or apply a cold pack to a loop of the capillary, on the cold-air side upstream of the coil, while the unit is running at nominal flow. The dry contact must switch instantly: the supply fan must stop, the fresh-air damper must close and the heating valve must open to 100 %.
Why install an automatic air vent with an isolation valve at the high point of the coil?
An air pocket trapped in the upper tubes reduces the heat exchange cross-section and blocks the passage of hot water. The unprimed zone freezes very quickly in sub-zero outside air. The automatic isolation valve makes it possible to replace the air vent cartridge without having to drain the entire hydraulic circuit of the air handling unit.
What temperature set point should be applied to the capillary frost thermostat?
The mechanical set point is generally adjusted between 4 °C and 6 °C on the housing's setting scale. This value compensates for the thermal inertia of the copper and the uneven mixing of the fresh air. A lower threshold increases the risk of localised freezing in the event of stratification, while a setting above 7 °C causes unjustified nuisance trips.
Texts and standards cited
- CO art. 364obligations of the contractor: liability subject to the same rules as that of the employee; he carries out the work in person or under his personal direction; unless custom or agreement provides otherwise, he procures at his own expense the means, equipment and tools required.