🧱 CFC 244Air requirements, flow rates and sizingChapter 1 of 10 in the section

How much air per room: living room, bedrooms, kitchen and wet room

This chapter describes the method for sizing the airflow of a dwelling with controlled mechanical ventilation under Swiss rules. You will learn how to calculate the supply flow rates in the living areas, set the extraction rates in wet rooms, balance the overall air balance of the unit and size the air passage openings under doors to avoid whistling.

Key takeaways

  • Fresh air is always supplied to the bedrooms and the living room, never to the corridors.
  • Stale air is extracted from kitchens, bathrooms, showers and toilets to capture odours at source.
  • The total extraction balance must strictly match the overall supply volume within the building envelope.
  • Undercutting interior doors ensures air transfer without troublesome acoustic pressure loss.

Calculating flow rates according to room use and balancing the air balance

In residential balanced (supply-and-extract) ventilation, air distribution is not calculated in proportion to floor area. The sweeping principle relies on a clear separation of functions: bring fresh air where the occupants stay and sleep (habitable or dry rooms), then extract the stale air laden with moisture and odours where the water points and cooking appliances are (wet rooms). Corridors, entrance halls and internal stairwells serve only as transit zones.

Air renewal in living spaces must ensure the removal of moisture loads and indoor pollutants while maintaining a hygienic air quality suited to the occupancy rate.

norme SIA 382/1

For supply rooms, standard SIA 382/1 and Swiss professional recommendations set a hygienic basis of 30 m³/h per foreseeable occupant at nominal operation. In a single bedroom, the fresh air flow rate to provide is 30 m³/h. For a master bedroom or double bedroom, the network is sized for 60 m³/h. In the living room, where metabolic loads vary during the day, a flow rate of 45 to 60 m³/h is generally adopted for a standard dwelling, adjusted according to the type of apartment (from 2.5 rooms to 5.5 rooms).

Reference values for nominal supply and extraction flow rates in dwellings
Room useAirflow functionUsual nominal flow rate (m³/h)Sizing criterion
Single bedroomSupply30Basis: 1 occupant (30 m³/h per person)
Master bedroomSupply60Basis: 2 occupants
Living room / Dining roomSupply45 to 60Daytime occupancy volume
Closed or open kitchenExtraction45 to 60Capture of moisture and cooking pollutants
Bathroom with WCExtraction45Removal of steam and odours
Shower room onlyExtraction30Moisture removal
Separate WCExtraction20 to 30Control of odour transfer

Once the extraction requirements have been totalled and the supply requirements added up, the installer checks the overall balance of the dwelling. An airtight building tolerates no marked imbalance. If the total extraction required by the wet rooms exceeds the volume calculated for supply, the fitter must raise the fresh air flow rates in the bedrooms and living room proportionally to achieve perfect equality. Conversely, if the total supplied exceeds the minimum sanitary extraction, the surplus extraction is distributed primarily to the kitchen or the main bathroom in order to guarantee a sufficient extraction flow rate per wet room to prevent any risk of condensation.

Ensuring air transfer between rooms and sizing the passage under doors

The operation of a sweeping-type installation relies entirely on the continuity of the airflow path: the fresh air supplied to a bedroom must circulate freely towards the corridor to reach the extraction terminals of the wet room or kitchen. When interior doors are closed, this air transfer through the doors must take place through a gap left at the bottom of the joinery or through acoustic transfer grilles built into the partitions.

Door undercut
Trimming or mechanical clearance of the lower part of an interior door leaf, creating a calibrated gap between the bottom rail and the finished floor covering to allow air to pass.

To size the undercut correctly, good practice requires keeping the air velocity under the door leaf below the critical threshold of 1.5 m/s. Above this velocity, the air constriction produces a whistling sound audible at night, increases the overall pressure loss of the circuit and slows the air renewal of the bedroom. For a supply flow rate per dry room of 30 m³/h (single bedroom), a free passage area of at least 70 cm² is required. On a standard door with a clear passage width of 80 cm, this corresponds to a gap under the door of at least 10 mm after the final parquet or tiles have been laid.

  • Single bedroom (flow rate 30 m³/h): minimum undercut of 10 mm on a door 80 cm wide.
  • Master bedroom (flow rate 60 m³/h): minimum undercut of 15 mm to 20 mm, or installation of an acoustic door-bottom seal with air baffle.
  • Bathroom (flow rate 45 m³/h): minimum undercut of 12 to 15 mm on a door 70 or 80 cm wide.
  • Isolated toilet (flow rate 20 to 30 m³/h): standard undercut of 10 mm is sufficient to ensure the transit flow rate.

Where sound comfort requirements between rooms rule out a visible gap under the door, the fitter must provide specific transfer passages: extra-flat baffled partition silencers or technical sound-transfer skirting boards. These elements allow air to pass with a pressure loss of less than 5 Pa while maintaining the required sound reduction index between the bedroom and the circulation area.

Room-by-room allocation: nominal and peak flow rates according to SIA 382/1

The airflow sizing of a dwelling is not based on an overall volumetric average applied uniformly to the habitable floor area. Under the principles of standard SIA 382/1, the allocation of fresh air volumes strictly follows the intended use of the spaces: fresh air is supplied primarily to the living rooms where the occupants stay, while stale air is extracted at the sources of moisture and odours. This methodical sweeping prevents any stagnation and ensures effective dilution of carbon dioxide without needlessly over-ventilating secondary spaces.

For the supply flow rate per dry room, the reference value of 30 m³/h per occupant governs the setting. A single bedroom requires a supply of 30 m³/h, raised to 60 m³/h for a double master bedroom. In the living room, where the occupancy volume varies greatly, the flow rate is adjusted between 45 and 90 m³/h depending on the type of apartment. The position of the supply terminals must promote the Coanda effect at the ceiling or project an air stream away from the direct occupancy zone to prevent any perceptible draught.

Set values for supply and extraction flow rates in residential ventilation
Room designationType of flowBase rate (m³/h)Peak rate (m³/h)Airflow positioning criterion
Single bedroomSupply (dry room)20 to 2530Ceiling or transom opposite the door, jet towards the centre
Double bedroomSupply (dry room)40 to 5060Ceiling, radial diffusion at low velocity (< 0.15 m/s)
Living room / Dining roomSupply (dry room)45 to 6075 to 90Quiet zone, opposite the passage to the kitchen
Closed or open kitchenExtraction (wet room)40 to 4560 to 100Ceiling, as close as possible to the hob, away from stray draughts
Bathroom with WCExtraction (wet room)30 to 4060High zone above the bath or shower, outside electrical zone 1
Cloakroom (WC only)Extraction (wet room)20 to 2530Ceiling above the WC pan, direct capture of odours

The extraction flow rate per wet room must ensure rapid clearing during peaks of pollutant production. In the kitchen, the base extraction keeps the dwelling under local negative pressure to contain greasy vapours. During cooking, switching to high flow (up to 100 m³/h) compensates for the absence of a direct-discharge hood, which is prohibited in a standard balanced-ventilation monobloc unit without a dedicated balancing system. In wet rooms, the peak extraction removes saturated steam before it condenses on cold surfaces.

Transit airflow: managing flow rates under doors and acceptance on the construction site

The circulation of the air volume between the supply zones and the extraction zones necessarily passes through the horizontal circulation routes. Air transfer through doors is the most frequent weak link in residential networks. When the door of a bedroom or toilet is closed, the flow must pass under the leaf without exceeding an air velocity of 1.0 m/s to 1.5 m/s, in order to avoid any acoustic whistling and any overpressure that would slow the supply flow rate.

For a standard interior door with a passage width of 80 cm, a clear undercut of 10 mm frees a passage area of 80 cm², which allows an air transfer of about 30 m³/h with a passage velocity below 1.1 m/s. As soon as the supply flow rate per dry room reaches 60 m³/h (master bedroom), an undercut of 15 mm becomes essential, or the installation of an acoustic transfer grille built into the transom or the partition if the sound insulation requirements rule out a gap under the door.

Commissioning requires measuring each terminal flow rate using a measuring hood combined with a vane or hot-wire anemometer, starting with the most disadvantaged extraction terminals. The diaphragm dampers or adjustment collars built into the plenums are adjusted in turn. Once the nominal flow rates are set, the fitter checks that there is no excessive negative pressure with doors closed: the pressure difference between the dry rooms and the corridor must not exceed 2 Pa, ensuring that doors can be operated without resistance and that air renewal complies with the technical design.

Resolving balancing disputes and airflow non-conformities

On construction sites for collective or individual housing, balanced-ventilation malfunctions commonly appear at commissioning or as soon as the tenants move in. Complaints mainly concern whistling at the interior joinery, sensations of cold draught in the living room or the persistence of kitchen odours in the bedrooms. Faced with these findings, the ventilation fitter must proceed methodically to identify the physical origin of the problem without altering flow rates at random.

The first check concerns the overall negative or positive pressure of the dwelling. If the extraction flow rate exceeds the supply capacity, the building goes into excessive negative pressure. Outdoor air infiltrates through defects in the airtightness of the envelope, creating local thermal bridges and parasitic noises. Conversely, positive pressure pushes indoor moisture back into the window frames. The setting of the constant flow regulators or balancing dampers should be checked using a calibrated measuring hood, and the readings then compared with the flow rate table of standard SIA 382/1.

When the flows at the terminals comply with the nominal values but a shrill whistle occurs when bedroom or toilet doors are closed, the transit airflow is faulty. The free passage area under the door is then insufficient to absorb the transferred air volume without generating excessive pressure loss. If the joiner has fitted door leaves with a gap smaller than the required 7 to 10 millimetres, or if the laying of a thick carpet has blocked the door undercut, the ventilation installer must not throttle the extraction from the wet room to mask the noise.

If the door undercut cannot be planed because of contractual acoustic criteria between living spaces, fitting air transfer silencers or baffled acoustic grilles in the lightweight partitions is required as a technical variant. The contractor then applies art. 365 al. 3 CO by informing the client that the air circulation conditions prevent the proper operation of the installation according to standard SIA 382/1. A joint measurement report protects the ventilation company before the acceptance of the work.

Frequently asked questions

How should you react if the joiner refuses to plane the bottom of the doors?

The free passage under the door is an integral part of the airflow circuit. If the undercut is insufficient, the air no longer reaches the extraction terminals, the pressure rises and the flow rates drop. The installer records this obstruction in the site diary. The palliative solution is to install acoustic wall transfer terminals above the door sets, with the agreement of the site management.

Why do kitchen odours sometimes migrate to the master suite?

This defect indicates a breakdown of the sweeping principle. The kitchen extraction is either undersized or restricted by a stuck damper, while the bedroom supply is overestimated. If the recirculating hood operates without sufficient air extraction, the pollutants spread into the buffer zone of the corridor. The relative pressures must be remeasured and the terminal dampers recalibrated.

Can a bathroom extraction terminal be set below 40 m³/h?

No, a peak extraction flow rate below 40 m³/h in a bathroom with a bath or shower prevents the rapid removal of peaks in relative humidity. This causes surface condensation on cold walls and promotes mould growth. Lowering this flow rate to mask a flow noise is a clear airflow defect under Swiss professional rules.

How should supply be handled in a large open living room with an adjoining kitchen?

In an open space, the supply diffusers are placed on the lounge or dining side, as far as possible from the cooking area. Extraction is confined to above the kitchen. The natural sweep thus guides clean fresh air towards the living area before draining the thermal loads and pollutants towards the capture point, without creating an air short-circuit.

Texts and standards cited

  • SIA 382/1Ventilation and air-conditioning installations - General principles and performance for sizing and balancing air flow rates
  • CO art. 365Material and ground, contractor's duty to inform in case of circumstances jeopardising the proper execution of the work (para. 3)