Key takeaways
- An exhaust-type hood creates immediate negative pressure in an airtight envelope when no air is supplied.
- Mechanical or motorised make-up air prevents the backflow of odours and pollutants.
- The SIA 382/1 standard governs the limitation of heat losses and hygienic air flow rates.
- The presence of a stove requires strict interlocking to rule out the risk of fatal carbon monoxide.
Negative pressure created by air extraction in an airtight envelope
In current buildings meeting the airtightness requirements of Swiss labels, the building envelope no longer lets in uncontrolled infiltration. Switching on a direct-exhaust kitchen hood instantly extracts between 400 and 800 m³/h from the dwelling. Without a planned air supply, the hood fan draws on the closed volume and creates an abrupt pressure drop in the living spaces. This negative pressure disturbs the overall air flow and degrades the operating point of the hood itself.
- Aeraulic negative pressure in a dwelling
- Negative static pressure difference between the interior space of the dwelling and the outside atmosphere, caused by a net imbalance between the extracted air flow rates and the supplied air flow rates.
When the negative pressure exceeds 4 to 8 Pa in the dwelling, several faults appear in the ventilation networks and interior partitions. Stale air seeks to enter through every available weak point: dried-out floor traps, poorly sealed sanitary drainage stacks or extraction ducts of other wet rooms. Kitchen odours and stagnant emissions are then drawn back in the opposite direction into the service shafts and pushed towards the occupied rooms. Entrance doors and windows become difficult to operate because of the suction force acting on their leaves.
The balanced-ventilation unit in the dwelling is not sized to compensate for these occasional peaks. Its hygienic fresh air flow rates, set in accordance with SIA 382/1, are usually around 120 to 250 m³/h for an entire housing unit. Trying to make up the 600 m³/h deficit of a hood through the balanced-ventilation machine would cause unacceptable air velocities at the supply terminals and a complete loss of acoustic comfort in the bedrooms.
Sizing and interlocking of the make-up air supply
To stabilise the pressure when the hood is in use, the ventilation installer fits a dedicated make-up air supply. This arrangement brings in a volume of outdoor air equivalent to the peak flow rate discharged. The circuit comprises a façade air intake with rain-protection grille, an airtight motorised damper with spring return, an insulated duct to prevent surface condensation, and a baffle or flexible acoustic silencer.
- Positioning the outdoor air intakeInstall the rain-protection grille on a façade sheltered from the prevailing winds, at the required distance from roof outlets, flue gas outlets and the hood's own exhaust.
- Fitting the motorised make-up air damperFit a class 4 airtight motorised damper in an insulated duct. Connect the actuator to the potential-free dry contact supplied by the kitchen hood switch.
- Installing the make-up air diffuserPosition the make-up diffuser in the kitchen or the adjoining living area, oriented so as to avoid any direct cold draught towards the occupants and the worktop.
- Airtightness check and balancingMeasure the residual pressure with a differential manometer between inside and outside, with the hood at full speed, to check that the negative pressure stays below the permitted target value.
| Dwelling configuration | Maximum permissible negative pressure | Make-up solution required |
|---|---|---|
| Airtight dwelling with balanced-ventilation unit only | 8 Pa | Motorised damper interlocked, on external façade |
| Dwelling with sealed stove or fireplace (connected) | 4 Pa | Balanced mechanical supply interlocked with the flow rate |
| Dwelling with open fire or non-sealed appliance | 0 Pa | Direct exhaust prohibited without physical interlock |
On the construction site, the installer checks that the motorised damper opens fully as soon as the hood's first speed is switched on. When flow rates exceed 500 m³/h in the cold Swiss climate, the direct introduction of untempered fresh air can cause marked thermal discomfort. The ventilation installer then proposes an electric pre-heating coil on the make-up air, whose power control is interlocked with the actual supply air flow.
Aeraulic impact on balanced ventilation and odour transfer
In a building meeting current airtightness criteria, the intermittent operation of a kitchen hood with outdoor exhaust directly disturbs the aeraulic balance of the controlled mechanical ventilation unit. A standard domestic hood extracts a flow rate of between 400 m³/h and 800 m³/h at maximum speed. In the absence of dedicated make-up air, this volume is drawn at the expense of the balances calculated under SIA 382/1. The overall negative pressure generated in the dwelling alters the operating points of the balanced-ventilation unit's fans, distorts the flow rates at the terminals and can cause pronounced whistling at the gaps under interior doors.
This uncontrolled negative pressure also causes a critical reversal of passive flows. Outdoor air tries to enter through every available opening of the envelope: service ducts passing through, window joints or sanitary drainage stacks whose traps can be siphoned out under the effect of excessive pressure difference. Even more serious in multi-occupancy housing, the negative pressure created in one apartment can draw stale air from neighbouring dwellings through shared, non-airtight service shafts or exhaust ducting, causing a massive backflow of cooking or sewer odours into the living spaces.
| Hood configuration | Impact on indoor pressure | Disturbance of the balanced ventilation | Integration measures required |
|---|---|---|---|
| Recirculation with activated carbon filters | Neutral (extracted flow equal to reinjected flow) | None on the air volumes in transit | Basic stale air extraction provided by the kitchen CMV terminal |
| Direct exhaust without make-up air | Strong negative pressure (often above 30 Pa) | Complete imbalance, motor overconsumption, backflows | Configuration not compliant with accepted practice in an airtight envelope |
| Exhaust with motorised make-up air damper | Controlled and kept below the critical threshold | Stability of supply and extract flow rates preserved | Direct electrical interlock with the hood's extraction unit |
| Hood connected to the unit with bypass | Balanced by the speed variation of the unit | Temporary increase in overall flow rate without bypassing the exchanger | Reinforced grease filtration stage upstream of the heat recovery |
Interaction with combustion appliances and making installations safe
The major risk posed by the mechanical extraction of a hood in an airtight space concerns the joint presence of a combustion appliance in the same air volume or in a communicating room. Wood stoves, living-room fireplaces or natural-draught boilers rely on the thermal draught of their flue to discharge burnt gases to the outside. If the negative pressure created by the hood's suction exceeds the thermal buoyancy of the flue gases, the draught reverses. Combustion gases, rich in carbon monoxide and soot, are then drawn directly into the occupied space.
The SIA 382/1 standard and fire protection directives strictly govern these situations. To guarantee the safety of occupants, the ventilation installer applies a hardware logic preventing the uncontrolled coexistence of the two phenomena. Where a non-sealed stove or open fire is present, the standard solution is to fit a differential safety pressure switch. This device continuously measures the pressure difference between the room and the outside; as soon as the indoor negative pressure exceeds 4 Pa, the system immediately cuts the electrical supply to the hood's extraction fan or forces the opening of a motorised fresh air damper.
- Diagnosis of the appliances presentCheck the nature of the dwelling's heat generators: sealed appliance with combustion air duct connected to the outside, or natural-draught appliance taking its combustion air from the room.
- Sizing the geometric make-up openingCalculate the free area of the motorised outdoor air damper so as to limit the air velocity to 2 or 3 m/s, thus avoiding whistling noises and an unwanted sensation of cold draught.
- Wiring the safety interlockFit a dry limit-switch contact on the make-up damper or on the hood contactor, ensuring that the extractor cannot run until the make-up air damper is open.
- Checking the negative pressure at commissioningUsing a differential manometer, measure the actual negative pressure value in the room with the hood at maximum speed, interior doors closed and the air supply open.
Remediation protocols in case of excessive negative pressure and commissioning disputes
During self-inspection tests, forced operation of a hood with outdoor exhaust frequently reveals faults in the airtight building envelope. If the differential manometer records a negative pressure caused by the extraction exceeding the permissible threshold at a flue, or if kitchen odours flow back into neighbouring rooms through the service shafts, the air distribution network has a critical non-conformity.
- Diagnosis of air transferUsing a micromanometer, measure the differential pressure between the dwelling and the outside, and between the apartment and the risers. An excessive differential proves that the motorised make-up damper is inadequate or that its façade grille is clogged.
- Checking the electrical interlockCheck the dry contact linking the start of the hood to the make-up air actuator. The hood must not be able to run at higher speeds until the damper's limit-switch contact is confirmed.
- Making the installation safe with regard to combustion appliancesWhere a stove or fireplace is present, test the differential safety pressure switch. If the limit negative pressure is exceeded, the power supply to the hood must cut out to eliminate any risk of smoke poisoning.
If the initial sizing of the make-up air supply does not allow the peak flow rate to be compensated, the ventilation fitter notifies in writing the lack of coordination between the choice of kitchen appliance and the overall air distribution concept. In accordance with art. 365 al. 3 CO, if a circumstance jeopardises the proper execution of the work, the contractor informs the client. The technical report sets out the incompatibility with SIA 382/1 and proposes either throttling the hood, switching to recirculation mode with an activated carbon filter, or core-drilling an additional air passage fitted with its motorised shut-off damper.
Frequently asked questions
How should you react on the construction site if the motorised make-up damper does not open when the hood is switched on?
Immediately cut the control of the extractor hood. Use a multimeter to check for voltage at the actuator and check the mechanical alignment of the airtight damper's linkage. Inspect the outdoor grille to rule out a foreign object blocking the blade. If the micromotor is faulty, lock out the circuit to prevent the extraction from running without incoming air, which preserves the balance of the airtight dwelling.
What should you do when a wood stove backdrafts when the kitchen hood is commissioned?
Stop the mechanical extraction at once and ventilate the room thoroughly by opening the casement windows. Test the safety pressure switch, which should have cut the hood as soon as critical negative pressure began. Check whether the stove has its own combustion air supply connected to the outside. If the fire operates on room air, formally prohibit direct exhaust of the hood without a strict interlock locked by a certified control unit.
Why does the balanced-ventilation unit whistle when the extractor hood is running?
The whistling indicates that the powerful extraction puts the apartment under negative pressure and draws air through the supply and extract terminals of the balanced ventilation. This parasitic draught forces the plenum joints and alters the operating point of the unit's fans. The solution is to check that the dedicated air supply damper opens properly or to reduce the hood's exhaust speed to comply with SIA 382/1.
Is it possible to connect the extraction of a kitchen hood directly to the balanced-ventilation extract network?
This practice is strictly prohibited by accepted practice and professional recommendations. Greasy cooking vapours quickly foul the distribution ducts, clog the fine filters and irreparably damage the unit's heat recovery matrix. The exhaust of a hood necessarily requires an independent smooth metal duct, discharging at roof level or on the façade with a non-return damper, or the exclusive use of a recirculation hood.
Texts and standards cited
- SIA 382/1Ventilation and air-conditioning installations - General principles and required performance for air quality and air flow balance.
- CO art. 365Materials and site: duty to inform the client if a circumstance jeopardises the proper or timely execution of the work (para. 3).