Smoke control and fire dampers: the execution reference
This section is intended for installation foremen, site supervisors and ventilation technicians responsible for positioning, sealing and testing the compartmentation and smoke extraction components. In the event of a fire, safety air-handling installations have no right to fail: they must work immediately, when all other services shut down. This guide details the execution requirements in line with the VKF fire protection directives and Swiss rules of good practice.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 5
100 N
Maximum force exerted on the handle of an escape door during pressurisation of a stairwell
50 Pa
Standard nominal overpressure in closed emergency stairwells
400 °C / 120 min
Standard F400 temperature resistance class for a smoke extraction fan in a multi-occupancy building
200 mm
Minimum spacing between two neighbouring fire damper sleeves without a tested arrangement
72 °C
Nominal rupture temperature of the thermal fuse for a fire damper on a comfort ventilation network
Scope of work of CFC 244 and construction site interfaces
The ventilation systems installer carries out the air-handling fire compartmentation and the smoke and heat extraction networks. Their work ensures the integrity of the fire-resisting separations crossed by ventilation ducts and provides the mechanical extraction of hot gases or the pressurisation of escape routes. The company's responsibility extends from the physical installation of the dampers to the air-handling connection of the smoke extraction fans, including functional tests of tightness and operation.
The limits of services must be clearly identified on the construction site to prevent any coordination gap between trades:
- Electrical work and connections (CFC 232): the electrician brings in the secured supply line and connects the power supply box or the actuator terminal block. The ventilation installer fits the damper, mounts the actuator if it is supplied separately and carries out the internal wiring of the thermal tripping.
- Fire detection and control: the fire detection system, the detection control panel and the issuing of the release signal belong exclusively to installers approved by the VKF. For their part, the ventilation installer checks the mechanical response of their damper or the start-up of their fan unit on a dry contact.
- Building management system (CFC 238): the automation engineer integrates the bus modules, manages the digital addressing and feeds back the end-of-travel statuses. CFC 244 manually and visually checks each actual position, open and closed.
- Structural work and masonry (CFC 211.1): the execution of openings and recesses in load-bearing walls falls under structural work. The approved fire-stopping between the damper sleeve and the masonry is the responsibility of the ventilation contractor in accordance with the manufacturer's declaration of conformity.
Order of execution and logical sequence of chapters
The installation and commissioning of smoke control and compartmentation systems require absolute chronological rigour. An installation defect not detected before the closing of suspended ceilings or the casting of technical shafts generates considerable rework costs and blocks the issuing of the occupancy permit at the fire brigade inspection. This section follows the operational progress of the installation through to final acceptance.
- Positioning and sealing of passive components (K5-01 to K5-03)The first phase concerns the geometric positioning of the fire dampers in solid or lightweight walls. The sealing with mortar or coated mineral wool must correspond strictly to the approval report of the component. Each damper is then subjected to an individual mechanical test of thermal and electrical tripping, recorded in an individual test report. The final documentation includes a precise as-built drawing and accessible inspection hatches to ensure ten-year maintenance.
- Dynamic smoke control and pressurisation systems (K5-04 to K5-06)The second phase deals with the smoke extraction and pressurisation networks. The installation of stairwell smoke control systems requires reconciling a sufficient extraction flow rate with a door opening force that users can manage. Smoke extraction fans must comply with their heat resistance class and be supplied by cables that maintain their function. The separation between compartments prohibits any uncontrolled mixing of air flows between floors.
- Interlocks, specific applications and final acceptance (K5-07 to K5-10)The third phase validates overall operation. The alarm scenarios coordinate the instantaneous shutdown of comfort ventilation and the start-up of smoke control. Extraction networks of commercial kitchens receive particular attention owing to the risk of ignition of grease deposits. Finally, the integrity of the fire-resisting ducts is protected against any subsequent alteration, ensuring acceptance without reservations at the inspection by the fire protection authority.
📘 Chapters in this section 10
Installing a fire damper: position in the wall, sealing and access
Master the installation tolerances and approved mortars to guarantee immediate compliance of every penetration.
Smoke extraction and fire dampersTesting each damper: release, resetting, alarm signalling and test report
Validate each thermal tripping and resetting step to draw up unimpeachable test reports.
Smoke extraction and fire dampersFinding the dampers ten years later: identification, as-built plan and periodic inspection
Establish infallible marking and install functional hatches to make future maintenance easy.
Smoke extraction and fire dampersSmoke control in a stairwell: flow rate, pressurisation and the door that must still open
Balance the supply air flow rate to clear smoke without blocking the escape doors on the landings.
Smoke extraction and fire dampersThe smoke extraction fan: temperature class, fire-resistant wiring and testing
Select the appropriate temperature class and check the secured power supplies before the first start-up.
Smoke extraction and fire dampersDo not connect compartments: fire-stopping at each floor and common riser
Plan the routing of vertical collectors without compromising fire tightness between two separate floors.
Smoke extraction and fire dampersWhat stops and what starts: sequence on alarm and testing of the full chain
Check the closing of the dampers and the switchover of air flows as soon as the fire signal appears.
Smoke extraction and fire dampersProfessional kitchen extraction: grease, cleaning and the risk of duct fire
Design tight, cleanable grease ducts to eliminate the danger of self-ignition in the ducts.
Smoke extraction and fire dampersDo not drill afterwards: fire-resistant duct, repair void and restoration to compliance
Preserve the protective coating of rated networks and repair unauthorised penetrations in accordance with the rules.
Smoke extraction and fire dampersThe safety inspection: what is checked, what blocks approval, how to prepare
Anticipate the hold points of the cantonal inspectors to pass the official technical acceptance inspection.