Key takeaways
- Any damper concealed without external identification remains unknown to the maintenance teams throughout the operating life of the building.
- Durable labelling requires mechanical engraving that is visible from the floor or from below the suspended ceiling.
- The as-built plan records the exact position of the damper blade and that of its access hatch.
- The inspection register formalises the history of the trigger tests required by the VKF fire protection regulations.
Mark the damper on site and record its access on the as-built plans
In a balanced-ventilation (supply and extract) installation, the compartmentation devices pass through fire-rated walls that are often hidden by removable technical suspended ceilings or plasterboard linings. As soon as the finishing-work trades close up the plenums, direct visual identification of a fire damper becomes impossible without rigorous traceability. According to the VKF fire protection regulations, every compartmentation device must undergo regular functional checks. A damper that has been made invisible, or whose mechanical access is blocked, is considered a major defect during the acceptance inspection.
- Fixing the identification plate to the casingRivet a rigid engraved plate made of aluminium or two-layer laminate directly onto the damper's collar, next to the resetting mechanism. Industrial felt-tip markers and printed adhesive strips are prohibited: dust, the heating of the extracted air and cleaning wear them away within a few years.
- Marking the removable access pointStick a standardised red marker disc bearing the damper's identifier on the frame of the access hatch or on the frame of the removable metal suspended ceiling, just below the pivot axis of the blade.
- Dimensioned entry on the CAD as-built planMark each device on the as-built plan with its unique reference (for example CCF-ET02-014), its distance dimensions from the structural axes of the building and the exact position of the 400 by 400 millimetre access hatch.
The as-built plan handed over to site management and the designer is not limited to the layout of the air ducts. It details the fire resistance of the damper (EI 30, EI 60 or EI 90), the closing direction of the blade, the height of the axis above finished floor level and the type of release (spring with 72 °C fusible link or electromechanical safety actuator). Without these graphic data updated after the works, the operator cannot plan interventions without resorting to costly destructive investigations.
Set up the inspection register and organise periodic VKF maintenance
The VKF fire protection regulations require the owner or operator to keep all fire-stopping closure devices in operational working order. As the installer of ventilation systems under CFC 244, you must hand over a complete operating file when the work is delivered. This file includes the initial periodic inspection register, a contractual document that lists all the safety devices installed on the air-handling network.
| Identification data | Item recorded | Purpose of the annual inspection |
|---|---|---|
| Inventory number | Unique CCF identifier and level | Direct correspondence with the as-built plan |
| Technical location | Wall penetration (e.g. stairwell / plant room) | Check of the integrity of the fire-stopping seal |
| Control device | Mechanical fusible link or 24 V actuator | Real release test and check of resetting |
| Condition of the blade | Blade free, intumescent seal clean, no impact damage | Validation of air tightness and full closure |
| Operator's signature | Date of test, technician's name, reservations | Legal proof of maintenance during fire inspection visits |
The first functional test is recorded in this register during the acceptance tests with the ventilation engineer and the fire protection authority. Each damper is released manually to certify that the blade pivots without rubbing against the inner walls of the duct or against a burr from a badly placed self-drilling screw. The condition of the intumescent seals and the real accessibility of the locking screws are inspected at this stage.
When a damper shows abnormal resistance to operation or if the duct has been deformed by a non-compliant load transfer, the operator immediately records the anomaly in the register and informs the building's safety officer in writing. The maintenance register must be kept in the main ventilation plant room, in the immediate vicinity of the air-handling units, and be available at all times to the cantonal fire inspectors.
On-site test protocol and clearing of accessibility defects
The functional test of a fire damper is not limited to triggering the actuator from a central control. For the ventilation fitter, the individual test requires a direct visual check of the closing mechanism, the condition of the blade and the integrity of the intumescent seal. If the device has been walled in or hidden behind a fixed suspended ceiling without an access hatch sized according to the rules of the trade, the statutory inspection becomes impossible from the first year of operation.
- Local mechanical or thermal releaseOperate the manual mechanical trigger or simulate the thermal failure of the fusible link rated at 72 °C without damaging the bimetal strip or the fusible cartridge. Check that the blade swings without rubbing against the galvanised sheet-steel sleeve.
- Check of tightness and end of travelVisually inspect the seating of the blade on the internal stops. The end-of-travel switches must change over cleanly to the closed position with no residual play. Make sure there are no deposits of construction dust on the seals.
- Resetting and check of motor torqueCarry out the motorised or manual key resetting. Monitor the reopening time and the absence of any tight spot in the gears. A worn return spring or a shaft bent by excessive tightening of the duct must be recorded.
- Applying the inspection signatureFill in the riveted label on the damper body: date of the test, name of the technician and result. If the hatch is offset, transfer the signature to the outer frame visible from the room.
Compiling the work file and handing the register over to the operator
Handover of the installation requires a complete operating file to be passed to the owner, guaranteeing the durability of the fire protection in accordance with the VKF fire protection regulations. This file confirms that the physical labelling on the ducts, the graphic identification on the as-built plans and the tabular inventory of the fire safety register match.
| Unique identifier | Exact location | Type of penetration | Dimensions (mm) | Physical access | Test interval |
|---|---|---|---|---|---|
| CCF-R01-01 | Floor 1, north corridor, supply duct axis | EI 60 masonry wall | Ø 250 | 400x400 plaster suspended-ceiling hatch | Annual (VKF) |
| CCF-R01-02 | Floor 1, plant room, exhaust air | EI 90 concrete slab | 500 x 300 | Direct, from a 3-step stepladder | Annual (VKF) |
| CCF-R02-01 | Floor 2, office distribution lobby | EI 60 lightweight partition | Ø 160 | Removable tile marked with red disc | Annual (VKF) |
| CCF-SS1-04 | Basement 1, car park extract / waste room | EI 90 reinforced concrete wall | 600 x 400 | Clear passage below the slab soffit | Six-monthly (VKF) |
The as-built plan, handed over in digital form and displayed in the air-handling plant room, must show each fire damper with its installation level, the reference of the partition it passes through and the identification number shown on the riveted label. If dampers are installed outside direct line of sight, the access route from the landing must appear on the ventilation plan.
At the end of commissioning, the foreman records the operator's training in a dedicated minute. This document certifies the handing over of the mechanical resetting keys, the explanation of the manual release protocols and the transmission of the inspection binder. The operator then takes on the responsibility of recording every future intervention in the register, ensuring that ten years after installation no damper is overlooked during the periodic inspections by the fire protection authority.
Handling accessibility disputes and refusal of conformity at acceptance
On Swiss construction sites, the dispute almost always arises at the time of the full system tests or at the first inspection by the fire protection authority. If an access hatch has been omitted by the plasterer, hidden by CFC 232 cable trays or fitted in a place where it cannot be operated, the fire damper is judged inaccessible. The VKF fire protection regulations require that every compartmentation device can be inspected, cleaned and reset without destroying any building elements.
- Immediate joint inspection recordAs soon as physical access to the damper or to its release mechanism is obstructed by another trade, the foreman records the obstruction with a location reference, photos and the reference of the as-built plan.
- Written notification to site managementThe installer reports that maintenance is impossible in accordance with standard SIA 118. They require a hatch of at least the manufacturer's minimum dimensions to be opened, or the plenum to be cleared, before the compartmentation tests take place.
- Refusal to sign the maintenance registerThe company validates no functional test for a damper that is inaccessible or has no identification label. The anomaly is entered in the safety register handed over to the operator, releasing the ventilation contractor from responsibility.
When the device cannot be found ten years later because of a discrepancy between the work as executed and the as-built plan, the operator has to launch heavy investigations using a thermal camera or endoscope in the ducts. To avoid these destructive opening costs, the fitter must insist on absolute agreement between the durable label fixed to the hatch, the engraved marking on the duct and the alphanumeric code entered in the periodic inspection register.
Frequently asked questions
What should be done when a fire damper has not been entered on the as-built plan handed over to the operator?
The ventilation company must immediately correct the work file. The technician carries out an on-site survey using the self-inspection sheets, records the exact coordinates of the damper, its unique number and the building level. They pass the updated as-built plan and the corresponding register sheet to the operator and to the cantonal fire authority in order to regularise the conformity of the installation.
What solution applies if the plasterer refuses to open the access hatch below the damper?
The ventilation fitter applies standard SIA 118 by sending a formal notice of defects to site management. Since the VKF fire protection regulations require periodic maintenance of every compartmentation device, the ventilation contractor suspends the validation of the tests for this device. Site management must compel the finishing-work trade to create the inspection hatch required by the manufacturer's technical instructions before final acceptance of the work.
How do you replace an identification label that has been torn off or has become illegible in a technical plenum?
The technician consults the as-built plan and the original inspection register to identify the damper concerned without ambiguity. They clean the sheet metal with a degreasing solvent and then fit an engraved plate made of rigid synthetic material or anodised aluminium, riveted or bonded with a technical adhesive resistant to corrosive atmospheres. The alphanumeric identifier and the reference of the fire-rated wall passed through are re-entered on it indelibly.
Who is legally responsible if a damper is not inspected for ten years in the absence of a register?
Primary responsibility for operation and periodic maintenance lies with the building owner under the Swiss fire protection requirements. However, if the ventilation installer has not handed over a complete work file comprising the safety register, the precise as-built plans and the initial test sheets, they may be held liable for failure to inform and for defective execution under their contractual duties as contractor.
Texts and standards cited
- Norme SIA 118General conditions for the execution of construction work and handling of notices of defects
- Directives incendie AEAISwiss fire protection requirements for compartmentation systems and the maintenance of their functional condition
